TSK-000065 · Method
Developed the BOM, Purchasing Plan and Documentation; Coordinated Panel Assembly, Pre-Wiring, Continuity Testing, Palletizing and Shipment
MCP, Flowmeter, RA33 Batch Controller, and Panel Build Logistics
APOLLO AUTOMATIONJAMES WARREN · ENGINEERING & PROJECT LEADERSHIPCAP-0052 · Engineering practice
Procurement, Contracts, and Supplier Coordination

Project Delivery & Execution · Procurement, contracts, and supplier coordination

TSK-000065 · Method
MCP, Flowmeter, RA33 Batch Controller, and Panel Build Logistics

TSK-000921 · Action
Tank-Measurement Standards for Future Upgrades
Recorded applicationOwns the full lifecycle of capital projects, connecting safety, reliability, capacity, compliance and business impact with technical scope and execution. Capital planning includes need definition, feasibility, prioritization, AFE development, procurement, construction, commissioning, turnover and post-startup support. Funding decisions are informed by operating requirements, alternatives, interfaces and the resources needed to deliver a usable system.
Field inspections, loop checks, interlock tests and performance verification connect installation quality with the design basis. Turnover brings together as-built information, operating and maintenance documentation, training, punch-list closure and maintenance ownership. Post-startup support closes the loop between equipment acceptance and stable operation.