PRJ-B-005 · Food ingredients manufacturer

Manufacturing Scheduling and MOM/MES Evaluation

Owned the full project lifecycle, connecting capital planning, engineering, procurement, construction and operating readiness.

Conceptual engineering visualization: Manufacturing Scheduling and MOM/MES Evaluation
Conceptual engineering visualization · AI generated

The Operating Context

Operating Context

Led manufacturing-scheduling and MOM/MES evaluation for 78 part variations, 20 processes, and three customer types, covering requirements, supplier evaluation, pilot deployment, user acceptance, training, cutover, and support ownership.

Purpose & Engineering Scope

Purpose and Scope

Business Purpose

Manufacturing systems and scheduling support for operational readiness, cutover, training, and support ownership.

Technical Scope

Manufacturing scheduling and MOM/MES solution covering voice-of-customer and operating requirements, process and data interfaces, COTS and vendor evaluation, configuration, scheduling visibility, user acceptance, cutover, training and support ownership.

The Work & Its Outcomes

Work and Outcomes

Engineering Approach

  • Voice of customer, process mapping, requirements and data architecture.
  • Vendor research, configuration, interfaces and pilot deployment.
  • User acceptance, training, controlled cutover and support transfer.

Results, Targets & Design Context

  • Supported an operating environment with 78 part variations, 20 processes and three customer types.
  • Researched more than 40 suppliers and contacted more than 15 during the selection effort.

Project Delivery & Execution

Capital Planning and Full Lifecycle Ownership

Owned the full project lifecycle, from capital planning through engineering, procurement, construction, commissioning and operating readiness.
Full lifecycle ownership
  • Project Ownership

    Full lifecycle project ownership

    Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.

Connected Activities

Design and Multidisciplinary Coordination

Connected Activities

Construction Sequencing and Field Oversight

AFE Development, Procurement and Bid Evaluation

Connected Activities

Project Controls and Governance

Quality, Commissioning and Operating Readiness

Delivery Improvement and Quantitative Controls

Recorded delivery responsibilities and activities

Owned capital planning and the full delivery lifecycle. The cards connect the applicable responsibilities with the recorded work.

Delivery Activities

Analytical Methods & Quantitative Decision Support

Financial and Capital Investment Analysis

Statistical Quality and Process Analytics

Optimization and Operations Research

Connected Activities

Supply Chain and Inventory Analysis

Connected Activities

Uncertainty, Reliability and Queueing

Connected Activities

Experimental Design and Model Validation

Production-Rate Driver Analysis

Work Measurement and Methods Engineering

Quality Engineering and Structured Improvement

Engineering Option Studies and Operating Models

KPI Ownership and Performance Interpretation

Analytical Capability and Practical Application

Connected Activities

Related methods and applications

Technical Systems Ownership

Industrial Automation, Controls and OT Networks

Additional technical detail
Explore 6 detail records
  • Competency and project record

    MES/MOM/COTS evaluation, requirements engineering, vendor research, scheduling visibility, enterprise software supplier/spreadsheet framing, and weighted requirements.

  • Competency and project record

    Manufacturing scheduling and MOM/MES solution from VOC and requirements through vendor selection, configuration, UAT, cutover, training, and support ownership; Budget: $2,600,000. Operational scheduling and manufacturing-visibility solution; transferred and closed.

  • Competency and project record

    Delivered digital-manufacturing scope included VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support ownership. The operating environment included 78 part variations, 20 processes, three customer types, more than 40 suppliers researched, more than 15 contacted, and a four-to-eight-week turnaround; MOM/MES scheduling solution; 78 part variations; 20 processes; 3 customer types; operational turnover completed

  • Competency and project record

    MOM/MES and scheduling-system evaluation, requirements engineering, VOC capture, COTS research, weighted decision matrices, enterprise software supplier/data framing, and industrial scheduling decision support; Use as industrial engineering, manufacturing systems, scheduling, and decision-support evidence.

