Capital Strategy and Business Alignment
Translate Growth Forecasts, Customer Demand, Operating Constraints, and Asset Condition into Capital Priorities
Engineering practice and documented application
APOLLO AUTOMATIONJAMES WARREN · ENGINEERING & PROJECT LEADERSHIPPRJ-B-005 · Food ingredients manufacturer
Owned the full project lifecycle, connecting capital planning, engineering, procurement, construction and operating readiness.

Workstream: OT Network and Controls Transformation
Led manufacturing-scheduling and MOM/MES evaluation for 78 part variations, 20 processes, and three customer types, covering requirements, supplier evaluation, pilot deployment, user acceptance, training, cutover, and support ownership.
Manufacturing systems and scheduling support for operational readiness, cutover, training, and support ownership.
Manufacturing scheduling and MOM/MES solution covering voice-of-customer and operating requirements, process and data interfaces, COTS and vendor evaluation, configuration, scheduling visibility, user acceptance, cutover, training and support ownership.
Full lifecycle project ownership
Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.

Capital Strategy and Business Alignment
Engineering practice and documented application

Project Lifecycle, FEL, and Execution Models
Engineering practice and documented application

Project Lifecycle, FEL, and Execution Models
Engineering practice and documented application

Project Lifecycle, FEL, and Execution Models
Engineering practice and documented application

Project Lifecycle, FEL, and Execution Models
Engineering practice and documented application

TSK-000622 · Action
Manufacturing Scheduling and MOM/MES Evaluation

TSK-000632 · Action
Manufacturing Scheduling and MOM/MES Evaluation

Action
Applies capabilities

Workstream, Portfolio, and Stakeholder Leadership
Engineering practice and documented application

Workstream, Portfolio, and Stakeholder Leadership
Engineering practice and documented application

Lifecycle Artifacts: Front-End and Design
Engineering practice and documented application

TSK-000623 · Action
Manufacturing Scheduling and MOM/MES Evaluation

Scheduling, Shutdowns, and Execution Sequencing
Engineering practice and documented application

Lifecycle Artifacts: Procurement and Construction
Engineering practice and documented application

Lifecycle Artifacts: Procurement and Construction
Engineering practice and documented application

TSK-000623 · Action
Manufacturing Scheduling and MOM/MES Evaluation

TSK-000628 · Action
Manufacturing Scheduling and MOM/MES Evaluation

AFE and Capital-Governance Controls
Engineering practice and documented application

Estimating, Financial Control, and Expense Traceability
Engineering practice and documented application

Procurement, Contracts, and Supplier Coordination
Engineering practice and documented application

Procurement, Contracts, and Supplier Coordination
Engineering practice and documented application

Procurement, Contracts, and Supplier Coordination
Engineering practice and documented application

TSK-000628 · Action
Manufacturing Scheduling and MOM/MES Evaluation

TSK-000632 · Action
Manufacturing Scheduling and MOM/MES Evaluation

Estimating, Financial Control, and Expense Traceability
Engineering practice and documented application

Scheduling, Shutdowns, and Execution Sequencing
Engineering practice and documented application

TSK-000623 · Action
Manufacturing Scheduling and MOM/MES Evaluation

TSK-000632 · Action
Manufacturing Scheduling and MOM/MES Evaluation

Commissioning, Qualification, Acceptance, and Turnover
Engineering practice and documented application

Commissioning, Qualification, Acceptance, and Turnover
Engineering practice and documented application

TSK-000628 · Action
Manufacturing Scheduling and MOM/MES Evaluation

TSK-000632 · Action
Manufacturing Scheduling and MOM/MES Evaluation

Data Analytics, BI, and Operational Reporting
Engineering practice and documented application
Owned capital planning and the full delivery lifecycle. The cards connect the applicable responsibilities with the recorded work.

