WORK CONTEXT

Drumming Pasteurizer Design and Procurement Package (2015)

Follow the connected work in the portfolio.

Conceptual engineering illustration: procurement logistics
Conceptual engineering visualization · AI generated

Connected Work

Additional Technical Detail

Explore 112 detail records
  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Manufacturing facility context.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Project: 200 HP Drumming Pasteurization System.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Initiated by: James Warren.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Funding: Miscellaneous Funds.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Completion timing: 12 weeks after approval.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Justification boxes selected: Quality and Regulatory; Stay in Business.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Dual quotations: Yes.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Assets to dispose: Yes.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Existing boiler supplier hot-water boiler described as 40 HP, operating at 100 percent and unable to pasteurize 110 GPM.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: The source states product was heat-treated to 135 degrees F while SOP #500 required 175 degrees F.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: The source states full pasteurization capacity was only 20 GPM.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Existing boiler described as leaking and made in 1987.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: A repair without warranty was stated to have been rejected by Engineering.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Proposed new hot-water boiler: 200 HP.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Proposed primary heat exchanger: 110 GPM product to 175 degrees F.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Proposed heat-recovery exchanger: unused exchanger ordered for another project, intended to bring white distilled vinegar drumming temperature to 145 to 155 degrees F.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Proposed controls: electric 3-way valve, sensors, and controller.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: The source states a hot-water generator was preferred to a steam boiler.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: DynaFlame boiler system and heat exchanger, installation contractor.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Install boilers, piping, RTD, and 3-way valves, installation contractor.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Demolish old boiler: expense.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: RTD and shipping provisions.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: valve supplier 3-way electric valve with shipping provisions.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Coordinated heat-exchanger shipment to the facility.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Electrical, electrical contractor.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Two instrumentation supplier UT35A controllers with shipping provisions.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: equipment distributor 3-way manual ball valve and shipping provisions.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Concrete pad, concrete contractor.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Unrealized depreciation, ACQFL B4.11: expense.

  • Technical reference
  • Technical reference
  • Technical reference
  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Preferred installation contractor: capital plus expense.

  • Technical reference
  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Selection rationale: installation contractor was higher and offered 100 HP plus extra capacity, while installation contractor offered 200 HP at lower cost.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Compared the preferred valve with the alternative supplier option.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Compared contractor options for the concrete pad.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: RTD, electrical contractor electrical, instrumentation supplier controllers, valve, depreciation, contingency, and shipping were listed without dual vendor quotes, with source-provided justifications where applicable.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: installation contractor proposal date: 2015-01-13.

  • Technical reference
  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Proposed one 100 HP Boiler supplier hot-water boiler and one 50 HP Boiler supplier hot-water boiler.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Proposed 110 GPM Sanitary-pump supplier sanitary centrifugal pump.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Proposed two new 316 stainless-steel heat exchangers and 316 stainless-steel vinegar lines.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Lead times stated: boiler 9 to 12 weeks; heat exchangers 4 to 8 weeks; piping 3 to 5 days.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Commercial terms stated: 50 percent, 30 percent at delivery, remainder net 20.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: installation contractor proposal date: 2015-03-12.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Two DynaFlame DF4000 units, each 4,000 MBH input and 3,510 MBH output.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: heat-transfer equipment supplier 42.FFW25 316L plate-and-frame heat exchanger designed for 110 GPM product, 200 degrees F hot water, and 175 degrees F leaving product.

  • Technical reference
  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Installation description includes two boilers, 6-inch welded 316L hot-water piping, 2-inch welded 316L gas line as written, and 460-60-3V electrical service.

  • Technical reference
  • Technical reference
  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Startup included; stated duration 3 to 5 weeks; stated terms 30/70.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Case 1: 470 GPM hot water and 110 GPM cold/product; hot side 200 to 177.4 degrees F; cold side 80 to 175 degrees F; duty 5,163.9 kBTU/h.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Case 2: 235 GPM hot water and 80 GPM cold/product; hot side 200 to 167.1 degrees F; cold side 80 to 175 degrees F; duty 3,755.6 kBTU/h.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Design lists 32 plates, 304 stainless steel, 0.4 mm, NBR gaskets, 4-inch connections, and ASME construction.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Model: UXP-005-L-6-UI-28.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Steam temperature: 292 degrees F.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Water design: 100 GPM, 50 to 85 degrees F.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Steam flow: 1,856.23 lb/h.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Duty: 1,746,303 BTU/h.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Heat-transfer area: 16.51 square feet.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: LMTD: 223.46 degrees F.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Process sequence: receiving, fermentation, batching, filtration, pasteurization, and inline filling.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Tank V48 with agitation and sprayball; maximum 6,000 gallons and minimum 1,500 gallons.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Fermentation: 70 to 76 degrees F.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Alcohol: 6 to 9 percent.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Salt: 1.5 to 1.7 percent.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Turbidity: less than 0.5 NTU.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Filtration: 0.45 micrometers.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Pasteurization: 170 degrees F.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Drum filling: 160 to 170 degrees F.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Finished drums: refrigerated.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: valve supplier quoted a 2-inch stainless 3-port diverter electric ball valve, model EYSA8AJE02, 115 VAC.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: instrumentation supplier quote dated 2015-03-04 includes sanitary RTD model PRS-3-100-A-H-0500-D1-NB9W, 5-inch length.