  • Competency and project record

    Requirements, vendor evaluation, configuration, interfaces, UAT, cutover, training and support handoff; Supported 78 part variations, 20 processes and three customer types

  • Sanitary and aseptic: Project mapping

    PRJ-B-005 | Manufacturing Scheduling and MOM/MES Evaluation | classification ASEPTIC_OR_HYGIENIC_PRODUCT_PROCESSING

Project Activities

Project Measures

Workstream Portfolio Rollup

4,942,000 USD

OT Network and Controls Transformation

Recorded workstream portfolio reference. This is the workstream-level value and is not a project expenditure or a new total of reassigned projects.

Measure or outcomeValue or resultMeaning and operating scope
Part Variations78 variationsScope or Inventory Quantity
Operating scope

Applies to: Manufacturing Scheduling and MOM/MES Evaluation

MOM/MES scheduling environment — Recorded operating environment.

Manufacturing Processes20 processesScope or Inventory Quantity
Operating scope

Applies to: Manufacturing Scheduling and MOM/MES Evaluation

MOM/MES scheduling environment — Recorded operating environment.

Customer Types3 typesScope or Inventory Quantity
Operating scope

Applies to: Manufacturing Scheduling and MOM/MES Evaluation

MOM/MES scheduling environment — Recorded operating environment.

Suppliers Researched> 40 suppliersScope or Inventory Quantity
Vendor research scope

Applies to: Manufacturing Scheduling and MOM/MES Evaluation

MOM/MES solution research — More than 40 suppliers were researched.

Suppliers Contacted> 15 suppliersScope or Inventory Quantity
Vendor research scope

Applies to: Manufacturing Scheduling and MOM/MES Evaluation

MOM/MES solution research — More than 15 suppliers were contacted.

Turnaround Duration4 to 8 weeksBaseline
Recorded operating interval

Applies to: Manufacturing Scheduling and MOM/MES Evaluation

MOM/MES scheduling environment — Four-to-eight-week turnaround in the source operating environment.

Recorded outcomeSupported an operating environment with 78 part variations, 20 processes and three customer types.Manufacturing Scheduling and MOM/MES Evaluation
Recorded outcomeResearched more than 40 suppliers and contacted more than 15 during the selection effort.Manufacturing Scheduling and MOM/MES Evaluation

Explore the Case Studies

Portfolio Artifact Index

Project lifecycle documents
Explore 76 document purposes and project phases
  • PRJ-B-005-SE-F1-001

    Business Case and Opportunity Statement

    FEL 1 / Concept · Business and decision documents · 2012-06-06 · PRJ-B-005-WBS-F1-01 · PRJ-B-005-BL-F1-B01

    Establish the controlled business case and opportunity statement needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F1-002

    Project Charter and Initial Scope / Battery Limits

    FEL 1 / Concept · Business and decision documents · 2012-06-13 · PRJ-B-005-WBS-F1-02 · PRJ-B-005-BL-F1-B01

    Establish the controlled project charter and initial scope / battery limits needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F1-003

    Stakeholder Needs and Operating Context

    FEL 1 / Concept · Reports · 2012-06-20 · PRJ-B-005-WBS-F1-03 · PRJ-B-005-BL-F1-B01

    Establish the controlled stakeholder needs and operating context needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F1-004

    Concept Alternatives and Screening Study

    FEL 1 / Concept · Studies and analyses · 2012-06-27 · PRJ-B-005-WBS-F1-04 · PRJ-B-005-BL-F1-B01

    Establish the controlled concept alternatives and screening study needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F1-005

    Preliminary Schedule and Class 5 Cost Estimate

    FEL 1 / Concept · Studies and analyses · 2012-07-04 · PRJ-B-005-WBS-F1-01 · PRJ-B-005-BL-F1-B01

    Establish the controlled preliminary schedule and class 5 cost estimate needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F1-006