Capital Strategy and Business Alignment
Engineering practice and documented application

Project Lifecycle, FEL, and Execution Models
Engineering practice and documented application

Project Lifecycle, FEL, and Execution Models
Engineering practice and documented application

Project Lifecycle, FEL, and Execution Models
Engineering practice and documented application

Project Lifecycle, FEL, and Execution Models
Engineering practice and documented application

Workstream, Portfolio, and Stakeholder Leadership
Engineering practice and documented application

AFE and Capital-Governance Controls
Engineering practice and documented application

Estimating, Financial Control, and Expense Traceability
Engineering practice and documented application

Scheduling, Shutdowns, and Execution Sequencing
Engineering practice and documented application

Procurement, Contracts, and Supplier Coordination
Engineering practice and documented application

Procurement, Contracts, and Supplier Coordination
Engineering practice and documented application

Procurement, Contracts, and Supplier Coordination
Engineering practice and documented application

Commissioning, Qualification, Acceptance, and Turnover
Engineering practice and documented application

Commissioning, Qualification, Acceptance, and Turnover
Engineering practice and documented application

Lifecycle Artifacts: Procurement and Construction
Engineering practice and documented application

Lifecycle Artifacts: Procurement and Construction
Engineering practice and documented application

Investment Economics and Lifecycle Analysis
Engineering practice and documented application

Investment Economics and Lifecycle Analysis
Engineering practice and documented application

Risk, Uncertainty, and Decision Support
Engineering practice and documented application

Risk, Uncertainty, and Decision Support
Engineering practice and documented application

Risk, Uncertainty, and Decision Support
Engineering practice and documented application

Risk, Uncertainty, and Decision Support
Engineering practice and documented application

Statistical Quality, Measurement Systems, and Sampling
Academic preparation and analytical method

Statistical Quality, Measurement Systems, and Sampling
Academic preparation and analytical method

Optimization and Operations Research
Academic preparation and analytical method

Optimization and Operations Research
Academic preparation and analytical method

Optimization and Operations Research
Academic preparation and analytical method

Optimization and Operations Research
Engineering practice and documented application

Optimization and Operations Research
Academic preparation and analytical method

Optimization and Operations Research
Academic preparation and analytical method

TSK-000976 · Academic analytical method

TSK-000977 · Academic analytical method

TSK-000978 · Academic analytical method

Forecasting, Inventory, Supply Chain, and Logistics
Academic preparation and analytical method

Forecasting, Inventory, Supply Chain, and Logistics
Academic preparation and analytical method

Forecasting, Inventory, Supply Chain, and Logistics
Academic preparation and analytical method

Forecasting, Inventory, Supply Chain, and Logistics
Academic preparation and analytical method

Forecasting, Inventory, Supply Chain, and Logistics
Academic preparation and analytical method

Forecasting, Inventory, Supply Chain, and Logistics
Academic preparation and analytical method

Forecasting, Inventory, Supply Chain, and Logistics
Engineering practice and documented application

TSK-000979 · Academic analytical method

TSK-000980 · Academic analytical method

TSK-000981 · Academic analytical method

TSK-000982 · Academic analytical method

Stochastic Models and Uncertainty Analytics
Academic preparation and analytical method

Stochastic Models and Uncertainty Analytics
Academic preparation and analytical method

Stochastic Models and Uncertainty Analytics
Academic preparation and analytical method

Stochastic Models and Uncertainty Analytics
Academic preparation and analytical method

TSK-000984 · Academic analytical method

TSK-000985 · Academic analytical method

TSK-000986 · Academic analytical method

DOE, Regression, and Empirical Statistical Modeling
Academic preparation and analytical method

DOE, Regression, and Empirical Statistical Modeling
Academic preparation and analytical method

DOE, Regression, and Empirical Statistical Modeling
Academic preparation and analytical method

DOE, Regression, and Empirical Statistical Modeling
Academic preparation and analytical method

DOE, Regression, and Empirical Statistical Modeling
Academic preparation and analytical method

DOE, Regression, and Empirical Statistical Modeling
Academic preparation and analytical method

Data Analytics, BI, and Operational Reporting
Engineering practice and documented application

Data Analytics, BI, and Operational Reporting
Engineering practice and documented application

Data Analytics, BI, and Operational Reporting
Engineering practice and documented application

Data Analytics, BI, and Operational Reporting
Engineering practice and documented application

