Storage and dosing systems were treated as connected processes involving tanks, piping, metering, refill arrangements, instrumentation and control verification. Nitrogen modernization linked cryogenic handling with packaging demand; cooling-water treatment linked chemical feed and bleed control with the performance and maintainability of the utility system.