    Initial Risk, Assumption, and Decision Register

    FEL 1 / Concept · Registers and indexes · 2012-07-11 · PRJ-B-005-WBS-F1-02 · PRJ-B-005-BL-F1-B01

    Establish the controlled initial risk, assumption, and decision register needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F2-001

    Option Study and Weighted Decision Analysis

    FEL 2 / Select · Studies and analyses · 2012-07-18 · PRJ-B-005-WBS-F2-01 · PRJ-B-005-BL-F2-B01

    Establish the controlled option study and weighted decision analysis needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F2-002

    Design Basis Memorandum

    FEL 2 / Select · Design definitions · 2012-07-25 · PRJ-B-005-WBS-F2-02 · PRJ-B-005-BL-F2-B01

    Establish the controlled design basis memorandum needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F2-003

    Site, Layout, and Process Alternative Study

    FEL 2 / Select · Studies and analyses · 2012-08-01 · PRJ-B-005-WBS-F2-03 · PRJ-B-005-BL-F2-B01

    Establish the controlled site, layout, and process alternative study needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F2-004

    Stakeholder and System Requirements Specification

    FEL 2 / Select · Specifications · 2012-08-09 · PRJ-B-005-WBS-F2-04 · PRJ-B-005-BL-F2-B01

    Establish the controlled stakeholder and system requirements specification needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F2-005

    Concept Architecture and Interface Definition

    FEL 2 / Select · Design definitions · 2012-08-16 · PRJ-B-005-WBS-F2-01 · PRJ-B-005-BL-F2-B01

    Establish the controlled concept architecture and interface definition needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F2-006

    HAZID / Constructability / Operability Study

    FEL 2 / Select · Studies and analyses · 2012-08-23 · PRJ-B-005-WBS-F2-02 · PRJ-B-005-BL-F2-B01

    Establish the controlled hazid / constructability / operability study needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F2-007

    Class 4 Estimate and Level 2 Schedule

    FEL 2 / Select · Studies and analyses · 2012-08-30 · PRJ-B-005-WBS-F2-03 · PRJ-B-005-BL-F2-B01

    Establish the controlled class 4 estimate and level 2 schedule needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F2-008

    Selected Concept and G2 Decision Dossier

    FEL 2 / Select · Dossiers and manual sets · 2012-09-07 · PRJ-B-005-WBS-F2-04 · PRJ-B-005-BL-F2-B01

    Establish the controlled selected concept and g2 decision dossier needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F3-001

    Defined Scope and Design Deliverables Register

    FEL 3 / Define · Registers and indexes · 2012-09-14 · PRJ-B-005-WBS-F3-01 · PRJ-B-005-BL-F3-B01

    Establish the controlled defined scope and design deliverables register needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F3-002

    Baselined System Requirements Specification

    FEL 3 / Define · Specifications · 2012-09-22 · PRJ-B-005-WBS-F3-02 · PRJ-B-005-BL-F3-B01

    Establish the controlled baselined system requirements specification needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F3-003

    System Architecture and Interface Control Document

    FEL 3 / Define · Design definitions · 2012-09-29 · PRJ-B-005-WBS-F3-03 · PRJ-B-005-BL-F3-B01

    Establish the controlled system architecture and interface control document needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F3-004

    Project Execution Plan

    FEL 3 / Define · Plans · 2012-10-07 · PRJ-B-005-WBS-F3-04 · PRJ-B-005-BL-F3-B01

    Establish the controlled project execution plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F3-005

    WBS, Work Package, and Responsibility Baseline

    FEL 3 / Define · Baselines and manifests · 2012-10-14 · PRJ-B-005-WBS-F3-01 · PRJ-B-005-BL-F3-B01

    Establish the controlled wbs, work package, and responsibility baseline needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F3-006

    Class 3 Estimate and Cost Baseline

    FEL 3 / Define · Baselines and manifests · 2012-10-22 · PRJ-B-005-WBS-F3-02 · PRJ-B-005-BL-F3-B01

