WORK CONTEXT
CIP Chemical-Storage Cage and Sanitary Piping
Follow the connected work in the portfolio.

Roles & Contributions
Project Ownership
Full lifecycle project ownership
Engineering Work and Coordination
Authored and led the CIP chemical-storage cage scope and business case.
Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.
Project Stakeholder
Business Owner Named in the Cage AFE
Named Project Responsibility
Named business owner for the CIP chemical-storage cage AFE.
Mechanical Contractor
Recorded Asset Vendor
Vendor Contribution
Recorded vendor for cage fencing and stainless-steel piping mechanical installation in the CIP-cage capitalization and transaction records.
Connected Work
Additional Technical Detail
Explore 44 detail records
- Competency and project record
AFE approval date (Plant): 2022-03-28.
- Competency and project record
Date placed in service: 2022-10-01.
- Competency and project record
AFE/Enterprise software supplier internal order: 23330354.
- Competency and project record
Requester: James Warren.
- Competency and project record
- Competency and project record
Capitalization completed: Yes.
- Competency and project record
Manufacturing facility context.
- Competency and project record
Project description: Drumming Area CIP Cage.
- Competency and project record
- Competency and project record
- Competency and project record
Requester print: James Warren.
- Competency and project record
Requester date: 2022-11-02.
- Sanitary and aseptic: CIP cage business case
The unbudgeted 2021 safety-investment workbook identifies the exact area as 'Bulk Drumming Warehousee', lists as author or lead and Project stakeholder as business owner, and describes a mixed warehouse and bulk-vinegar area where drums were unloaded, loaded, filled, and stored. It states engineering used about 25 percent of the floor area in 2021 for ceramic filtration and that Quality identified a nearby CIP-cage need.
- Sanitary and aseptic: CIP cage physical scope
The workbook scope specifies a 10-foot by 16-foot vinyl chain-link cage, two 8-foot gates, vinyl posts with stainless-steel anchors set in epoxy, six 1-inch stainless-steel lines from ceramic valve inlets to totes at approximately 200 feet total, six shutoff valves and a manifold, six removable green hoses, a stainless-steel shelf for hoses and PPE, and a chain and lock.
- Sanitary and aseptic: CIP cage costs
Compared the mechanical installation and fencing alternatives, including contingency and execution requirements.
- Sanitary and aseptic: CIP cage benefits and risk
The stated benefits were segregation from forklift traffic and chemical hazards, reduced injury and damage risk, and BRC conformity. The do-nothing case identified possible injury and BRC violation.
- Sanitary and aseptic: CIP cage capitalization
The capitalization form lists plant AFE approval date March 28, 2022; service date October 1, 2022; AFE or enterprise software supplier internal order 23330354; project owner; authorized amount; completion 'yes'; disposal 'no'; actual amount; overrun; asset CIP-cage project; class ME10; cached life 10; room Drumming; vendor mechanical contractor; description 'Cage Fencing and SS Piping Mechanical Install'; plant 330; and department Bulk. The printed signature is dated November 2, 2022; other approval fields are blank.
- Sanitary and aseptic: CIP cage MRM record
The MRM record lists GL 17800 CIP, voucher AP-392505, vendor 403568 Mechanical contractor, transaction date October 24, 2022, journal 817624_099, and print timestamp October 28, 2022 at 12:27:04.
- Sanitary and aseptic: CIP cage layout plan
The location image labels 'Cage w/ open doors (16 ft wide)', a 10-foot cage length, a truck and tote footprint of 4 feet by 12 feet, and an approximate clear area of 32 feet by 32 feet.
- Sanitary and aseptic: Business need
The drumming building was described as a mixed warehouse and bulk-vinegar operation where drums were unloaded, loaded, filled, and stored.
- Sanitary and aseptic: Business need
Engineering was stated to have consumed approximately 25 percent of the floor space during 2021 for the ceramic-filtration process.
- Sanitary and aseptic: Business need
Quality was stated to have identified a need for a nearby CIP chemical cage.
- Sanitary and aseptic: Business need
The proposal states that separating forklift traffic from stored chemicals would reduce compounded risk and help conform to BRC code.
- Sanitary and aseptic: Equipment scope
Vinyl-coated chain-link fence, 10 feet by 16 feet.
- Sanitary and aseptic: Equipment scope
Six 1-inch stainless tubing lines from ceramic-filter chemical-valve inlets to totes.
- Sanitary and aseptic: Equipment scope
Approximately 200 feet, written in the source as approximately 200 ft of 1' tubing.
- Sanitary and aseptic: Equipment scope
Six shutoff valves with a manifold at the cage.
- Sanitary and aseptic: Equipment scope
Six removable green chemical hoses.
- Sanitary and aseptic: Equipment scope
Stainless shelf for hoses and PPE.
- Sanitary and aseptic: Equipment scope
Vinyl-coated posts and stainless anchors set in epoxy.
- Sanitary and aseptic: Alternatives, costs, and risks
Preferred mechanical piping and fencing vendor: mechanical contractor.
- Sanitary and aseptic: Alternatives, costs, and risks
- Sanitary and aseptic: Alternatives, costs, and risks
- Sanitary and aseptic: Alternatives, costs, and risks
Rejected alternative: mechanical contractor, plus contingency, total.
- Sanitary and aseptic: Alternatives, costs, and risks
Install option was characterized as low cost, reducing injury and damage risk, and conforming to BRC code.
