AC-140

Manufacturing Scheduling and MOM/MES Evaluation — Complete Lifecycle Document Set

76 records from FEL 1 through operational turnover and closeout for Manufacturing Scheduling and MOM/MES Evaluation

Conceptual engineering illustration: project controls
Conceptual engineering visualization · AI generated

Explore the Connections

Project Lifecycle Documents

Explore 76 document purposes and project phases
  • PRJ-B-005-SE-F1-001

    Business Case and Opportunity Statement

    PRJ-B-005 · FEL 1 / Concept · Business and decision documents · 2012-06-06 · PRJ-B-005-WBS-F1-01 · PRJ-B-005-BL-F1-B01

    Establish the controlled business case and opportunity statement needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F1-002

    Project Charter and Initial Scope / Battery Limits

    PRJ-B-005 · FEL 1 / Concept · Business and decision documents · 2012-06-13 · PRJ-B-005-WBS-F1-02 · PRJ-B-005-BL-F1-B01

    Establish the controlled project charter and initial scope / battery limits needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F1-003

    Stakeholder Needs and Operating Context

    PRJ-B-005 · FEL 1 / Concept · Reports · 2012-06-20 · PRJ-B-005-WBS-F1-03 · PRJ-B-005-BL-F1-B01

    Establish the controlled stakeholder needs and operating context needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F1-004

    Concept Alternatives and Screening Study

    PRJ-B-005 · FEL 1 / Concept · Studies and analyses · 2012-06-27 · PRJ-B-005-WBS-F1-04 · PRJ-B-005-BL-F1-B01

    Establish the controlled concept alternatives and screening study needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F1-005

    Preliminary Schedule and Class 5 Cost Estimate

    PRJ-B-005 · FEL 1 / Concept · Studies and analyses · 2012-07-04 · PRJ-B-005-WBS-F1-01 · PRJ-B-005-BL-F1-B01

    Establish the controlled preliminary schedule and class 5 cost estimate needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F1-006

    Initial Risk, Assumption, and Decision Register

    PRJ-B-005 · FEL 1 / Concept · Registers and indexes · 2012-07-11 · PRJ-B-005-WBS-F1-02 · PRJ-B-005-BL-F1-B01

    Establish the controlled initial risk, assumption, and decision register needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F2-001

    Option Study and Weighted Decision Analysis

    PRJ-B-005 · FEL 2 / Select · Studies and analyses · 2012-07-18 · PRJ-B-005-WBS-F2-01 · PRJ-B-005-BL-F2-B01

    Establish the controlled option study and weighted decision analysis needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F2-002

    Design Basis Memorandum

    PRJ-B-005 · FEL 2 / Select · Design definitions · 2012-07-25 · PRJ-B-005-WBS-F2-02 · PRJ-B-005-BL-F2-B01

    Establish the controlled design basis memorandum needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F2-003

    Site, Layout, and Process Alternative Study

    PRJ-B-005 · FEL 2 / Select · Studies and analyses · 2012-08-01 · PRJ-B-005-WBS-F2-03 · PRJ-B-005-BL-F2-B01

    Establish the controlled site, layout, and process alternative study needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F2-004

    Stakeholder and System Requirements Specification

    PRJ-B-005 · FEL 2 / Select · Specifications · 2012-08-09 · PRJ-B-005-WBS-F2-04 · PRJ-B-005-BL-F2-B01

    Establish the controlled stakeholder and system requirements specification needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F2-005

    Concept Architecture and Interface Definition

    PRJ-B-005 · FEL 2 / Select · Design definitions · 2012-08-16 · PRJ-B-005-WBS-F2-01 · PRJ-B-005-BL-F2-B01

    Establish the controlled concept architecture and interface definition needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F2-006

    HAZID / Constructability / Operability Study

    PRJ-B-005 · FEL 2 / Select · Studies and analyses · 2012-08-23 · PRJ-B-005-WBS-F2-02 · PRJ-B-005-BL-F2-B01

    Establish the controlled hazid / constructability / operability study needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F2-007

    Class 4 Estimate and Level 2 Schedule

    PRJ-B-005 · FEL 2 / Select · Studies and analyses · 2012-08-30 · PRJ-B-005-WBS-F2-03 · PRJ-B-005-BL-F2-B01

    Establish the controlled class 4 estimate and level 2 schedule needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F2-008

    Selected Concept and G2 Decision Dossier

    PRJ-B-005 · FEL 2 / Select · Dossiers and manual sets · 2012-09-07 · PRJ-B-005-WBS-F2-04 · PRJ-B-005-BL-F2-B01

    Establish the controlled selected concept and g2 decision dossier needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F3-001