    Establish the controlled class 3 estimate and cost baseline needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F3-007

    Coordinated Control Schedule and Resource Plan

    FEL 3 / Define · Plans · 2012-10-29 · PRJ-B-005-WBS-F3-03 · PRJ-B-005-BL-F3-B01

    Establish the controlled coordinated control schedule and resource plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F3-008

    Procurement and Contracting Plan

    FEL 3 / Define · Plans · 2012-11-06 · PRJ-B-005-WBS-F3-04 · PRJ-B-005-BL-F3-B01

    Establish the controlled procurement and contracting plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F3-009

    V&V, Acceptance, Commissioning, and Turnover Strategy

    FEL 3 / Define · Plans · 2012-11-13 · PRJ-B-005-WBS-F3-01 · PRJ-B-005-BL-F3-B01

    Establish the controlled v&v, acceptance, commissioning, and turnover strategy needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F3-010

    FID / G3 Approval and Baseline Manifest

    FEL 3 / Define · Certificates and approvals · 2012-11-21 · PRJ-B-005-WBS-F3-02 · PRJ-B-005-BL-F3-B01

    Establish the controlled fid / g3 approval and baseline manifest needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-DD-001

    Detailed Design Management Plan

    Detailed Design · Plans · 2012-11-28 · PRJ-B-005-WBS-DD-01 · PRJ-B-005-BL-DD-B01

    Establish the controlled detailed design management plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-DD-002

    Process / Functional Design Package

    Detailed Design · Design definitions · 2012-12-06 · PRJ-B-005-WBS-DD-02 · PRJ-B-005-BL-DD-B01

    Establish the controlled process / functional design package needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-DD-003

    Mechanical and Piping Design Package

    Detailed Design · Design definitions · 2012-12-13 · PRJ-B-005-WBS-DD-03 · PRJ-B-005-BL-DD-B01

    Establish the controlled mechanical and piping design package needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-DD-004

    Electrical Power and Controls Design Package

    Detailed Design · Design definitions · 2012-12-21 · PRJ-B-005-WBS-DD-04 · PRJ-B-005-BL-DD-B01

    Establish the controlled electrical power and controls design package needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-DD-005

    Civil, Structural, and Architectural Design Package

    Detailed Design · Design definitions · 2012-12-28 · PRJ-B-005-WBS-DD-01 · PRJ-B-005-BL-DD-B01

    Establish the controlled civil, structural, and architectural design package needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-DD-006

    Instrumentation, Automation, and Data Design Package

    Detailed Design · Design definitions · 2013-01-05 · PRJ-B-005-WBS-DD-02 · PRJ-B-005-BL-DD-B01

    Establish the controlled instrumentation, automation, and data design package needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-DD-007

    Safety, Reliability, and Maintainability Analysis

    Detailed Design · Studies and analyses · 2013-01-12 · PRJ-B-005-WBS-DD-03 · PRJ-B-005-BL-DD-B01

    Establish the controlled safety, reliability, and maintainability analysis needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-DD-008

    Design Review and Comment Resolution Record

    Detailed Design · Records and logs · 2013-01-20 · PRJ-B-005-WBS-DD-04 · PRJ-B-005-BL-DD-B01

    Establish the controlled design review and comment resolution record needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-DD-009

    Issued-for-Construction Design Baseline

    Detailed Design · Baselines and manifests · 2013-01-27 · PRJ-B-005-WBS-DD-01 · PRJ-B-005-BL-DD-B01

    Establish the controlled issued-for-construction design baseline needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-DD-010

    Design V&V Evidence Index

    Detailed Design · Registers and indexes · 2013-02-04 · PRJ-B-005-WBS-DD-02 · PRJ-B-005-BL-DD-B01

    Establish the controlled design v&v evidence index needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-PR-001