  • Technical reference
  • Technical reference

    The 2015 drumming-pasteurizer technical package records: equipment distributor 316 stainless 2-inch NPT manual 3-port valve.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: instrumentation supplier quote dated 2015-03-25 compares UT32A and UT35A controllers; the workbook instead budgets two UT35A units.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: concrete contractor proposal dated 2015-03-13: reinforced 6 by 6 by 6-inch pad, #5 at 12 inches OCEW, 4,000 psi concrete, bell-edge footer, pump included.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: concrete contractor alternate concrete-pad quote.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Drawing title: -Pasteurization Process Flow-Proposal-2.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Title-block date: 2014-11-07.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Designed and drawn by: Jainil.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Title block shows drawing number LAWG E10144 while the rendered source path references LAWG E10145, an internal identifier discrepancy.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Existing boiler supplier water heater labeled 1,340,000 BTU/hr and marked for replacement with a higher-capacity water heater.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Two new DynaFlame water heaters are labeled 100 HP each, total 200 HP, 230 V, 1 phase, boiler 20 amps each, pump 30 amps each.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: New primary heat exchanger; new heat-exchanger supplier heat-recovery exchanger with 16.51 square feet of heat-exchange area and 2-inch threaded connections.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: New pump: 160-foot head, 110 GPM, 10.2-inch impeller, sanitary-pump supplier APV W+110/130.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: New instrumentation supplier CIP RTD temperature probe, 2-inch Tri-Clamp, 4-inch length, RTD-S04-02.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: valve supplier 2-inch explosion-proof 120 VAC 3-way electric ball valve, model H33DAXB7A.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: White distilled vinegar path: inlet 75 degrees F, preheated to 85 degrees F, heated to 175 degrees F, and 155 degrees F after heat recovery.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Heat-recovery exchanger is identified for white distilled vinegar only and bypassed for balsamic cooking and Porter Ale Beer pasteurization.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Recirculation annotation applies when pasteurized product is below 150 degrees F.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Existing boiler to be demolished.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Existing heat exchanger to be demolished.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Existing holding loop to be moved.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: New concrete to be poured for heat exchanger and pump installation.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: New heat-recovery exchanger and pasteurization pump location.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: New primary heat exchanger for pasteurization.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: New control panel with 110 VAC power available.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: New DynaFlame skid-mounted boiler layout labeled 480 VAC, 60 amps, 1 phase.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Existing storage racks to be moved to accommodate new boiler equipment.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Drawing-file identifier visible in the source path: LABGE10149.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: electrical contractor proposal number 1008, dated 2015-03-19, submitted to Food and beverage manufacturer Americas.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Scope was revised per Jainil Desai email dated 2015-03-19.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Provide/install 18 x 24 x 10 stainless enclosure with wood backplate near existing rotary chart recorder.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Mount owner-supplied keypads; provide dedicated 110 V power; install 3-conductor cable for a 100-ohm platinum RTD; provide 110 V power and 2-wire conductor to one electric actuator.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Use stainless-steel strut/components and aluminum rigid conduit.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Provide a new 60 A, 3-phase, 480 V circuit to the new boiler.

  • Technical reference

    The 2015 drumming-pasteurizer technical package records: Provide circuit for a 10 HP pump with VFD, disconnect, and start/stop station.

  • Technical reference
  • Work-package scope

    200 HP hot-water pasteurization design and procurement package, including boiler and exchanger alternatives, process drawings, controls, installation quotations and cost basis.