    Defined Scope and Design Deliverables Register

    PRJ-B-005 · FEL 3 / Define · Registers and indexes · 2012-09-14 · PRJ-B-005-WBS-F3-01 · PRJ-B-005-BL-F3-B01

    Establish the controlled defined scope and design deliverables register needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F3-002

    Baselined System Requirements Specification

    PRJ-B-005 · FEL 3 / Define · Specifications · 2012-09-22 · PRJ-B-005-WBS-F3-02 · PRJ-B-005-BL-F3-B01

    Establish the controlled baselined system requirements specification needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F3-003

    System Architecture and Interface Control Document

    PRJ-B-005 · FEL 3 / Define · Design definitions · 2012-09-29 · PRJ-B-005-WBS-F3-03 · PRJ-B-005-BL-F3-B01

    Establish the controlled system architecture and interface control document needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F3-004

    Project Execution Plan

    PRJ-B-005 · FEL 3 / Define · Plans · 2012-10-07 · PRJ-B-005-WBS-F3-04 · PRJ-B-005-BL-F3-B01

    Establish the controlled project execution plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F3-005

    WBS, Work Package, and Responsibility Baseline

    PRJ-B-005 · FEL 3 / Define · Baselines and manifests · 2012-10-14 · PRJ-B-005-WBS-F3-01 · PRJ-B-005-BL-F3-B01

    Establish the controlled wbs, work package, and responsibility baseline needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F3-006

    Class 3 Estimate and Cost Baseline

    PRJ-B-005 · FEL 3 / Define · Baselines and manifests · 2012-10-22 · PRJ-B-005-WBS-F3-02 · PRJ-B-005-BL-F3-B01

    Establish the controlled class 3 estimate and cost baseline needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F3-007

    Coordinated Control Schedule and Resource Plan

    PRJ-B-005 · FEL 3 / Define · Plans · 2012-10-29 · PRJ-B-005-WBS-F3-03 · PRJ-B-005-BL-F3-B01

    Establish the controlled coordinated control schedule and resource plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F3-008

    Procurement and Contracting Plan

    PRJ-B-005 · FEL 3 / Define · Plans · 2012-11-06 · PRJ-B-005-WBS-F3-04 · PRJ-B-005-BL-F3-B01

    Establish the controlled procurement and contracting plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F3-009

    V&V, Acceptance, Commissioning, and Turnover Strategy

    PRJ-B-005 · FEL 3 / Define · Plans · 2012-11-13 · PRJ-B-005-WBS-F3-01 · PRJ-B-005-BL-F3-B01

    Establish the controlled v&v, acceptance, commissioning, and turnover strategy needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F3-010

    FID / G3 Approval and Baseline Manifest

    PRJ-B-005 · FEL 3 / Define · Certificates and approvals · 2012-11-21 · PRJ-B-005-WBS-F3-02 · PRJ-B-005-BL-F3-B01

    Establish the controlled fid / g3 approval and baseline manifest needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-DD-001

    Detailed Design Management Plan

    PRJ-B-005 · Detailed Design · Plans · 2012-11-28 · PRJ-B-005-WBS-DD-01 · PRJ-B-005-BL-DD-B01

    Establish the controlled detailed design management plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-DD-002

    Process / Functional Design Package

    PRJ-B-005 · Detailed Design · Design definitions · 2012-12-06 · PRJ-B-005-WBS-DD-02 · PRJ-B-005-BL-DD-B01

    Establish the controlled process / functional design package needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-DD-003

    Mechanical and Piping Design Package

    PRJ-B-005 · Detailed Design · Design definitions · 2012-12-13 · PRJ-B-005-WBS-DD-03 · PRJ-B-005-BL-DD-B01

    Establish the controlled mechanical and piping design package needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-DD-004

    Electrical Power and Controls Design Package

    PRJ-B-005 · Detailed Design · Design definitions · 2012-12-21 · PRJ-B-005-WBS-DD-04 · PRJ-B-005-BL-DD-B01

    Establish the controlled electrical power and controls design package needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-DD-005

    Civil, Structural, and Architectural Design Package

    PRJ-B-005 · Detailed Design · Design definitions · 2012-12-28 · PRJ-B-005-WBS-DD-01 · PRJ-B-005-BL-DD-B01

    Establish the controlled civil, structural, and architectural design package needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-DD-006

    Instrumentation, Automation, and Data Design Package

    PRJ-B-005 · Detailed Design · Design definitions · 2013-01-05 · PRJ-B-005-WBS-DD-02 · PRJ-B-005-BL-DD-B01

    Establish the controlled instrumentation, automation, and data design package needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-DD-007