Data Analytics, BI, and Operational Reporting
Engineering practice and documented application

Industrial Engineering, Methods, and Work Measurement
Engineering practice and documented application

Industrial Engineering, Methods, and Work Measurement
Engineering practice and documented application

Lean Six Sigma, Quality Systems, and Governance Maturity
Engineering practice and documented application

Lean Six Sigma, Quality Systems, and Governance Maturity
Engineering practice and documented application

Lean Six Sigma, Quality Systems, and Governance Maturity
Engineering practice and documented application

Lean Six Sigma, Quality Systems, and Governance Maturity
Engineering practice and documented application

Investment Economics and Lifecycle Analysis
Engineering practice and documented application

Investment Economics and Lifecycle Analysis
Engineering practice and documented application

Data Analytics, BI, and Operational Reporting
Engineering practice and documented application

Data Analytics, BI, and Operational Reporting
Engineering practice and documented application

Data Analytics, BI, and Operational Reporting
Engineering practice and documented application

Data Analytics, BI, and Operational Reporting
Engineering practice and documented application

Data Analytics, BI, and Operational Reporting
Engineering practice and documented application

Industrial Engineering, Methods, and Work Measurement
Engineering practice and documented application

Industrial Engineering, Methods, and Work Measurement
Engineering practice and documented application

Optimization and Operations Research
Academic preparation and analytical method

Optimization and Operations Research
Academic preparation and analytical method

Optimization and Operations Research
Academic preparation and analytical method

Optimization and Operations Research
Engineering practice and documented application

Optimization and Operations Research
Academic preparation and analytical method

Optimization and Operations Research
Academic preparation and analytical method

Data Analytics, BI, and Operational Reporting
Engineering practice and documented application

Data Analytics, BI, and Operational Reporting
Engineering practice and documented application

Data Analytics, BI, and Operational Reporting
Engineering practice and documented application

Data Analytics, BI, and Operational Reporting
Engineering practice and documented application

Data Analytics, BI, and Operational Reporting
Engineering practice and documented application

TSK-000976 · Academic analytical method

TSK-000977 · Academic analytical method

TSK-000978 · Academic analytical method

OT Configuration, Protocols, Troubleshooting, and Cutover
Engineering practice and documented application

TSK-000945 · Action
Manufacturing Scheduling and MOM/MES Evaluation
Recorded applicationMES/MOM/COTS evaluation, requirements engineering, vendor research, scheduling visibility, enterprise software supplier/spreadsheet framing, and weighted requirements.
Manufacturing scheduling and MOM/MES solution from VOC and requirements through vendor selection, configuration, UAT, cutover, training, and support ownership; Budget: $2,600,000. Operational scheduling and manufacturing-visibility solution; transferred and closed.
Delivered digital-manufacturing scope included VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support ownership. The operating environment included 78 part variations, 20 processes, three customer types, more than 40 suppliers researched, more than 15 contacted, and a four-to-eight-week turnaround; MOM/MES scheduling solution; 78 part variations; 20 processes; 3 customer types; operational turnover completed
MOM/MES and scheduling-system evaluation, requirements engineering, VOC capture, COTS research, weighted decision matrices, enterprise software supplier/data framing, and industrial scheduling decision support; Use as industrial engineering, manufacturing systems, scheduling, and decision-support evidence.
Requirements, vendor evaluation, configuration, interfaces, UAT, cutover, training and support handoff; Supported 78 part variations, 20 processes and three customer types
PRJ-B-005 | Manufacturing Scheduling and MOM/MES Evaluation | classification ASEPTIC_OR_HYGIENIC_PRODUCT_PROCESSING

TSK-000622 · Action
Manufacturing Scheduling and MOM/MES Evaluation

TSK-000623 · Action
Manufacturing Scheduling and MOM/MES Evaluation

TSK-000625 · Action
Manufacturing Scheduling and MOM/MES Evaluation

TSK-000626 · Supplier evaluation
Manufacturing Scheduling and MOM/MES Evaluation

TSK-000628 · Action
Manufacturing Scheduling and MOM/MES Evaluation

TSK-000630 · Action
Manufacturing Scheduling and MOM/MES Evaluation

TSK-000632 · Action
Manufacturing Scheduling and MOM/MES Evaluation

TSK-000634 · Control requirements
Manufacturing Scheduling and MOM/MES Evaluation

