TSK-000928 · Action
Coordinated CMU Enclosure Construction Around Existing Panels
Explore the capability, case, and equipment connections for this activity.

Project Context
PRJ-A-034 · Filtering-Room Acetator Electrical Control Room ↗Capabilities
- Design Protected Electrical Control RoomsRecorded application
Why these connect
The source model links this activity to the capability.
- Protect Electrical Systems from Process ExposureRecorded application
Why these connect
The source model links this activity to the capability.
All Portfolio Connections
All portfolio connections (5)
- Ventilation, Control Rooms, and Equipment Protection — Application Review Review artifact
- Design Protected Electrical Control Rooms Recorded application
- Protect Electrical Systems from Process Exposure Recorded application
- Coordinated CMU Enclosure Construction Around Existing Panels ↗ Existing portfolio connection
- Filtering-Room Acetator Electrical Control Room Existing portfolio connection
Project Ownership and Delivery Context
Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.
Coordinated block construction, concrete curbing, sealed penetrations, doors, lighting and guard rails with exhaust ventilation and motorized-louver interlocks. The integrated scope reduced electrical-component exposure to vapors while connecting civil, mechanical, electrical and controls requirements.