    Safety, Reliability, and Maintainability Analysis

    PRJ-B-005 · Detailed Design · Studies and analyses · 2013-01-12 · PRJ-B-005-WBS-DD-03 · PRJ-B-005-BL-DD-B01

    Establish the controlled safety, reliability, and maintainability analysis needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-DD-008

    Design Review and Comment Resolution Record

    PRJ-B-005 · Detailed Design · Records and logs · 2013-01-20 · PRJ-B-005-WBS-DD-04 · PRJ-B-005-BL-DD-B01

    Establish the controlled design review and comment resolution record needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-DD-009

    Issued-for-Construction Design Baseline

    PRJ-B-005 · Detailed Design · Baselines and manifests · 2013-01-27 · PRJ-B-005-WBS-DD-01 · PRJ-B-005-BL-DD-B01

    Establish the controlled issued-for-construction design baseline needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-DD-010

    Design V&V Evidence Index

    PRJ-B-005 · Detailed Design · Registers and indexes · 2013-02-04 · PRJ-B-005-WBS-DD-02 · PRJ-B-005-BL-DD-B01

    Establish the controlled design v&v evidence index needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-PR-001

    Procurement Package and Bid List

    PRJ-B-005 · Procurement · Registers and indexes · 2013-02-11 · PRJ-B-005-WBS-PR-01 · PRJ-B-005-BL-PR-B01

    Establish the controlled procurement package and bid list needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-PR-002

    Technical Requisition and Datasheet Set

    PRJ-B-005 · Procurement · Specifications · 2013-02-19 · PRJ-B-005-WBS-PR-02 · PRJ-B-005-BL-PR-B01

    Establish the controlled technical requisition and datasheet set needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-PR-003

    Commercial Bid Evaluation and Award Recommendation

    PRJ-B-005 · Procurement · Studies and analyses · 2013-02-27 · PRJ-B-005-WBS-PR-03 · PRJ-B-005-BL-PR-B01

    Establish the controlled commercial bid evaluation and award recommendation needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-PR-004

    Technical Bid Evaluation and Clarification Log

    PRJ-B-005 · Procurement · Registers and indexes · 2013-03-06 · PRJ-B-005-WBS-PR-04 · PRJ-B-005-BL-PR-B01

    Establish the controlled technical bid evaluation and clarification log needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-PR-005

    Purchase Order / Contract and Scope of Supply

    PRJ-B-005 · Procurement · Business and decision documents · 2013-03-14 · PRJ-B-005-WBS-PR-01 · PRJ-B-005-BL-PR-B01

    Establish the controlled purchase order / contract and scope of supply needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-PR-006

    Supplier Quality and Inspection Plan

    PRJ-B-005 · Procurement · Plans · 2013-03-22 · PRJ-B-005-WBS-PR-02 · PRJ-B-005-BL-PR-B01

    Establish the controlled supplier quality and inspection plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-PR-007

    Vendor Data, Submittal, and RFI Register

    PRJ-B-005 · Procurement · Registers and indexes · 2013-03-29 · PRJ-B-005-WBS-PR-03 · PRJ-B-005-BL-PR-B01

    Establish the controlled vendor data, submittal, and rfi register needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-PR-008

    Expediting and Logistics Plan

    PRJ-B-005 · Procurement · Plans · 2013-04-06 · PRJ-B-005-WBS-PR-04 · PRJ-B-005-BL-PR-B01

    Establish the controlled expediting and logistics plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-PR-009

    Factory Acceptance Test Procedure and Report

    PRJ-B-005 · Procurement · Procedures · 2013-04-14 · PRJ-B-005-WBS-PR-01 · PRJ-B-005-BL-PR-B01

    Establish the controlled factory acceptance test procedure and report needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-FC-001

    Construction / Fabrication Execution Plan

    PRJ-B-005 · Fabrication / Construction · Plans · 2013-04-25 · PRJ-B-005-WBS-FC-01 · PRJ-B-005-BL-FC-B01

    Establish the controlled construction / fabrication execution plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-FC-002

    Site Logistics, Safety, and Permit Plan

    PRJ-B-005 · Fabrication / Construction · Plans · 2013-05-07 · PRJ-B-005-WBS-FC-02 · PRJ-B-005-BL-FC-B01

    Establish the controlled site logistics, safety, and permit plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-FC-003

    Fabrication Drawing and Shop Package

    PRJ-B-005 · Fabrication / Construction · Design definitions · 2013-05-18 · PRJ-B-005-WBS-FC-03 · PRJ-B-005-BL-FC-B01

    Establish the controlled fabrication drawing and shop package needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-FC-004