TSK-000635 · Control requirements
Manufacturing Scheduling and MOM/MES Evaluation

TSK-000636 · Control requirements
Manufacturing Scheduling and MOM/MES Evaluation

TSK-000637 · Control requirements
Manufacturing Scheduling and MOM/MES Evaluation

TSK-000638 · Control requirements
Manufacturing Scheduling and MOM/MES Evaluation

TSK-000639 · Control requirements
Manufacturing Scheduling and MOM/MES Evaluation

TSK-000640 · Control requirements
Manufacturing Scheduling and MOM/MES Evaluation

TSK-000641 · Control requirements
Manufacturing Scheduling and MOM/MES Evaluation

TSK-000642 · Control requirements
Manufacturing Scheduling and MOM/MES Evaluation

TSK-000643 · Control requirements
Manufacturing Scheduling and MOM/MES Evaluation

TSK-000943 · Technical scope
Manufacturing Scheduling and MOM/MES Evaluation

TSK-000944 · Action
Manufacturing Scheduling and MOM/MES Evaluation

TSK-000945 · Action
Manufacturing Scheduling and MOM/MES Evaluation

TSK-001070 · Scheduling control
Manufacturing Scheduling and MOM/MES Evaluation
Workstream Portfolio Rollup
4,942,000 USD
OT Network and Controls Transformation
Recorded workstream portfolio reference. This is the workstream-level value and is not a project expenditure or a new total of reassigned projects.
| Measure or outcome | Value or result | Meaning and operating scope |
|---|---|---|
| Part Variations | 78 variations | Scope or Inventory Quantity Operating scope Applies to: Manufacturing Scheduling and MOM/MES Evaluation MOM/MES scheduling environment — Recorded operating environment. |
| Manufacturing Processes | 20 processes | Scope or Inventory Quantity Operating scope Applies to: Manufacturing Scheduling and MOM/MES Evaluation MOM/MES scheduling environment — Recorded operating environment. |
| Customer Types | 3 types | Scope or Inventory Quantity Operating scope Applies to: Manufacturing Scheduling and MOM/MES Evaluation MOM/MES scheduling environment — Recorded operating environment. |
| Suppliers Researched | > 40 suppliers | Scope or Inventory Quantity Vendor research scope Applies to: Manufacturing Scheduling and MOM/MES Evaluation MOM/MES solution research — More than 40 suppliers were researched. |
| Suppliers Contacted | > 15 suppliers | Scope or Inventory Quantity Vendor research scope Applies to: Manufacturing Scheduling and MOM/MES Evaluation MOM/MES solution research — More than 15 suppliers were contacted. |
| Turnaround Duration | 4 to 8 weeks | Baseline Recorded operating interval Applies to: Manufacturing Scheduling and MOM/MES Evaluation MOM/MES scheduling environment — Four-to-eight-week turnaround in the source operating environment. |
| Recorded outcome | Supported an operating environment with 78 part variations, 20 processes and three customer types. | Manufacturing Scheduling and MOM/MES Evaluation |
| Recorded outcome | Researched more than 40 suppliers and contacted more than 15 during the selection effort. | Manufacturing Scheduling and MOM/MES Evaluation |
CASE-142 · Engineering case
Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
Read the Case ↗PRJ-B-005-SE-F1-001
FEL 1 / Concept · Business and decision documents · 2012-06-06 · PRJ-B-005-WBS-F1-01 · PRJ-B-005-BL-F1-B01
Establish the controlled business case and opportunity statement needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-F1-002
FEL 1 / Concept · Business and decision documents · 2012-06-13 · PRJ-B-005-WBS-F1-02 · PRJ-B-005-BL-F1-B01
Establish the controlled project charter and initial scope / battery limits needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-F1-003
FEL 1 / Concept · Reports · 2012-06-20 · PRJ-B-005-WBS-F1-03 · PRJ-B-005-BL-F1-B01
Establish the controlled stakeholder needs and operating context needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-F1-004
FEL 1 / Concept · Studies and analyses · 2012-06-27 · PRJ-B-005-WBS-F1-04 · PRJ-B-005-BL-F1-B01
Establish the controlled concept alternatives and screening study needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-F1-005
FEL 1 / Concept · Studies and analyses · 2012-07-04 · PRJ-B-005-WBS-F1-01 · PRJ-B-005-BL-F1-B01
