TSK-000338 · Action
Specified Duplex Fiberglass Lift Stations at 100 GPM
Wastewater Tanks and Collection System
APOLLO AUTOMATIONJAMES WARREN · ENGINEERING & PROJECT LEADERSHIPCASE-128 · Engineering case
Engineered wastewater collection, lift-station, aeration, and compliance-support systems for industrial food and beverage operations.

Industrial wastewater work required mechanical design, regulatory interpretation, equipment procurement, startup planning, and reporting alignment rather than only tank or pump installation.
Specification scope: duplex fiberglass lift stations at 100 GPM; SX37CSS 316 stainless non-clog pumps, 5 hp, 230 V, 3-phase, 3 in discharge and solids handling; UC-53 duplex control panels in NEMA 3R stainless enclosures; high-level alarm; four floats; 8 ft x 10 ft and 6 ft x 6 ft basins; stainless/aluminum covers; duplex stainless rail systems; PVC discharge with check/gate valves; 1000 lb floor-mounted hoist with stainless cable and disc-brake winch; two 2,600 gallon cone-bottom tanks; HP-100LL blowers; EPDM diffusers; Schedule 40 PVC process piping; Schedule 80 PVC drains; 2000 ball valves; thermoplastic butterfly valves; galvanized tank stands with stainless epoxy anchors; SDR-26 gravity lines; 20EOZD standby generator with ATS.
Developed wastewater collection, lift-station, aeration, and compliance-documentation requirements.
Workstream Portfolio Rollup
5,695,000 USD
Environmental Compliance and Recovery Systems
Recorded workstream portfolio reference. This is the workstream-level value and is not a project expenditure or a new total of reassigned projects.
| Measure | Value | Type & meaning | Attribution & operating context |
|---|---|---|---|
| Duplex Lift-Station Design Flow | 100 GPM | Design Parameter Design capacity | Applies to: Wastewater Tanks and Collection System 100 GPM lift stations |
| Wastewater Pump Motor Rating | 5 hp | Equipment Rating Equipment Rating | Applies to: Wastewater Tanks and Collection System 5 hp pumps |
Developed wastewater handling, pump-maintainability, regulatory-reporting, and treatment-system documentation requirements.
Specified duplex fiberglass lift stations at 100 GPM; SX37CSS 316 stainless non-clog pumps, 5 hp, 230 V, 3-phase, 3 in discharge and solids handling; UC-53 duplex control panels in NEMA 3R stainless enclosures; high-level alarm; four floats; 8 ft x 10 ft and 6 ft x 6 ft basins; stainless/aluminum covers; duplex stainless rail systems; PVC discharge with check/gate valves; 1000 lb floor-mounted hoist with stainless cable and disc-brake winch; two 2,600 gallon cone-bottom tanks; HP-100LL blowers; EPDM diffusers; Schedule 40 PVC process piping; Schedule 80 PVC drains; 2000 ball valves; thermoplastic butterfly valves; galvanized tank stands with stainless epoxy anchors; SDR-26 gravity lines; 20EOZD standby generator with ATS.
Developed wastewater-system reliability and compliance-readiness requirements, using duplex 100 GPM lift-station design,2,600 gallonaeration tanks, environmental regulator permit operating permit, Outfall D-003, DMR, groundwater, and toxicity monitoring requirements, by coordinating pump stations, aeration equipment, valves, generator support, and regulatory reporting.
100 GPM lift stations;2,600 gallontanks; 5 hp pumps; 3 in discharge and solids handling; permit operating permit; Outfall D-003; Ceriodaphniadubia96-hour LC50; pH/flow logs; hauling records.
ACTIVITIES IN CONTEXT

TSK-000338 · Action
Wastewater Tanks and Collection System

TSK-000339 · Technical scope
Wastewater Tanks and Collection System

TSK-000340 · Technical scope
Wastewater Tanks and Collection System

TSK-000341 · Technical scope
Wastewater Tanks and Collection System

TSK-000342 · Technical scope
Wastewater Tanks and Collection System

TSK-000343 · Technical scope
Wastewater Tanks and Collection System

TSK-000344 · Technical scope
Wastewater Tanks and Collection System

TSK-000345 · Technical scope
Wastewater Tanks and Collection System

TSK-000346 · Technical scope
Wastewater Tanks and Collection System

TSK-000347 · Technical scope
Wastewater Tanks and Collection System

TSK-000348 · Technical scope
Wastewater Tanks and Collection System

TSK-000349 · Technical scope
Wastewater Tanks and Collection System

TSK-000350 · Technical scope
Wastewater Tanks and Collection System

TSK-000351 · Technical scope
Wastewater Tanks and Collection System

TSK-000352 · Technical scope
Wastewater Tanks and Collection System

TSK-000353 · Technical scope
Wastewater Tanks and Collection System

TSK-000354 · Technical scope
Wastewater Tanks and Collection System

TSK-000355 · Technical scope
Wastewater Tanks and Collection System

TSK-000356 · Technical scope
Wastewater Tanks and Collection System

TSK-000357 · Method
Wastewater Tanks and Collection System

TSK-001066 · Engineering scope
Wastewater Tanks and Collection System
Full lifecycle project ownership
Direct Work
Engineered wastewater lift-station, pump, tank, aeration, control, piping, standby-power and regulatory-documentation requirements.
Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.