    Procurement Package and Bid List

    Procurement · Registers and indexes · 2013-02-11 · PRJ-B-005-WBS-PR-01 · PRJ-B-005-BL-PR-B01

    Establish the controlled procurement package and bid list needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-PR-002

    Technical Requisition and Datasheet Set

    Procurement · Specifications · 2013-02-19 · PRJ-B-005-WBS-PR-02 · PRJ-B-005-BL-PR-B01

    Establish the controlled technical requisition and datasheet set needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-PR-003

    Commercial Bid Evaluation and Award Recommendation

    Procurement · Studies and analyses · 2013-02-27 · PRJ-B-005-WBS-PR-03 · PRJ-B-005-BL-PR-B01

    Establish the controlled commercial bid evaluation and award recommendation needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-PR-004

    Technical Bid Evaluation and Clarification Log

    Procurement · Registers and indexes · 2013-03-06 · PRJ-B-005-WBS-PR-04 · PRJ-B-005-BL-PR-B01

    Establish the controlled technical bid evaluation and clarification log needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-PR-005

    Purchase Order / Contract and Scope of Supply

    Procurement · Business and decision documents · 2013-03-14 · PRJ-B-005-WBS-PR-01 · PRJ-B-005-BL-PR-B01

    Establish the controlled purchase order / contract and scope of supply needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-PR-006

    Supplier Quality and Inspection Plan

    Procurement · Plans · 2013-03-22 · PRJ-B-005-WBS-PR-02 · PRJ-B-005-BL-PR-B01

    Establish the controlled supplier quality and inspection plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-PR-007

    Vendor Data, Submittal, and RFI Register

    Procurement · Registers and indexes · 2013-03-29 · PRJ-B-005-WBS-PR-03 · PRJ-B-005-BL-PR-B01

    Establish the controlled vendor data, submittal, and rfi register needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-PR-008

    Expediting and Logistics Plan

    Procurement · Plans · 2013-04-06 · PRJ-B-005-WBS-PR-04 · PRJ-B-005-BL-PR-B01

    Establish the controlled expediting and logistics plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-PR-009

    Factory Acceptance Test Procedure and Report

    Procurement · Procedures · 2013-04-14 · PRJ-B-005-WBS-PR-01 · PRJ-B-005-BL-PR-B01

    Establish the controlled factory acceptance test procedure and report needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-FC-001

    Construction / Fabrication Execution Plan

    Fabrication / Construction · Plans · 2013-04-25 · PRJ-B-005-WBS-FC-01 · PRJ-B-005-BL-FC-B01

    Establish the controlled construction / fabrication execution plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-FC-002

    Site Logistics, Safety, and Permit Plan

    Fabrication / Construction · Plans · 2013-05-07 · PRJ-B-005-WBS-FC-02 · PRJ-B-005-BL-FC-B01

    Establish the controlled site logistics, safety, and permit plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-FC-003

    Fabrication Drawing and Shop Package

    Fabrication / Construction · Design definitions · 2013-05-18 · PRJ-B-005-WBS-FC-03 · PRJ-B-005-BL-FC-B01

    Establish the controlled fabrication drawing and shop package needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-FC-004

    Field Work Package and Installation Method

    Fabrication / Construction · Procedures · 2013-05-30 · PRJ-B-005-WBS-FC-04 · PRJ-B-005-BL-FC-B01

    Establish the controlled field work package and installation method needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-FC-005

    Inspection and Test Plan / Quality Records

    Fabrication / Construction · Plans · 2013-06-10 · PRJ-B-005-WBS-FC-01 · PRJ-B-005-BL-FC-B01

    Establish the controlled inspection and test plan / quality records needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-FC-006

    Daily Progress and Quantity Report

    Fabrication / Construction · Records and logs · 2013-06-22 · PRJ-B-005-WBS-FC-02 · PRJ-B-005-BL-FC-B01

    Establish the controlled daily progress and quantity report needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-FC-007