Establish the controlled preliminary schedule and class 5 cost estimate needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-F1-006
FEL 1 / Concept · Registers and indexes · 2012-07-11 · PRJ-B-005-WBS-F1-02 · PRJ-B-005-BL-F1-B01
Establish the controlled initial risk, assumption, and decision register needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-F2-001
FEL 2 / Select · Studies and analyses · 2012-07-18 · PRJ-B-005-WBS-F2-01 · PRJ-B-005-BL-F2-B01
Establish the controlled option study and weighted decision analysis needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-F2-002
FEL 2 / Select · Design definitions · 2012-07-25 · PRJ-B-005-WBS-F2-02 · PRJ-B-005-BL-F2-B01
Establish the controlled design basis memorandum needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-F2-003
FEL 2 / Select · Studies and analyses · 2012-08-01 · PRJ-B-005-WBS-F2-03 · PRJ-B-005-BL-F2-B01
Establish the controlled site, layout, and process alternative study needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-F2-004
FEL 2 / Select · Specifications · 2012-08-09 · PRJ-B-005-WBS-F2-04 · PRJ-B-005-BL-F2-B01
Establish the controlled stakeholder and system requirements specification needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-F2-005
FEL 2 / Select · Design definitions · 2012-08-16 · PRJ-B-005-WBS-F2-01 · PRJ-B-005-BL-F2-B01
Establish the controlled concept architecture and interface definition needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-F2-006
FEL 2 / Select · Studies and analyses · 2012-08-23 · PRJ-B-005-WBS-F2-02 · PRJ-B-005-BL-F2-B01
Establish the controlled hazid / constructability / operability study needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-F2-007
FEL 2 / Select · Studies and analyses · 2012-08-30 · PRJ-B-005-WBS-F2-03 · PRJ-B-005-BL-F2-B01
Establish the controlled class 4 estimate and level 2 schedule needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-F2-008
FEL 2 / Select · Dossiers and manual sets · 2012-09-07 · PRJ-B-005-WBS-F2-04 · PRJ-B-005-BL-F2-B01
Establish the controlled selected concept and g2 decision dossier needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-F3-001
FEL 3 / Define · Registers and indexes · 2012-09-14 · PRJ-B-005-WBS-F3-01 · PRJ-B-005-BL-F3-B01
Establish the controlled defined scope and design deliverables register needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-F3-002
FEL 3 / Define · Specifications · 2012-09-22 · PRJ-B-005-WBS-F3-02 · PRJ-B-005-BL-F3-B01
Establish the controlled baselined system requirements specification needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-F3-003
FEL 3 / Define · Design definitions · 2012-09-29 · PRJ-B-005-WBS-F3-03 · PRJ-B-005-BL-F3-B01
Establish the controlled system architecture and interface control document needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-F3-004
FEL 3 / Define · Plans · 2012-10-07 · PRJ-B-005-WBS-F3-04 · PRJ-B-005-BL-F3-B01
Establish the controlled project execution plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-F3-005
FEL 3 / Define · Baselines and manifests · 2012-10-14 · PRJ-B-005-WBS-F3-01 · PRJ-B-005-BL-F3-B01
Establish the controlled wbs, work package, and responsibility baseline needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-F3-006
FEL 3 / Define · Baselines and manifests · 2012-10-22 · PRJ-B-005-WBS-F3-02 · PRJ-B-005-BL-F3-B01
Establish the controlled class 3 estimate and cost baseline needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-F3-007
FEL 3 / Define · Plans · 2012-10-29 · PRJ-B-005-WBS-F3-03 · PRJ-B-005-BL-F3-B01
Establish the controlled coordinated control schedule and resource plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-F3-008
FEL 3 / Define · Plans · 2012-11-06 · PRJ-B-005-WBS-F3-04 · PRJ-B-005-BL-F3-B01
Establish the controlled procurement and contracting plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-F3-009
FEL 3 / Define · Plans · 2012-11-13 · PRJ-B-005-WBS-F3-01 · PRJ-B-005-BL-F3-B01
Establish the controlled v&v, acceptance, commissioning, and turnover strategy needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-F3-010