- Sanitary and aseptic: Alternatives, costs, and risks
The do-nothing option carried operator-injury and BRC-violation risk.
- Sanitary and aseptic: Asset record
Asset ID exact text: CIP-cage project.
- Sanitary and aseptic: Asset record
Cached useful life: 10 years.
- Sanitary and aseptic: Asset record
Room: Drumming Area.
- Sanitary and aseptic: Asset record
Description: Cage Fencing and SS Piping Mechanical Install.
- Sanitary and aseptic: Asset record
AX cost center/Enterprise software supplier plant: 330.
- Sanitary and aseptic: Asset record
- Sanitary and aseptic: Asset record
ME10 is the 10-year major machinery and equipment class.
- Sanitary and aseptic: Asset record
Asset capitalization threshold shown in the support table: effective 2021-03-01.
Measures & Operating Context
| Measure | Value | Type & meaning | Attribution & operating context |
|---|---|---|---|
| Cage Length | 10 ft | Design Parameter Design dimension | Applies to: CIP chemical-storage cage and sanitary piping Chemical-cage scope |
| Cage Width | 16 ft | Design Parameter Design dimension | Applies to: CIP chemical-storage cage and sanitary piping Chemical-cage scope |
| Gate Count | 2 gates | Scope or Inventory Quantity Design dimension | Applies to: CIP chemical-storage cage and sanitary piping Chemical-cage scope |
| Gate Width | 8 ft | Design Parameter Design dimension | Applies to: CIP chemical-storage cage and sanitary piping Chemical-cage scope |
| Chemical Lines | 6 lines | Scope or Inventory Quantity Scope quantity | Applies to: CIP chemical-storage cage and sanitary piping Chemical-line scope |
| Shutoff Valves | 6 valves | Scope or Inventory Quantity Scope quantity | Applies to: CIP chemical-storage cage and sanitary piping Chemical-line scope |
| Removable Chemical Hoses | 6 hoses | Scope or Inventory Quantity Scope quantity | Applies to: CIP chemical-storage cage and sanitary piping Chemical-line scope |
| Chemical-Line Nominal Size | 1 in | Design Parameter Design dimension | Applies to: CIP chemical-storage cage and sanitary piping Chemical-line scope — One-inch lines are stated explicitly; the separate approximately200-foot source line contains a foot-mark typo and is not a second nominal size. |
| Total Chemical-Line Length | approximately 200 ft | Design Parameter Approximate design quantity | Applies to: CIP chemical-storage cage and sanitary piping Chemical-line scope — Approximate total length across the six lines. |
| Truck-and-Tote Footprint Width | 4 ft | Design Parameter Layout dimension | Applies to: CIP chemical-storage cage and sanitary piping Location plan |
| Truck-and-Tote Footprint Length | 12 ft | Design Parameter Layout dimension | Applies to: CIP chemical-storage cage and sanitary piping Location plan |
| Installation-Clearance Width | 32 ft | Design Parameter Approximate clearance | Applies to: CIP chemical-storage cage and sanitary piping Location plan |
| Installation-Clearance Length | 32 ft | Design Parameter Approximate clearance | Applies to: CIP chemical-storage cage and sanitary piping Location plan |
All portfolio connections (11)
- CIP Chemical-Storage Cage and Sanitary Pipingdescribed by artifactCIP Chemical Cage Signed Project Record ↗
- CIP Chemical-Storage Cage and Sanitary Pipingincludes taskDefined a Controlled Chemical-Storage Cage with a 10-by-16-Foot Vinyl-Coated Chain-Link Footprint, Two 8-Foot Gates, Vinyl-Coated Posts, and Stainless Anchors Set in Epoxy ↗
- CIP Chemical-Storage Cage and Sanitary Pipingincludes taskSpecified Six Stainless-Steel Chemical Lines from Ceramic-Filter Valve Inlets to Totes, a Six-Valve Shutoff Manifold, Six Removable Hoses, and Protected Hose and PPE Storage ↗
- CIP Chemical-Storage Cage and Sanitary Pipingincludes taskDeveloped the Chemical-Cage Business Case Around Separation from Forklift Traffic and Chemical Hazards, Injury and Damage Reduction, and the Stated Food-Quality Requirement ↗
- CIP Chemical-Storage Cage and Sanitary Pipingincludes taskCompared the Two Mechanical-Contractor Cage Quotations with a Separate Contingency Allowance and Documented Their Total Cost Bases ↗
- CIP Chemical-Storage Cage and Sanitary Pipingincludes taskDeveloped the Cage Layout with Gate Swing, a Truck-and-Tote Footprint, and an Approximate Installation-Clearance Area ↗
- CIP Chemical-Storage Cage and Sanitary Pipingincludes taskPrepared the Cage Capitalization Request Tying the Internal Order, in-Service Date, Authorized Amount, Capitalized Amount, Overrun, and Asset Identity Together ↗
- CIP Chemical-Storage Cage and Sanitary Pipingapplies toDrumming-Area CIP Cage ↗
- Chemical Dosing and Storage Modernizationincludes work packageCIP Chemical-Storage Cage and Sanitary Piping ↗
- Florida Manufacturing Facility hosts work packageCIP Chemical-Storage Cage and Sanitary Piping ↗
- Food and Beverage Manufacturerincludes work packageCIP Chemical-Storage Cage and Sanitary Piping ↗