TSK-000105 · Action
Evaluated PET and Glass Lines
Packaging Line Performance and Quality Risk Assessment
APOLLO AUTOMATIONJAMES WARREN · ENGINEERING & PROJECT LEADERSHIPCASE-057 · Engineering case
Converted packaging downtime and quality issues into a structured failure-mode and risk-prioritization system.

Packaging reliability required understanding how station-level failure modes translated into QA holds, rework, downtime, production bottlenecks, and customer impact.
Evaluated PET and glass lines; mapped hopper issues, filler CIP failures, capper over-torque, labeler skew, drop packer crashes, capper E-stop faults, conveyor motor trips, nitrogen system failures, operator-induced failures, and mechanical faults; built corrective-action tracking, operator/mechanical training, and bottleneck/failure-trend visualization.
Improved quality-risk visibility and corrective-action prioritization.
Workstream Portfolio Rollup
28,095,000 USD
Production and Packaging Modernization
Recorded workstream portfolio reference. This is the workstream-level value and is not a project expenditure or a new total of reassigned projects.
Improved visibility into product-hold risk, downtime drivers, operator error patterns, equipment faults, quality risks, and SKU compatibility constraints.
Improved packaging-line risk visibility, measured by product-hold and downtime risk matrices, function-to-failure charts, and SKU compatibility validation, by mapping failure modes across filler, capper, labeler, packer, conveyors, nitrogen systems, operators, QA, and maintenance.
Product-hold risk matrix; downtime-risk matrix; SKU compatibility validation; function-to-failure charts; bottleneck and failure-trend visualization.
ACTIVITIES IN CONTEXT

TSK-000105 · Action
Packaging Line Performance and Quality Risk Assessment

TSK-000106 · Action
Packaging Line Performance and Quality Risk Assessment

TSK-000107 · Action
Packaging Line Performance and Quality Risk Assessment

TSK-000108 · Method
Packaging Line Performance and Quality Risk Assessment
Full lifecycle project ownership
Engineering Work and Coordination
Mapped PET/glass-line failure modes and QA/downtime risks, developed corrective-action tracking and training/visualization needs, and coordinated production, QA and maintenance inputs.
Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.
Project Team Contribution
Team Contribution
Production, QA and maintenance contributed to failure-mode, corrective-action and training coordination.