FEL 3 / Define · Certificates and approvals · 2012-11-21 · PRJ-B-005-WBS-F3-02 · PRJ-B-005-BL-F3-B01
Establish the controlled fid / g3 approval and baseline manifest needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-DD-001
Detailed Design · Plans · 2012-11-28 · PRJ-B-005-WBS-DD-01 · PRJ-B-005-BL-DD-B01
Establish the controlled detailed design management plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-DD-002
Detailed Design · Design definitions · 2012-12-06 · PRJ-B-005-WBS-DD-02 · PRJ-B-005-BL-DD-B01
Establish the controlled process / functional design package needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-DD-003
Detailed Design · Design definitions · 2012-12-13 · PRJ-B-005-WBS-DD-03 · PRJ-B-005-BL-DD-B01
Establish the controlled mechanical and piping design package needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-DD-004
Detailed Design · Design definitions · 2012-12-21 · PRJ-B-005-WBS-DD-04 · PRJ-B-005-BL-DD-B01
Establish the controlled electrical power and controls design package needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-DD-005
Detailed Design · Design definitions · 2012-12-28 · PRJ-B-005-WBS-DD-01 · PRJ-B-005-BL-DD-B01
Establish the controlled civil, structural, and architectural design package needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-DD-006
Detailed Design · Design definitions · 2013-01-05 · PRJ-B-005-WBS-DD-02 · PRJ-B-005-BL-DD-B01
Establish the controlled instrumentation, automation, and data design package needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-DD-007
Detailed Design · Studies and analyses · 2013-01-12 · PRJ-B-005-WBS-DD-03 · PRJ-B-005-BL-DD-B01
Establish the controlled safety, reliability, and maintainability analysis needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-DD-008
Detailed Design · Records and logs · 2013-01-20 · PRJ-B-005-WBS-DD-04 · PRJ-B-005-BL-DD-B01
Establish the controlled design review and comment resolution record needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-DD-009
Detailed Design · Baselines and manifests · 2013-01-27 · PRJ-B-005-WBS-DD-01 · PRJ-B-005-BL-DD-B01
Establish the controlled issued-for-construction design baseline needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-DD-010
Detailed Design · Registers and indexes · 2013-02-04 · PRJ-B-005-WBS-DD-02 · PRJ-B-005-BL-DD-B01
Establish the controlled design v&v evidence index needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-PR-001
Procurement · Registers and indexes · 2013-02-11 · PRJ-B-005-WBS-PR-01 · PRJ-B-005-BL-PR-B01
Establish the controlled procurement package and bid list needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-PR-002
Procurement · Specifications · 2013-02-19 · PRJ-B-005-WBS-PR-02 · PRJ-B-005-BL-PR-B01
Establish the controlled technical requisition and datasheet set needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-PR-003
Procurement · Studies and analyses · 2013-02-27 · PRJ-B-005-WBS-PR-03 · PRJ-B-005-BL-PR-B01
Establish the controlled commercial bid evaluation and award recommendation needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-PR-004
Procurement · Registers and indexes · 2013-03-06 · PRJ-B-005-WBS-PR-04 · PRJ-B-005-BL-PR-B01
Establish the controlled technical bid evaluation and clarification log needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-PR-005
Procurement · Business and decision documents · 2013-03-14 · PRJ-B-005-WBS-PR-01 · PRJ-B-005-BL-PR-B01
Establish the controlled purchase order / contract and scope of supply needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-PR-006
Procurement · Plans · 2013-03-22 · PRJ-B-005-WBS-PR-02 · PRJ-B-005-BL-PR-B01
Establish the controlled supplier quality and inspection plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-PR-007
Procurement · Registers and indexes · 2013-03-29 · PRJ-B-005-WBS-PR-03 · PRJ-B-005-BL-PR-B01
Establish the controlled vendor data, submittal, and rfi register needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-PR-008
Procurement · Plans · 2013-04-06 · PRJ-B-005-WBS-PR-04 · PRJ-B-005-BL-PR-B01
