PARTICIPANT
Chiller Manufacturer
Follow the connected work in the portfolio.

Connected Work
Contributions Across the Portfolio
250-Ton Backup Chiller and 2000A 480V Bulk Electrical Upgrade
Project coordination
Project coordination
Onsite startup by chiller manufacturer technicians was planned in the standby-chiller AFE.
250 Ton Chiller Standby Capacity
Project coordination
Project coordination
Onsite startup by chiller manufacturer technicians was planned in the standby-chiller AFE.
All portfolio connections (5)
- Coordinated Installation and Tie-in of the 250-Ton Standby Chiller, Including Piping, Electrical and Startup Interfacesreferences supplierChiller Manufacturer ↗
- Chiller, Pumping and Cooling-Loop Interfacesreferences supplierChiller Manufacturer ↗
- Coordinated Replacement of Two 110-Ton Chillers and One 60-Ton Chiller with Three 160-Ton Chiller Unitsreferences supplierChiller Manufacturer ↗
- Chiller, Pumping and Cooling-Loop Interfacesreferences supplierChiller Manufacturer ↗
- Coordinated the Chiller, Pump Package and Piping Tie-Insreferences supplierChiller Manufacturer ↗