    Field Work Package and Installation Method

    PRJ-B-005 · Fabrication / Construction · Procedures · 2013-05-30 · PRJ-B-005-WBS-FC-04 · PRJ-B-005-BL-FC-B01

    Establish the controlled field work package and installation method needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-FC-005

    Inspection and Test Plan / Quality Records

    PRJ-B-005 · Fabrication / Construction · Plans · 2013-06-10 · PRJ-B-005-WBS-FC-01 · PRJ-B-005-BL-FC-B01

    Establish the controlled inspection and test plan / quality records needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-FC-006

    Daily Progress and Quantity Report

    PRJ-B-005 · Fabrication / Construction · Records and logs · 2013-06-22 · PRJ-B-005-WBS-FC-02 · PRJ-B-005-BL-FC-B01

    Establish the controlled daily progress and quantity report needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-FC-007

    Nonconformity and Corrective Action Record

    PRJ-B-005 · Fabrication / Construction · Records and logs · 2013-07-03 · PRJ-B-005-WBS-FC-03 · PRJ-B-005-BL-FC-B01

    Establish the controlled nonconformity and corrective action record needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-FC-008

    Redline Drawing and Field Change Register

    PRJ-B-005 · Fabrication / Construction · Registers and indexes · 2013-07-15 · PRJ-B-005-WBS-FC-04 · PRJ-B-005-BL-FC-B01

    Establish the controlled redline drawing and field change register needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-FC-009

    Mechanical Completion Certificate and Punch List

    PRJ-B-005 · Fabrication / Construction · Certificates and approvals · 2013-07-27 · PRJ-B-005-WBS-FC-01 · PRJ-B-005-BL-FC-B01

    Establish the controlled mechanical completion certificate and punch list needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-IN-001

    System Coordination and Interface Plan

    PRJ-B-005 · Installation and Interface Coordination · Plans · 2013-08-03 · PRJ-B-005-WBS-IN-01 · PRJ-B-005-BL-IN-B01

    Establish the controlled system coordination and interface plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-IN-002

    Installation Completion and Walkdown Record

    PRJ-B-005 · Installation and Interface Coordination · Records and logs · 2013-08-10 · PRJ-B-005-WBS-IN-02 · PRJ-B-005-BL-IN-B01

    Establish the controlled installation completion and walkdown record needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-IN-003

    Controls / Software Configuration Baseline

    PRJ-B-005 · Installation and Interface Coordination · Baselines and manifests · 2013-08-18 · PRJ-B-005-WBS-IN-03 · PRJ-B-005-BL-IN-B01

    Establish the controlled controls / software configuration baseline needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-IN-004

    Loop Check, Continuity, and Calibration Records

    PRJ-B-005 · Installation and Interface Coordination · Records and logs · 2013-08-25 · PRJ-B-005-WBS-IN-04 · PRJ-B-005-BL-IN-B01

    Establish the controlled loop check, continuity, and calibration records needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-IN-005

    Cleaning, Flushing, and Pre-Operational Test Record

    PRJ-B-005 · Installation and Interface Coordination · Procedures · 2013-09-02 · PRJ-B-005-WBS-IN-01 · PRJ-B-005-BL-IN-B01

    Establish the controlled cleaning, flushing, and pre-operational test record needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-IN-006

    System Completion Dossier

    PRJ-B-005 · Installation and Interface Coordination · Dossiers and manual sets · 2013-09-09 · PRJ-B-005-WBS-IN-02 · PRJ-B-005-BL-IN-B01

    Establish the controlled system completion dossier needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-IN-007

    Ready-for-Commissioning Certificate

    PRJ-B-005 · Installation and Interface Coordination · Certificates and approvals · 2013-09-17 · PRJ-B-005-WBS-IN-03 · PRJ-B-005-BL-IN-B01

    Establish the controlled ready-for-commissioning certificate needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-CS-001

    Commissioning and Startup Plan

    PRJ-B-005 · Commissioning / Startup · Plans · 2013-09-24 · PRJ-B-005-WBS-CS-01 · PRJ-B-005-BL-CS-B01

    Establish the controlled commissioning and startup plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-CS-002

    Pre-Startup Safety / Operational Readiness Review

    PRJ-B-005 · Commissioning / Startup · Reports · 2013-10-01 · PRJ-B-005-WBS-CS-02 · PRJ-B-005-BL-CS-B01

    Establish the controlled pre-startup safety / operational readiness review needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-CS-003

    Commissioning Procedure and Results

    PRJ-B-005 · Commissioning / Startup · Procedures · 2013-10-08 · PRJ-B-005-WBS-CS-03 · PRJ-B-005-BL-CS-B01