Establish the controlled expediting and logistics plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-PR-009
Procurement · Procedures · 2013-04-14 · PRJ-B-005-WBS-PR-01 · PRJ-B-005-BL-PR-B01
Establish the controlled factory acceptance test procedure and report needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-FC-001
Fabrication / Construction · Plans · 2013-04-25 · PRJ-B-005-WBS-FC-01 · PRJ-B-005-BL-FC-B01
Establish the controlled construction / fabrication execution plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-FC-002
Fabrication / Construction · Plans · 2013-05-07 · PRJ-B-005-WBS-FC-02 · PRJ-B-005-BL-FC-B01
Establish the controlled site logistics, safety, and permit plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-FC-003
Fabrication / Construction · Design definitions · 2013-05-18 · PRJ-B-005-WBS-FC-03 · PRJ-B-005-BL-FC-B01
Establish the controlled fabrication drawing and shop package needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-FC-004
Fabrication / Construction · Procedures · 2013-05-30 · PRJ-B-005-WBS-FC-04 · PRJ-B-005-BL-FC-B01
Establish the controlled field work package and installation method needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-FC-005
Fabrication / Construction · Plans · 2013-06-10 · PRJ-B-005-WBS-FC-01 · PRJ-B-005-BL-FC-B01
Establish the controlled inspection and test plan / quality records needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-FC-006
Fabrication / Construction · Records and logs · 2013-06-22 · PRJ-B-005-WBS-FC-02 · PRJ-B-005-BL-FC-B01
Establish the controlled daily progress and quantity report needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-FC-007
Fabrication / Construction · Records and logs · 2013-07-03 · PRJ-B-005-WBS-FC-03 · PRJ-B-005-BL-FC-B01
Establish the controlled nonconformity and corrective action record needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-FC-008
Fabrication / Construction · Registers and indexes · 2013-07-15 · PRJ-B-005-WBS-FC-04 · PRJ-B-005-BL-FC-B01
Establish the controlled redline drawing and field change register needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-FC-009
Fabrication / Construction · Certificates and approvals · 2013-07-27 · PRJ-B-005-WBS-FC-01 · PRJ-B-005-BL-FC-B01
Establish the controlled mechanical completion certificate and punch list needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-IN-001
Installation and Interface Coordination · Plans · 2013-08-03 · PRJ-B-005-WBS-IN-01 · PRJ-B-005-BL-IN-B01
Establish the controlled system coordination and interface plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-IN-002
Installation and Interface Coordination · Records and logs · 2013-08-10 · PRJ-B-005-WBS-IN-02 · PRJ-B-005-BL-IN-B01
Establish the controlled installation completion and walkdown record needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-IN-003
Installation and Interface Coordination · Baselines and manifests · 2013-08-18 · PRJ-B-005-WBS-IN-03 · PRJ-B-005-BL-IN-B01
Establish the controlled controls / software configuration baseline needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-IN-004
Installation and Interface Coordination · Records and logs · 2013-08-25 · PRJ-B-005-WBS-IN-04 · PRJ-B-005-BL-IN-B01
Establish the controlled loop check, continuity, and calibration records needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-IN-005
Installation and Interface Coordination · Procedures · 2013-09-02 · PRJ-B-005-WBS-IN-01 · PRJ-B-005-BL-IN-B01
Establish the controlled cleaning, flushing, and pre-operational test record needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-IN-006
Installation and Interface Coordination · Dossiers and manual sets · 2013-09-09 · PRJ-B-005-WBS-IN-02 · PRJ-B-005-BL-IN-B01
Establish the controlled system completion dossier needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-IN-007
Installation and Interface Coordination · Certificates and approvals · 2013-09-17 · PRJ-B-005-WBS-IN-03 · PRJ-B-005-BL-IN-B01
Establish the controlled ready-for-commissioning certificate needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-CS-001
