Capital Strategy and Business Alignment
Translate Growth Forecasts, Customer Demand, Operating Constraints, and Asset Condition into Capital Priorities
Engineering practice and documented application
APOLLO AUTOMATIONJAMES WARREN · ENGINEERING & PROJECT LEADERSHIPPRJ-A-011 · Food and beverage manufacturer
Owned the full lifecycle of this project, connecting capital planning, engineering, delivery and operating readiness. The centrifuge and transfer-loop work required a coordinated set of process and utility interfaces. Power, motor control, water, air, cleaning, waste handling and batch measurement all affected whether the equipment could be operated and maintained effectively.

Workstream: Wine Clarification and Vinegar Polishing Modernization
The centrifuge and transfer-loop work required a coordinated set of process and utility interfaces. Power, motor control, water, air, cleaning, waste handling and batch measurement all affected whether the equipment could be operated and maintained effectively.
Compared supplier documentation, automation, serviceability and performance, then translated evaluation findings into specifications and procurement planning. Flow measurement, batch control and hard-piped transfer arrangements connected separation performance with repeatable production and cleaning practices.
Evaluated centrifuge and CIP interfaces to reduce cleaning labor and DE/bentonite dependency; future hard-piped transfer loops remained integration scope.
Centrifuge CIP Integration
Full lifecycle project ownership
Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.
Full lifecycle project ownership
Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.
Full lifecycle project ownership
Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.
AFE Business Owner
Named Project Responsibility
Named business owner for the SHI-25 winery-to-bulk transfer-loop AFE.
Supplier Named in AFE Estimate
Supplier Reference
Listed supplier for mechanical-installation and piping estimate for the winery-to-bulk transfer loop.
Supplier Named in AFE Estimate
Supplier Reference
Listed supplier for electrical-installation estimate for the winery-to-bulk transfer loop.
Supplier Named in AFE Estimate
Supplier Reference
Listed supplier for commissioning estimate for the winery-to-bulk transfer loop.
Supplier Named in AFE Estimate
Supplier Reference
Listed supplier for transfer-pump motor-control-panel estimate for the winery-to-bulk transfer loop.
Supplier Named in AFE Estimate
Supplier Reference
Listed supplier for flowmeter and batch-controller estimates for the winery-to-bulk transfer loop.
Supplier Named in AFE Estimate
Supplier Reference
Listed supplier for transfer-pump estimate for the winery-to-bulk transfer loop.

Capital Strategy and Business Alignment
Engineering practice and documented application

Project Lifecycle, FEL, and Execution Models
Engineering practice and documented application

Action
Applies capabilities

Procurement, Contracts, and Supplier Coordination
Engineering practice and documented application

Supplier Qualification and Technology Maturity
Engineering practice and documented application

Supplier Qualification and Technology Maturity
Engineering practice and documented application

Supplier Qualification and Technology Maturity
Engineering practice and documented application

Supplier Qualification and Technology Maturity
Engineering practice and documented application

Supplier Qualification and Technology Maturity
Engineering practice and documented application

TSK-000065 · Method
MCP, Flowmeter, RA33 Batch Controller, and Panel Build Logistics

TSK-000068 · Action
Winery Centrifuge Trial Prep and Utility Coordination

TSK-000079 · Method
Winery Centrifuge Trial Prep and Utility Coordination

Lifecycle Artifacts: Startup, Acceptance, and Closeout
Engineering practice and documented application
Owned capital planning and the full delivery lifecycle. The cards connect the applicable responsibilities with the recorded work.