    Nonconformity and Corrective Action Record

    Fabrication / Construction · Records and logs · 2013-07-03 · PRJ-B-005-WBS-FC-03 · PRJ-B-005-BL-FC-B01

    Establish the controlled nonconformity and corrective action record needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-FC-008

    Redline Drawing and Field Change Register

    Fabrication / Construction · Registers and indexes · 2013-07-15 · PRJ-B-005-WBS-FC-04 · PRJ-B-005-BL-FC-B01

    Establish the controlled redline drawing and field change register needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-FC-009

    Mechanical Completion Certificate and Punch List

    Fabrication / Construction · Certificates and approvals · 2013-07-27 · PRJ-B-005-WBS-FC-01 · PRJ-B-005-BL-FC-B01

    Establish the controlled mechanical completion certificate and punch list needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-IN-001

    System Coordination and Interface Plan

    Installation and Interface Coordination · Plans · 2013-08-03 · PRJ-B-005-WBS-IN-01 · PRJ-B-005-BL-IN-B01

    Establish the controlled system coordination and interface plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-IN-002

    Installation Completion and Walkdown Record

    Installation and Interface Coordination · Records and logs · 2013-08-10 · PRJ-B-005-WBS-IN-02 · PRJ-B-005-BL-IN-B01

    Establish the controlled installation completion and walkdown record needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-IN-003

    Controls / Software Configuration Baseline

    Installation and Interface Coordination · Baselines and manifests · 2013-08-18 · PRJ-B-005-WBS-IN-03 · PRJ-B-005-BL-IN-B01

    Establish the controlled controls / software configuration baseline needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-IN-004

    Loop Check, Continuity, and Calibration Records

    Installation and Interface Coordination · Records and logs · 2013-08-25 · PRJ-B-005-WBS-IN-04 · PRJ-B-005-BL-IN-B01

    Establish the controlled loop check, continuity, and calibration records needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-IN-005

    Cleaning, Flushing, and Pre-Operational Test Record

    Installation and Interface Coordination · Procedures · 2013-09-02 · PRJ-B-005-WBS-IN-01 · PRJ-B-005-BL-IN-B01

    Establish the controlled cleaning, flushing, and pre-operational test record needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-IN-006

    System Completion Dossier

    Installation and Interface Coordination · Dossiers and manual sets · 2013-09-09 · PRJ-B-005-WBS-IN-02 · PRJ-B-005-BL-IN-B01

    Establish the controlled system completion dossier needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-IN-007

    Ready-for-Commissioning Certificate

    Installation and Interface Coordination · Certificates and approvals · 2013-09-17 · PRJ-B-005-WBS-IN-03 · PRJ-B-005-BL-IN-B01

    Establish the controlled ready-for-commissioning certificate needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-CS-001

    Commissioning and Startup Plan

    Commissioning / Startup · Plans · 2013-09-24 · PRJ-B-005-WBS-CS-01 · PRJ-B-005-BL-CS-B01

    Establish the controlled commissioning and startup plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-CS-002

    Pre-Startup Safety / Operational Readiness Review

    Commissioning / Startup · Reports · 2013-10-01 · PRJ-B-005-WBS-CS-02 · PRJ-B-005-BL-CS-B01

    Establish the controlled pre-startup safety / operational readiness review needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-CS-003

    Commissioning Procedure and Results

    Commissioning / Startup · Procedures · 2013-10-08 · PRJ-B-005-WBS-CS-03 · PRJ-B-005-BL-CS-B01

    Establish the controlled commissioning procedure and results needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-CS-004

    Startup and Ramp-Up Log

    Commissioning / Startup · Registers and indexes · 2013-10-15 · PRJ-B-005-WBS-CS-04 · PRJ-B-005-BL-CS-B01

    Establish the controlled startup and ramp-up log needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-CS-005

    Performance Guarantee and Capacity Test Report

    Commissioning / Startup · Studies and analyses · 2013-10-22 · PRJ-B-005-WBS-CS-01 · PRJ-B-005-BL-CS-B01