Commissioning / Startup · Plans · 2013-09-24 · PRJ-B-005-WBS-CS-01 · PRJ-B-005-BL-CS-B01
Establish the controlled commissioning and startup plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-CS-002
Commissioning / Startup · Reports · 2013-10-01 · PRJ-B-005-WBS-CS-02 · PRJ-B-005-BL-CS-B01
Establish the controlled pre-startup safety / operational readiness review needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-CS-003
Commissioning / Startup · Procedures · 2013-10-08 · PRJ-B-005-WBS-CS-03 · PRJ-B-005-BL-CS-B01
Establish the controlled commissioning procedure and results needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-CS-004
Commissioning / Startup · Registers and indexes · 2013-10-15 · PRJ-B-005-WBS-CS-04 · PRJ-B-005-BL-CS-B01
Establish the controlled startup and ramp-up log needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-CS-005
Commissioning / Startup · Studies and analyses · 2013-10-22 · PRJ-B-005-WBS-CS-01 · PRJ-B-005-BL-CS-B01
Establish the controlled performance guarantee and capacity test report needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-CS-006
Commissioning / Startup · Studies and analyses · 2013-10-29 · PRJ-B-005-WBS-CS-02 · PRJ-B-005-BL-CS-B01
Establish the controlled reliability demonstration run report needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-CS-007
Commissioning / Startup · Records and logs · 2013-11-05 · PRJ-B-005-WBS-CS-03 · PRJ-B-005-BL-CS-B01
Establish the controlled operator and maintainer training record needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-CS-008
Commissioning / Startup · Registers and indexes · 2013-11-12 · PRJ-B-005-WBS-CS-04 · PRJ-B-005-BL-CS-B01
Establish the controlled commissioning anomaly and punch closure register needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-CS-009
Commissioning / Startup · Certificates and approvals · 2013-11-20 · PRJ-B-005-WBS-CS-01 · PRJ-B-005-BL-CS-B01
Establish the controlled performance acceptance certificate needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-OT-001
Operational Turnover / Closeout · Baselines and manifests · 2013-11-25 · PRJ-B-005-WBS-OT-01 · PRJ-B-005-BL-OT-B01
Establish the controlled as-built / as-configured baseline manifest needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-OT-002
Operational Turnover / Closeout · Dossiers and manual sets · 2013-11-30 · PRJ-B-005-WBS-OT-02 · PRJ-B-005-BL-OT-B01
Establish the controlled operations and maintenance manual set needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-OT-003
Operational Turnover / Closeout · Registers and indexes · 2013-12-05 · PRJ-B-005-WBS-OT-03 · PRJ-B-005-BL-OT-B01
Establish the controlled asset, spare parts, and warranty register needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-OT-004
Operational Turnover / Closeout · Certificates and approvals · 2013-12-10 · PRJ-B-005-WBS-OT-04 · PRJ-B-005-BL-OT-B01
Establish the controlled final technical and commercial acceptance certificate needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-OT-005
Operational Turnover / Closeout · Dossiers and manual sets · 2013-12-15 · PRJ-B-005-WBS-OT-01 · PRJ-B-005-BL-OT-B01
Establish the controlled operational turnover dossier and ownership transfer needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-OT-006
Operational Turnover / Closeout · Studies and analyses · 2013-12-20 · PRJ-B-005-WBS-OT-02 · PRJ-B-005-BL-OT-B01
Establish the controlled final cost, schedule, contract, and claims closeout needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-OT-007
Operational Turnover / Closeout · Registers and indexes · 2013-12-25 · PRJ-B-005-WBS-OT-03 · PRJ-B-005-BL-OT-B01
Establish the controlled controlled records archive and retrieval index needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.
PRJ-B-005-SE-OT-008
Operational Turnover / Closeout · Baselines and manifests · 2013-12-31 · PRJ-B-005-WBS-OT-04 · PRJ-B-005-BL-OT-B01
Establish the controlled lessons learned and benefit realization baseline needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.