TSK-000247 · Action
Plant Troubleshooting, Maintenance and Operating Support
Plant Operations Support, Maintenance Troubleshooting, and Production Reliability Support
APOLLO AUTOMATIONJAMES WARREN · ENGINEERING & PROJECT LEADERSHIPCASE-102 · Engineering case
Provided plant-engineer-level support beyond capital execution by troubleshooting production failures, maintenance issues, compliance risks, and operator support needs.

Capital work was only one part of the role; the source adds the operating-support layer: emergency troubleshooting, PM oversight, regulatory support, training, plant modifications, and maintenance accountability.
Support scope: emergency response, equipment failure diagnosis, maintenance oversight, PM/SOP compliance, floor-level utility troubleshooting, process inefficiency resolution, food-safety/environmental compliance, non-CapEx plant modifications, and operator/maintenance training.
Improved operational reliability and technical support coverage.
| Measure | Value | Type & meaning | Attribution & operating context |
|---|---|---|---|
| Existing Alcohol-Pump Rated Flow | 55 to 70 GPM | Equipment Rating Equipment reference | Applies to: Plant Operations Support, Maintenance Troubleshooting, and Production Reliability Support flood-remediation review — Existing pumps were oversized relative to dosing demand. |
| Throttled Alcohol-Feed Flow | 2.9 GPM | Observation Reported operating condition | Applies to: Plant Operations Support, Maintenance Troubleshooting, and Production Reliability Support flood-remediation review — Butterfly-valve throttling reduced flow while pumps repeatedly short-cycled. |
| Technical-Support Investigation Duration | 6 h | Observation Recorded work duration | Applies to: Plant Operations Support, Maintenance Troubleshooting, and Production Reliability Support Acetator trend investigation — Time spent with controls software supplier support during the reported investigation. |
Strengthened day-to-day reliability, reduced avoidable downtime, improved maintenance accountability, and supported production continuity.
Supported emergency response, equipment failure diagnosis, maintenance oversight, PM/SOP compliance, floor-level utility troubleshooting, process inefficiency resolution, food-safety/environmental compliance, non-CapEx plant modifications, and operator/maintenance training.
Improved plant operating reliability, measured by recurring support across troubleshooting, maintenance, production, compliance, plant modifications, and training, by functioning as a technical bridge between engineering, maintenance, operations, and production.
Emergency response, PM/SOP compliance, production support, regulatory support, plant modification support, training, and knowledge transfer.
ACTIVITIES IN CONTEXT

TSK-000247 · Action
Plant Operations Support, Maintenance Troubleshooting, and Production Reliability Support

TSK-000248 · Method
Plant Operations Support, Maintenance Troubleshooting, and Production Reliability Support

TSK-001082 · Remediation planning
Plant Operations Support, Maintenance Troubleshooting, and Production Reliability Support

TSK-001083 · Diagnostic action
Plant Operations Support, Maintenance Troubleshooting, and Production Reliability Support

TSK-001084 · Coordination
Plant Operations Support, Maintenance Troubleshooting, and Production Reliability Support

TSK-001085 · Modernization planning
Plant Operations Support, Maintenance Troubleshooting, and Production Reliability Support
Full lifecycle project ownership
Engineering Work and Coordination
Diagnosed plant equipment and utility issues, developed repair/controls-migration plans, supported PM/SOP and training needs, and coordinated operations, maintenance, IT and vendor follow-up.
Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.
Project Team Contribution
Team Contribution
Plant maintenance/operations and IT were coordinated for repair, operating support, computer setup and control-platform transition.
Supplier Participation
Vendor Contribution
Controls software supplier technical support assisted the log investigation and offered a separate forensic-recovery service.
Reviewed an untestable automatic transfer switch and recommended service by a qualified technician, preferably the manufacturer. Developed an acetator-controls renewal plan using parallel legacy operator interface and operator interface operation, operator training, SLC 500-to-compact PLC hardware and workstream migration, and backplane analog I/O in place of external conversion. The plan retained suitable low-voltage cabinets and high-voltage equipment; legacy software compatibility problems informed the migration sequence.
Reviewed flooding after a buried pipe failure beneath alcohol containment damaged explosion-proof pumps, motors, conduit and wiring. Existing 55–70 GPM pumps were throttled to about 2.9 GPM and short-cycled, prompting appropriately sized micro-pump, wiring and conduit replacement planning. Developed four-pump/stainless-plenum and acetator-feed interface questions using and examples; coordinated hazardous-area junction boundaries, existing port connections, deteriorated supports, transfer-pump scope, insurance quotations and sequencing with PLC renewal. Rerouted underground piping work was delayed by rain and trench collapse.
Coordinated remote and planned onsite resolution of tank-measurement and acetator backup-computer setup problems, with three open IT service requests preventing completion. The follow-up linked engineering support to the plant equipment and computer interfaces.
Investigated missing or corrupt acetator trends following an outage, preserved older log files while new logs were used and spent about six hours with controls software supplier technical support. The software vendor offered a time-and-materials forensic assessment at 150 USD per hour to estimate recovery work after receiving the files.