    Establish the controlled performance guarantee and capacity test report needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-CS-006

    Reliability Demonstration Run Report

    Commissioning / Startup · Studies and analyses · 2013-10-29 · PRJ-B-005-WBS-CS-02 · PRJ-B-005-BL-CS-B01

    Establish the controlled reliability demonstration run report needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-CS-007

    Operator and Maintainer Training Record

    Commissioning / Startup · Records and logs · 2013-11-05 · PRJ-B-005-WBS-CS-03 · PRJ-B-005-BL-CS-B01

    Establish the controlled operator and maintainer training record needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-CS-008

    Commissioning Anomaly and Punch Closure Register

    Commissioning / Startup · Registers and indexes · 2013-11-12 · PRJ-B-005-WBS-CS-04 · PRJ-B-005-BL-CS-B01

    Establish the controlled commissioning anomaly and punch closure register needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-CS-009

    Performance Acceptance Certificate

    Commissioning / Startup · Certificates and approvals · 2013-11-20 · PRJ-B-005-WBS-CS-01 · PRJ-B-005-BL-CS-B01

    Establish the controlled performance acceptance certificate needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-OT-001

    As-Built / as-Configured Baseline Manifest

    Operational Turnover / Closeout · Baselines and manifests · 2013-11-25 · PRJ-B-005-WBS-OT-01 · PRJ-B-005-BL-OT-B01

    Establish the controlled as-built / as-configured baseline manifest needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-OT-002

    Operations and Maintenance Manual Set

    Operational Turnover / Closeout · Dossiers and manual sets · 2013-11-30 · PRJ-B-005-WBS-OT-02 · PRJ-B-005-BL-OT-B01

    Establish the controlled operations and maintenance manual set needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-OT-003

    Asset, Spare Parts, and Warranty Register

    Operational Turnover / Closeout · Registers and indexes · 2013-12-05 · PRJ-B-005-WBS-OT-03 · PRJ-B-005-BL-OT-B01

    Establish the controlled asset, spare parts, and warranty register needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-OT-004

    Final Technical and Commercial Acceptance Certificate

    Operational Turnover / Closeout · Certificates and approvals · 2013-12-10 · PRJ-B-005-WBS-OT-04 · PRJ-B-005-BL-OT-B01

    Establish the controlled final technical and commercial acceptance certificate needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-OT-005

    Operational Turnover Dossier and Ownership Transfer

    Operational Turnover / Closeout · Dossiers and manual sets · 2013-12-15 · PRJ-B-005-WBS-OT-01 · PRJ-B-005-BL-OT-B01

    Establish the controlled operational turnover dossier and ownership transfer needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-OT-006

    Final Cost, Schedule, Contract, and Claims Closeout

    Operational Turnover / Closeout · Studies and analyses · 2013-12-20 · PRJ-B-005-WBS-OT-02 · PRJ-B-005-BL-OT-B01

    Establish the controlled final cost, schedule, contract, and claims closeout needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-OT-007

    Controlled Records Archive and Retrieval Index

    Operational Turnover / Closeout · Registers and indexes · 2013-12-25 · PRJ-B-005-WBS-OT-03 · PRJ-B-005-BL-OT-B01

    Establish the controlled controlled records archive and retrieval index needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-OT-008

    Lessons Learned and Benefit Realization Baseline

    Operational Turnover / Closeout · Baselines and manifests · 2013-12-31 · PRJ-B-005-WBS-OT-04 · PRJ-B-005-BL-OT-B01

    Establish the controlled lessons learned and benefit realization baseline needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

Related analysis and application artifacts
Show 16 more connections
All portfolio connections
All portfolio connections (122)
Connected collections

Workstream & Initiative

WHAT COMES NEXT

Complex Challenge?
Let’s Work Through It.

Engineering leadership, capital projects, and independent consulting.

Start a conversation ↗