Capital Strategy and Business Alignment
Engineering practice and documented application

Project Lifecycle, FEL, and Execution Models
Engineering practice and documented application

Procurement, Contracts, and Supplier Coordination
Engineering practice and documented application

Supplier Qualification and Technology Maturity
Engineering practice and documented application

Supplier Qualification and Technology Maturity
Engineering practice and documented application

Supplier Qualification and Technology Maturity
Engineering practice and documented application

Supplier Qualification and Technology Maturity
Engineering practice and documented application

Supplier Qualification and Technology Maturity
Engineering practice and documented application





Investment Economics and Lifecycle Analysis
Engineering practice and documented application

Investment Economics and Lifecycle Analysis
Engineering practice and documented application

Investment Economics and Lifecycle Analysis
Engineering practice and documented application

Investment Economics and Lifecycle Analysis
Academic preparation and analytical method

Risk, Uncertainty, and Decision Support
Engineering practice and documented application

Risk, Uncertainty, and Decision Support
Engineering practice and documented application

TSK-000860 · Action
Winery Centrifuge and CIP Interface Engineering + Vinegar Transfer Centrifuge Loop
Recorded application
Statistical Quality, Measurement Systems, and Sampling
Academic preparation and analytical method

Statistical Quality, Measurement Systems, and Sampling
Academic preparation and analytical method

Statistical Quality, Measurement Systems, and Sampling
Academic preparation and analytical method

Statistical Quality, Measurement Systems, and Sampling
Academic preparation and analytical method

Statistical Quality, Measurement Systems, and Sampling
Academic preparation and analytical method

TSK-000965 · Academic analytical method

TSK-000966 · Academic analytical method

TSK-000968 · Academic analytical method

Optimization and Operations Research
Academic preparation and analytical method

Forecasting, Inventory, Supply Chain, and Logistics
Academic preparation and analytical method

Forecasting, Inventory, Supply Chain, and Logistics
Academic preparation and analytical method

Forecasting, Inventory, Supply Chain, and Logistics
Academic preparation and analytical method

Stochastic Models and Uncertainty Analytics
Academic preparation and analytical method

Stochastic Models and Uncertainty Analytics
Academic preparation and analytical method

DOE, Regression, and Empirical Statistical Modeling
Academic preparation and analytical method

DOE, Regression, and Empirical Statistical Modeling
Academic preparation and analytical method

DOE, Regression, and Empirical Statistical Modeling
Academic preparation and analytical method

DOE, Regression, and Empirical Statistical Modeling
Academic preparation and analytical method

Data Analytics, BI, and Operational Reporting
Engineering practice and documented application

Industrial Engineering, Methods, and Work Measurement
Engineering practice and documented application

Industrial Engineering, Methods, and Work Measurement
Engineering practice and documented application

Industrial Engineering, Methods, and Work Measurement
Engineering practice and documented application

Lean Six Sigma, Quality Systems, and Governance Maturity
Engineering practice and documented application

Lean Six Sigma, Quality Systems, and Governance Maturity
Engineering practice and documented application

Lean Six Sigma, Quality Systems, and Governance Maturity
Engineering practice and documented application

Lean Six Sigma, Quality Systems, and Governance Maturity
Engineering practice and documented application

Investment Economics and Lifecycle Analysis
Engineering practice and documented application

Investment Economics and Lifecycle Analysis
Engineering practice and documented application

Investment Economics and Lifecycle Analysis
Engineering practice and documented application

Investment Economics and Lifecycle Analysis
Academic preparation and analytical method

Thermal/Hydraulic Analysis and Engineering-Calculation Review
Engineering practice and documented application

TSK-000860 · Action
Winery Centrifuge and CIP Interface Engineering + Vinegar Transfer Centrifuge Loop
Recorded application
Data Analytics, BI, and Operational Reporting
Engineering practice and documented application

Industrial Engineering, Methods, and Work Measurement
Engineering practice and documented application

Industrial Engineering, Methods, and Work Measurement
Engineering practice and documented application

Industrial Engineering, Methods, and Work Measurement
Engineering practice and documented application

Optimization and Operations Research
Academic preparation and analytical method

Data Analytics, BI, and Operational Reporting
Engineering practice and documented application

Centrifugation, Clarification, and Product Recovery
Engineering practice and documented application

