CASE-128 · Engineering case

Wastewater Tanks and Collection System

Engineered wastewater collection, lift-station, aeration, and compliance-support systems for industrial food and beverage operations.

Conceptual engineering visualization: Wastewater Tanks and Collection System
Conceptual engineering visualization · AI generated

Why the Work Mattered

Purpose and Operating Need

Industrial wastewater work required mechanical design, regulatory interpretation, equipment procurement, startup planning, and reporting alignment rather than only tank or pump installation.

Engineering Approach

Engineering Approach

Specification scope: duplex fiberglass lift stations at 100 GPM; SX37CSS 316 stainless non-clog pumps, 5 hp, 230 V, 3-phase, 3 in discharge and solids handling; UC-53 duplex control panels in NEMA 3R stainless enclosures; high-level alarm; four floats; 8 ft x 10 ft and 6 ft x 6 ft basins; stainless/aluminum covers; duplex stainless rail systems; PVC discharge with check/gate valves; 1000 lb floor-mounted hoist with stainless cable and disc-brake winch; two 2,600 gallon cone-bottom tanks; HP-100LL blowers; EPDM diffusers; Schedule 40 PVC process piping; Schedule 80 PVC drains; 2000 ball valves; thermoplastic butterfly valves; galvanized tank stands with stainless epoxy anchors; SDR-26 gravity lines; 20EOZD standby generator with ATS.

Outcome & Engineering Context

Outcome and Context

Developed wastewater collection, lift-station, aeration, and compliance-documentation requirements.

Workstream Results & Impact

Workstream Portfolio Rollup

5,695,000 USD

Environmental Compliance and Recovery Systems

Recorded workstream portfolio reference. This is the workstream-level value and is not a project expenditure or a new total of reassigned projects.

Measures & Operating Detail

MeasureValueType & meaningAttribution & operating context
Duplex Lift-Station Design Flow100 GPMDesign Parameter
Design capacity

Applies to: Wastewater Tanks and Collection System

100 GPM lift stations

Wastewater Pump Motor Rating5 hpEquipment Rating
Equipment Rating

Applies to: Wastewater Tanks and Collection System

5 hp pumps

Engineering scope and design basis

Developed wastewater handling, pump-maintainability, regulatory-reporting, and treatment-system documentation requirements.

Specified duplex fiberglass lift stations at 100 GPM; SX37CSS 316 stainless non-clog pumps, 5 hp, 230 V, 3-phase, 3 in discharge and solids handling; UC-53 duplex control panels in NEMA 3R stainless enclosures; high-level alarm; four floats; 8 ft x 10 ft and 6 ft x 6 ft basins; stainless/aluminum covers; duplex stainless rail systems; PVC discharge with check/gate valves; 1000 lb floor-mounted hoist with stainless cable and disc-brake winch; two 2,600 gallon cone-bottom tanks; HP-100LL blowers; EPDM diffusers; Schedule 40 PVC process piping; Schedule 80 PVC drains; 2000 ball valves; thermoplastic butterfly valves; galvanized tank stands with stainless epoxy anchors; SDR-26 gravity lines; 20EOZD standby generator with ATS.

Developed wastewater-system reliability and compliance-readiness requirements, using duplex 100 GPM lift-station design,2,600 gallonaeration tanks, environmental regulator permit operating permit, Outfall D-003, DMR, groundwater, and toxicity monitoring requirements, by coordinating pump stations, aeration equipment, valves, generator support, and regulatory reporting.

100 GPM lift stations;2,600 gallontanks; 5 hp pumps; 3 in discharge and solids handling; permit operating permit; Outfall D-003; Ceriodaphniadubia96-hour LC50; pH/flow logs; hauling records.

Actions, Methods & Controls

ACTIVITIES IN CONTEXT

Conceptual engineering illustration: verification testing

TSK-000357 · Method

Specified Pumps, Basins, Rails, Hoist, Controls, Alarms, Aeration, Piping, Valves, Generator, DMR Logs, Groundwater Monitoring, Environmental-Regulator Coordination, and Startup Support

Wastewater Tanks and Collection System

Additional Technical Detail

Roles & contributions
  • Project Ownership

    Full lifecycle project ownership

    Direct Work

    Engineered wastewater lift-station, pump, tank, aeration, control, piping, standby-power and regulatory-documentation requirements.

    Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.

Workstream context
All portfolio connections
Related analysis and application artifacts

WHAT COMES NEXT

Complex Challenge?
Let’s Work Through It.

Engineering leadership, capital projects, and independent consulting.

Start a conversation ↗