    Establish the controlled commissioning procedure and results needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-CS-004

    Startup and Ramp-Up Log

    PRJ-B-005 · Commissioning / Startup · Registers and indexes · 2013-10-15 · PRJ-B-005-WBS-CS-04 · PRJ-B-005-BL-CS-B01

    Establish the controlled startup and ramp-up log needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-CS-005

    Performance Guarantee and Capacity Test Report

    PRJ-B-005 · Commissioning / Startup · Studies and analyses · 2013-10-22 · PRJ-B-005-WBS-CS-01 · PRJ-B-005-BL-CS-B01

    Establish the controlled performance guarantee and capacity test report needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-CS-006

    Reliability Demonstration Run Report

    PRJ-B-005 · Commissioning / Startup · Studies and analyses · 2013-10-29 · PRJ-B-005-WBS-CS-02 · PRJ-B-005-BL-CS-B01

    Establish the controlled reliability demonstration run report needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-CS-007

    Operator and Maintainer Training Record

    PRJ-B-005 · Commissioning / Startup · Records and logs · 2013-11-05 · PRJ-B-005-WBS-CS-03 · PRJ-B-005-BL-CS-B01

    Establish the controlled operator and maintainer training record needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-CS-008

    Commissioning Anomaly and Punch Closure Register

    PRJ-B-005 · Commissioning / Startup · Registers and indexes · 2013-11-12 · PRJ-B-005-WBS-CS-04 · PRJ-B-005-BL-CS-B01

    Establish the controlled commissioning anomaly and punch closure register needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-CS-009

    Performance Acceptance Certificate

    PRJ-B-005 · Commissioning / Startup · Certificates and approvals · 2013-11-20 · PRJ-B-005-WBS-CS-01 · PRJ-B-005-BL-CS-B01

    Establish the controlled performance acceptance certificate needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-OT-001

    As-Built / as-Configured Baseline Manifest

    PRJ-B-005 · Operational Turnover / Closeout · Baselines and manifests · 2013-11-25 · PRJ-B-005-WBS-OT-01 · PRJ-B-005-BL-OT-B01

    Establish the controlled as-built / as-configured baseline manifest needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-OT-002

    Operations and Maintenance Manual Set

    PRJ-B-005 · Operational Turnover / Closeout · Dossiers and manual sets · 2013-11-30 · PRJ-B-005-WBS-OT-02 · PRJ-B-005-BL-OT-B01

    Establish the controlled operations and maintenance manual set needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-OT-003

    Asset, Spare Parts, and Warranty Register

    PRJ-B-005 · Operational Turnover / Closeout · Registers and indexes · 2013-12-05 · PRJ-B-005-WBS-OT-03 · PRJ-B-005-BL-OT-B01

    Establish the controlled asset, spare parts, and warranty register needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-OT-004

    Final Technical and Commercial Acceptance Certificate

    PRJ-B-005 · Operational Turnover / Closeout · Certificates and approvals · 2013-12-10 · PRJ-B-005-WBS-OT-04 · PRJ-B-005-BL-OT-B01

    Establish the controlled final technical and commercial acceptance certificate needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-OT-005

    Operational Turnover Dossier and Ownership Transfer

    PRJ-B-005 · Operational Turnover / Closeout · Dossiers and manual sets · 2013-12-15 · PRJ-B-005-WBS-OT-01 · PRJ-B-005-BL-OT-B01

    Establish the controlled operational turnover dossier and ownership transfer needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-OT-006

    Final Cost, Schedule, Contract, and Claims Closeout

    PRJ-B-005 · Operational Turnover / Closeout · Studies and analyses · 2013-12-20 · PRJ-B-005-WBS-OT-02 · PRJ-B-005-BL-OT-B01

    Establish the controlled final cost, schedule, contract, and claims closeout needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-OT-007

    Controlled Records Archive and Retrieval Index

    PRJ-B-005 · Operational Turnover / Closeout · Registers and indexes · 2013-12-25 · PRJ-B-005-WBS-OT-03 · PRJ-B-005-BL-OT-B01

    Establish the controlled controlled records archive and retrieval index needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-OT-008

    Lessons Learned and Benefit Realization Baseline

    PRJ-B-005 · Operational Turnover / Closeout · Baselines and manifests · 2013-12-31 · PRJ-B-005-WBS-OT-04 · PRJ-B-005-BL-OT-B01

    Establish the controlled lessons learned and benefit realization baseline needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

All Portfolio Connections

All portfolio connections (6)

WHAT COMES NEXT

Complex Challenge?
Let’s Work Through It.

Engineering leadership, capital projects, and independent consulting.

Start a conversation ↗