TSK-000048 · Action
Winery Centrifuge Electrical Prep and Utility Coordination

TSK-000049 · Method
Winery Centrifuge Electrical Prep and Utility Coordination

TSK-000074 · Action
Winery Centrifuge Trial Prep and Utility Coordination

TSK-000075 · Method
Winery Centrifuge Trial Prep and Utility Coordination

TSK-000091 · Technical context
Winery Centrifuge and CIP Interface Engineering + Vinegar Transfer Centrifuge Loop

Control Panels, BOMs, Fabrication, and Shipment
Engineering practice and documented application

Control Panels, BOMs, Fabrication, and Shipment
Engineering practice and documented application

Control Panels, BOMs, Fabrication, and Shipment
Engineering practice and documented application

Control Panels, BOMs, Fabrication, and Shipment
Engineering practice and documented application

Control Panels, BOMs, Fabrication, and Shipment
Engineering practice and documented application

TSK-000048 · Action
Winery Centrifuge Electrical Prep and Utility Coordination

TSK-000049 · Method
Winery Centrifuge Electrical Prep and Utility Coordination

TSK-000064 · Action
MCP, Flowmeter, RA33 Batch Controller, and Panel Build Logistics

TSK-000065 · Method
MCP, Flowmeter, RA33 Batch Controller, and Panel Build Logistics

Nitrogen, Bulk Storage, Loadout, and Batch Transfer
Engineering practice and documented application

Nitrogen, Bulk Storage, Loadout, and Batch Transfer
Engineering practice and documented application

TSK-000064 · Action
MCP, Flowmeter, RA33 Batch Controller, and Panel Build Logistics

TSK-000091 · Technical context
Winery Centrifuge and CIP Interface Engineering + Vinegar Transfer Centrifuge Loop

TSK-000859 · Action
Winery Centrifuge and CIP Interface Engineering + Vinegar Transfer Centrifuge Loop
Recorded application
Electrical Distribution Design and Installation Packages
Engineering practice and documented application

TSK-000048 · Action
Winery Centrifuge Electrical Prep and Utility Coordination

TSK-000049 · Method
Winery Centrifuge Electrical Prep and Utility Coordination

Nitrogen, Bulk Storage, Loadout, and Batch Transfer
Engineering practice and documented application

Nitrogen, Bulk Storage, Loadout, and Batch Transfer
Engineering practice and documented application

TSK-000064 · Action
MCP, Flowmeter, RA33 Batch Controller, and Panel Build Logistics

TSK-000091 · Technical context
Winery Centrifuge and CIP Interface Engineering + Vinegar Transfer Centrifuge Loop

TSK-000859 · Action
Winery Centrifuge and CIP Interface Engineering + Vinegar Transfer Centrifuge Loop
Recorded application
CIP Engineering and Cleaning-Sequence Control
Engineering practice and documented application

CIP Engineering and Cleaning-Sequence Control
Engineering practice and documented application

TSK-000091 · Technical context
Winery Centrifuge and CIP Interface Engineering + Vinegar Transfer Centrifuge Loop

TSK-000859 · Action
Winery Centrifuge and CIP Interface Engineering + Vinegar Transfer Centrifuge Loop
Recorded applicationSeparation work connected centrifuges, ceramic filtration, ion-exchange testing, sanitary flow paths and CIP. Evaluated capacity, product quality, cleaning, consumables and recovery, then coordinated utilities, controls, supplier interfaces and operator requirements. The system perspective linked separation performance with downstream production and wastewater effects.

Centrifugation, Clarification, and Product Recovery
Engineering practice and documented application





Bulk-liquid transfer work brought together pump selection, batch controllers, flow measurement, routing, purge provisions and cleaning. Defined interfaces among process equipment, utilities and controls so that material could move reliably between production steps with usable operator control.

Nitrogen, Bulk Storage, Loadout, and Batch Transfer
Engineering practice and documented application

Nitrogen, Bulk Storage, Loadout, and Batch Transfer
Engineering practice and documented application



Action
Applies capabilities
PRJ-A-011 | Winery Centrifuge and CIP Interface Engineering and Vinegar Transfer Centrifuge Loop | classification ASEPTIC_OR_HYGIENIC_PRODUCT_PROCESSING
Compare supplier trial records, separation yield, CIP effort and installation economics, then use operating data to test the selected configuration after startup.
Delivery / Execution.
Capital authorization, supplier and stakeholder coordination, QA/QC, commissioning planning and technical turnover documentation.