Measures & Operating Context

MeasureValueType & meaningAttribution & operating context
Schedule After Approval12 weekTarget
Conditional schedule

Applies to: Drumming pasteurizer design and procurement package (2015)

Schedule After Approval

Existing Boiler Rating40 hpEquipment Rating
Existing equipment rating

Applies to: Drumming pasteurizer design and procurement package (2015)

Existing Boiler Rating

Existing Boiler Operating Load100 percentObservation
Reported existing load

Applies to: Drumming pasteurizer design and procurement package (2015)

Existing Boiler Operating Load

Existing Product Heat-Treatment Temperature135 deg FBaseline
Reported baseline

Applies to: Drumming pasteurizer design and procurement package (2015)

Existing Product Heat-Treatment Temperature

Existing Full-Pasteurization Flow20 gpmBaseline
Reported baseline

Applies to: Drumming pasteurizer design and procurement package (2015)

Existing Full-Pasteurization Flow

Proposed Boiler System Rating200 hpEquipment Rating
Proposed equipment rating

Applies to: Drumming pasteurizer design and procurement package (2015)

Proposed Boiler System Rating

Proposed Primary Product Flow110 gpmDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

Proposed Primary Product Flow

Proposed Pasteurization Product Temperature175 deg FDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 design point; not a universal minimum in the historical product standard.

Proposed Drumming Temperature After Recovery145 to 155 deg FDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

Proposed Drumming Temperature After Recovery

Budgeted UT35A Controller Quantity2 countScope or Inventory Quantity
Budget quantity

Applies to: Drumming pasteurizer design and procurement package (2015)

Budgeted UT35A Controller Quantity

Primary Hot-Water Boiler Rating100 hpEquipment Rating
Alternative specified equipment

Applies to: Drumming pasteurizer design and procurement package (2015)

Primary boiler supplier hot-water boiler

Secondary Hot-Water Boiler Rating50 hpEquipment Rating
Alternative specified equipment

Applies to: Drumming pasteurizer design and procurement package (2015)

Secondary boiler supplier hot-water boiler

Sanitary Pump Specified Flow110 gpmEquipment Rating
Alternative specified equipment

Applies to: Drumming pasteurizer design and procurement package (2015)

Sanitary-pump supplier sanitary pump flow

Alternative Stainless Exchanger Quantity2 countScope or Inventory Quantity
Alternative specified quantity

Applies to: Drumming pasteurizer design and procurement package (2015)

Alternative Stainless Exchanger Quantity

Boiler Lead Time9 to 12 weekEstimate
Alternative vendor schedule

Applies to: Drumming pasteurizer design and procurement package (2015)

Boiler Lead Time

Exchanger Lead Time4 to 8 weekEstimate
Alternative vendor schedule

Applies to: Drumming pasteurizer design and procurement package (2015)

Exchanger Lead Time

Piping Installation Duration3 to 5 dayEstimate
Alternative vendor schedule

Applies to: Drumming pasteurizer design and procurement package (2015)

Piping Installation Duration

Initial Payment Fraction50 percentQuotation
Alternative commercial term

Applies to: Drumming pasteurizer design and procurement package (2015)

Initial Payment Fraction

Delivery Payment Fraction30 percentQuotation
Alternative commercial term

Applies to: Drumming pasteurizer design and procurement package (2015)

Delivery Payment Fraction

Remainder Payment Term20 dayQuotation
Alternative commercial term

Applies to: Drumming pasteurizer design and procurement package (2015)

Remainder Payment Term

DynaFlame Unit Quantity2 countScope or Inventory Quantity
Preferred specified quantity

Applies to: Drumming pasteurizer design and procurement package (2015)

DynaFlame Unit Quantity

DynaFlame Unit Input4,000 MBHEquipment Rating
Preferred specified unit rating

Applies to: Drumming pasteurizer design and procurement package (2015)

DynaFlame Unit Input

DynaFlame Unit Output3,510 MBHEquipment Rating
Preferred specified unit rating

Applies to: Drumming pasteurizer design and procurement package (2015)

DynaFlame Unit Output

Heat-Transfer Supplier Design Product Flow110 gpmDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

Heat-transfer equipment supplier design product flow

Heat-Transfer Supplier Hot-Water Design Temperature200 deg FDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

Heat-transfer equipment supplier hot-water design temperature

Heat-Transfer Supplier Leaving-Product Temperature175 deg FDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

Heat-transfer equipment supplier leaving-product temperature

Preferred Hot-Water Pipe Nominal Diameter6 inDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

Preferred Hot-Water Pipe Nominal Diameter

Preferred Gas-Pipe Nominal Diameter as Written2 inDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

Preferred Gas-Pipe Nominal Diameter as Written

Preferred Proposal Electrical Voltage460 VDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 Installation contractor preferred proposal — Preferred proposal electrical voltage