TSK-000048 · Action
Winery Centrifuge Electrical Prep and Utility Coordination

TSK-000049 · Method
Winery Centrifuge Electrical Prep and Utility Coordination

TSK-000064 · Action
MCP, Flowmeter, RA33 Batch Controller, and Panel Build Logistics

TSK-000065 · Method
MCP, Flowmeter, RA33 Batch Controller, and Panel Build Logistics

TSK-000068 · Action
Winery Centrifuge Trial Prep and Utility Coordination

TSK-000071 · Action
Winery Centrifuge Trial Prep and Utility Coordination

TSK-000072 · Action
Winery Centrifuge Trial Prep and Utility Coordination

TSK-000074 · Action
Winery Centrifuge Trial Prep and Utility Coordination

TSK-000075 · Method
Winery Centrifuge Trial Prep and Utility Coordination

TSK-000076 · Method
Winery Centrifuge Trial Prep and Utility Coordination

TSK-000077 · Method
Winery Centrifuge Trial Prep and Utility Coordination

TSK-000078 · Method
Winery Centrifuge Trial Prep and Utility Coordination

TSK-000079 · Method
Winery Centrifuge Trial Prep and Utility Coordination

TSK-000859 · Action
Winery Centrifuge and CIP Interface Engineering + Vinegar Transfer Centrifuge Loop

TSK-000860 · Action
Winery Centrifuge and CIP Interface Engineering + Vinegar Transfer Centrifuge Loop

TSK-000861 · Action
Winery Centrifuge and CIP Interface Engineering + Vinegar Transfer Centrifuge Loop

TSK-000091 · Technical context
Winery Centrifuge and CIP Interface Engineering + Vinegar Transfer Centrifuge Loop
Workstream Portfolio Rollup
18,317,000 USD
Wine Clarification and Vinegar Polishing Modernization
Recorded workstream portfolio reference. This is the workstream-level value and is not a project expenditure or a new total of reassigned projects.
| Measure or outcome | Value or result | Meaning and operating scope |
|---|---|---|
| Centrifuge trial comparison | Approximately $120,000 one-time reduction | Installation-cost reduction with approximately 50% higher separation efficiency in the compared approaches. |
| Recorded outcome | Recorded reduced cleaning labor and elimination of DE or bentonite waste within the documented centrifuge scope. | Winery Centrifuge and CIP Interface Engineering + Vinegar Transfer Centrifuge Loop |
| Recorded outcome | Supplier trials recorded 95% solids removal at 40 GPM and 83% at 50 GPM. These are trial observations. | Winery Centrifuge and CIP Interface Engineering + Vinegar Transfer Centrifuge Loop |
| Recorded outcome | Brew 250 testing recorded approximately 36–40 NTU after nozzle correction against a 20–30 NTU target; AFE approval and purchase-order release were separately authorized. | Winery Centrifuge and CIP Interface Engineering + Vinegar Transfer Centrifuge Loop |
| Recorded outcome | Transfer-loop design and installation planning remain distinct from installed or observed centrifuge work. | Winery Centrifuge and CIP Interface Engineering + Vinegar Transfer Centrifuge Loop |
CASE-029 · Engineering case
Prepared the winery for a centrifuge trial and future permanent installation through electrical, transformer, utility, hose and hard-piping planning.
Read the Case ↗CASE-038 · Engineering case
Coordinated motor-control and batch-control panel procurement, buildout, testing, and shipment for field installation.
Read the Case ↗CASE-040 · Engineering case
Prepared the winery for centrifuge-based wine clarification through supplier evaluation, utility upgrades and trial infrastructure.
Read the Case ↗CASE-048 · Engineering case
Coordinated winery centrifuge, CIP and utility interfaces while evaluating supplier performance and future vinegar-transfer-loop requirements.
Read the Case ↗