Preferred Proposal Electrical Frequency60 HzDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 Installation contractor preferred proposal — Preferred proposal electrical frequency

Preferred Proposal Electrical Phase Count3 countDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 Installation contractor preferred proposal — Preferred proposal electrical phase count

Contractor Installation and Startup Duration3 to 5 weekEstimate
Preferred vendor schedule

Applies to: Drumming pasteurizer design and procurement package (2015)

Installation contractor installation/startup duration

Installation Contractor Initial Payment Fraction30 percentQuotation
Preferred commercial term

Applies to: Drumming pasteurizer design and procurement package (2015)

Installation Contractor Initial Payment Fraction

Installation Contractor Remaining Payment Fraction70 percentQuotation
Preferred commercial term

Applies to: Drumming pasteurizer design and procurement package (2015)

Installation Contractor Remaining Payment Fraction

Hot-Side Flow470 gpmDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

Exchanger design case 1 — Hot-side flow

Product-Side Flow110 gpmDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

Exchanger design case 1 — Product-side flow

Hot-Side Inlet Temperature200 deg FDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

Exchanger design case 1 — Hot-side inlet temperature

Hot-Side Outlet Temperature177.4 deg FDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

Exchanger design case 1 — Hot-side outlet temperature

Product Inlet Temperature80 deg FDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

Exchanger design case 1 — Product inlet temperature

Product Outlet Temperature175 deg FDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

Exchanger design case 1 — Product outlet temperature

Exchanger Duty5,163.9 kBTU/hDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

Exchanger design case 1 — Exchanger duty

Hot-Side Flow235 gpmDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

Exchanger design case 2 — Hot-side flow

Product-Side Flow80 gpmDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

Exchanger design case 2 — Product-side flow

Hot-Side Inlet Temperature200 deg FDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

Exchanger design case 2 — Hot-side inlet temperature

Hot-Side Outlet Temperature167.1 deg FDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

Exchanger design case 2 — Hot-side outlet temperature

Product Inlet Temperature80 deg FDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

Exchanger design case 2 — Product inlet temperature

Product Outlet Temperature175 deg FDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

Exchanger design case 2 — Product outlet temperature

Exchanger Duty3,755.6 kBTU/hDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

Exchanger design case 2 — Exchanger duty

Exchanger Plate Count32 countDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 vendor thermal design specification — Exchanger plate count

Exchanger Plate Thickness0.4 mmDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 vendor thermal design specification — Exchanger plate thickness

Exchanger Connection Nominal Diameter4 inDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 vendor thermal design specification — Exchanger connection nominal diameter

Heat-Recovery Steam Temperature292 deg FDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 vendor thermal design specification — Heat-recovery steam temperature

Heat-Recovery Water Flow100 gpmDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 vendor thermal design specification — Heat-recovery water flow

Heat-Recovery Water Inlet Temperature50 deg FDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 vendor thermal design specification — Heat-recovery water inlet

Heat-Recovery Water Outlet Temperature85 deg FDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 vendor thermal design specification — Heat-recovery water outlet

Heat-Recovery Steam Flow1,856.23 lb/hDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 vendor thermal design specification — Heat-recovery steam flow

Heat-Recovery Exchanger Duty1,746,303 BTU/hDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 vendor thermal design specification — Heat-recovery exchanger duty

Heat-Recovery Area16.51 ft2Design Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 vendor thermal design specification — Heat-recovery area

Heat-Recovery LMTD223.46 deg FDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 vendor thermal design specification — Heat-recovery LMTD

V48 Working Volume1,500 to 6,000 galDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

Salted Porter product specification — V48 working volume

Fermentation Temperature70 to 76 deg FDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

Salted Porter product specification — Fermentation temperature

Brix Limit< 3 BrixDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

Salted Porter product specification — Brix limit

Alcohol Specification6 to 9 percentDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

Salted Porter product specification — Alcohol specification

Salt Specification1.5 to 1.7 percentDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

Salted Porter product specification — Salt specification

Turbidity Limit< 0.5 NTUDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

Salted Porter product specification — Turbidity limit

Filtration Rating0.45 micrometerDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

Salted Porter product specification — Filtration rating

Pasteurization Temperature170 deg FDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

Salted Porter product specification — Pasteurization temperature

Drum-Filling Temperature160 to 170 deg FDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

Salted Porter product specification — Drum-filling temperature

Valve Nominal Diameter2 inDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

valve nominal diameter

Actuator Supply Voltage115 VACEquipment Rating
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

actuator supply

Supplier-Specified Sanitary RTD Length5 inDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

Instrumentation supplier sanitary RTD length

Concrete Specified Strength4,000 psiDesign Parameter
Vendor construction specification

Applies to: Drumming pasteurizer design and procurement package (2015)

Concrete Specified Strength

Existing Heater Heat Input Label1,340,000 BTU/hEquipment Rating
Existing drawing label

Applies to: Drumming pasteurizer design and procurement package (2015)

Existing Heater Heat Input Label

Drawing Individual Heater Rating100 hpEquipment Rating
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 process proposal drawing — Drawing individual heater rating

Drawing Heater Voltage230 VEquipment Rating
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 process proposal drawing — Drawing heater voltage

Drawing Heater Phase Count1 countEquipment Rating
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 process proposal drawing — Drawing heater phase count

Drawing Boiler Current per Unit20 AEquipment Rating
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 process proposal drawing — Drawing boiler current per unit

Drawing Pump Current per Unit30 AEquipment Rating
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 process proposal drawing — Drawing pump current per unit

Supplier Drawing: Heat-Exchanger Connection Diameter2 inDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 process proposal drawing — Heat-exchanger supplier drawing connection diameter

Proposed Pump Head160 ftDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 process proposal drawing — Proposed pump head

Proposed Pump Flow110 gpmDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 process proposal drawing — Proposed pump flow

Proposed Pump Impeller Diameter10.2 inDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 process proposal drawing — Proposed pump impeller diameter

RTD Tri-Clamp Diameter2 inDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 process proposal drawing — RTD tri-clamp diameter

RTD Probe Length4 inDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 process proposal drawing — RTD probe length

Valve Nominal Diameter2 inDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 process proposal drawing — valve nominal diameter

Actuator Voltage120 VACEquipment Rating
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 process proposal drawing — actuator voltage

WDV Inlet Temperature75 deg FDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 process proposal drawing — WDV path — WDV inlet temperature

WDV Preheat Temperature85 deg FDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 process proposal drawing — WDV path — WDV preheat temperature

WDV Primary Heated Temperature175 deg FDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 process proposal drawing — WDV path — WDV primary heated temperature

WDV Post-Recovery Temperature155 deg FDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 process proposal drawing — WDV path — WDV post-recovery temperature

Drawing Recirculation Temperature Trigger< 150 deg FDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 process proposal drawing — Drawing recirculation temperature trigger

Layout Control-Panel Voltage110 VACDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 proposed layout drawing — Layout control-panel voltage

Layout Heater Voltage480 VACDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 proposed layout drawing — Layout heater voltage

Layout Heater Current60 ADesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 proposed layout drawing — Layout heater current

Layout Heater Phase Count1 countDesign Parameter
2015 design value

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 proposed layout drawing — Layout heater phase count

Enclosure Width18 inDesign Parameter
Electrical vendor scope

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 Electrical contractor electrical proposal — Enclosure width

Enclosure Height24 inDesign Parameter
Electrical vendor scope

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 Electrical contractor electrical proposal — Enclosure height

Enclosure Depth10 inDesign Parameter
Electrical vendor scope

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 Electrical contractor electrical proposal — Enclosure depth

Dedicated Controls Supply Voltage110 VDesign Parameter
Electrical vendor scope

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 Electrical contractor electrical proposal — Dedicated controls power

RTD Resistance Rating100 ohmEquipment Rating
Electrical vendor scope

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 Electrical contractor electrical proposal — RTD resistance rating

RTD Cable Conductor Count3 countDesign Parameter
Electrical vendor scope

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 Electrical contractor electrical proposal — RTD cable conductor count

Actuator Conductor Count2 countDesign Parameter
Electrical vendor scope

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 Electrical contractor electrical proposal — Actuator conductor count

New Boiler Circuit Rating60 ADesign Parameter
Electrical vendor scope

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 Electrical contractor electrical proposal — New boiler circuit rating

New Boiler Circuit Voltage480 VDesign Parameter
Electrical vendor scope

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 Electrical contractor electrical proposal — New boiler circuit voltage

New Boiler Circuit Phase Count3 countDesign Parameter
Electrical vendor scope

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 Electrical contractor electrical proposal — New boiler circuit phase count

Pump Motor Rating10 hpEquipment Rating
Electrical vendor scope

Applies to: Drumming pasteurizer design and procurement package (2015)

2015 Electrical contractor electrical proposal — Pump motor rating

All portfolio connections (7)

WHAT COMES NEXT

Complex Challenge?
Let’s Work Through It.

Engineering leadership, capital projects, and independent consulting.

Start a conversation ↗