APOLLO AUTOMATIONJAMES WARREN · ENGINEERING & PROJECT LEADERSHIPPRJ-A-009 · Food and beverage manufacturer
Owned the full lifecycle of this project, connecting capital planning, engineering, delivery and operating readiness. Additional acetation capacity brought simultaneous demands for aeration, cooling, filtration, emissions control and electrical resilience. The controls architecture needed to coordinate these systems as an operating process.

Workstream: Vinegar Acetation and Fermentation-Support Modernization
Additional acetation capacity brought simultaneous demands for aeration, cooling, filtration, emissions control and electrical resilience. The controls architecture needed to coordinate these systems as an operating process.
Developed the integrated scope for acetator tanks, air and cooling services, scrubber connections, filtration and standby power. PLC and HMI requirements connected equipment behavior with operator visibility and the verification needed for startup.
Increase WDV production by 5.8M 100-grain gallons per year and increase WDV production by 446,500 100-grain gallons per year from conversion of existing units.
acetator tanks and aerators, scrubber columns, filtration equipment, cooling tower, cooling-water separator, standby generator and automatic transfer switching, PLC PLC and operator interface Visual SCADA
Full lifecycle project ownership
Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.
AFE Project Lead
Named Project Responsibility
Named project lead for the Acetator Expansion AFE.

Capital Strategy and Business Alignment
Engineering practice and documented application

Project Lifecycle, FEL, and Execution Models
Engineering practice and documented application


Scheduling, Shutdowns, and Execution Sequencing
Engineering practice and documented application

Estimate · Schedule allowance
Applies to: Planned common cooling work and sequential unit outages for A5/A6/A7, contractor exclusion zones and tanker-loading fall-arrest recertification
All affected units — Common cooling shutdown — All affected units

Scheduling, Shutdowns, and Execution Sequencing
Engineering practice and documented application

Estimate · Schedule allowance
Applies to: Planned common cooling work and sequential unit outages for A5/A6/A7, contractor exclusion zones and tanker-loading fall-arrest recertification
All affected units — Common cooling shutdown — All affected units
Owned capital planning and the full delivery lifecycle. The cards connect the applicable responsibilities with the recorded work.

Capital Strategy and Business Alignment
Engineering practice and documented application

Project Lifecycle, FEL, and Execution Models
Engineering practice and documented application

Scheduling, Shutdowns, and Execution Sequencing
Engineering practice and documented application

Execution planning
Applies capabilities


Investment Economics and Lifecycle Analysis
Engineering practice and documented application

Investment Economics and Lifecycle Analysis
Engineering practice and documented application

Risk, Uncertainty, and Decision Support
Engineering practice and documented application

Baseline · Historical design basis
Applies to: Related the acetator expansion to the existing production base, WDV supply deficit, interplant freight and air-emission requirements for new and existing equipment
Pre-expansion — Existing acetators — Pre-expansion

Statistical Quality, Measurement Systems, and Sampling
Academic preparation and analytical method

Forecasting, Inventory, Supply Chain, and Logistics
Academic preparation and analytical method

Stochastic Models and Uncertainty Analytics
Academic preparation and analytical method

Stochastic Models and Uncertainty Analytics
Academic preparation and analytical method

Data Analytics, BI, and Operational Reporting
Engineering practice and documented application

Lean Six Sigma, Quality Systems, and Governance Maturity
Engineering practice and documented application

Investment Economics and Lifecycle Analysis
Engineering practice and documented application

Investment Economics and Lifecycle Analysis
Engineering practice and documented application

Thermal/Hydraulic Analysis and Engineering-Calculation Review
Engineering practice and documented application

Thermal/Hydraulic Analysis and Engineering-Calculation Review
Engineering practice and documented application

Baseline · Historical design basis
Applies to: Related the acetator expansion to the existing production base, WDV supply deficit, interplant freight and air-emission requirements for new and existing equipment
Pre-expansion — Existing acetators — Pre-expansion

Data Analytics, BI, and Operational Reporting
Engineering practice and documented application

Data Analytics, BI, and Operational Reporting
Engineering practice and documented application

Chillers, Cooling Towers, and Process Cooling
Engineering practice and documented application

Chillers, Cooling Towers, and Process Cooling
Engineering practice and documented application

Chillers, Cooling Towers, and Process Cooling
Engineering practice and documented application

TSK-000019 · Technical context
Acetator Expansion

TSK-000853 · Action
Acetator Expansion

Estimate · Schedule allowance
Applies to: Planned common cooling work and sequential unit outages for A5/A6/A7, contractor exclusion zones and tanker-loading fall-arrest recertification
All affected units — Common cooling shutdown — All affected units

PLC, HMI, SCADA, Drives, and Process Automation
Engineering practice and documented application

PLC, HMI, SCADA, Drives, and Process Automation
Engineering practice and documented application

PLC, HMI, SCADA, Drives, and Process Automation
Engineering practice and documented application

TSK-000019 · Technical context
Acetator Expansion

TSK-000855 · Action
Acetator Expansion

Wastewater, Environmental Compliance, and VOC Control
Engineering practice and documented application

TSK-000019 · Technical context
Acetator Expansion

TSK-000854 · Action
Acetator Expansion

Baseline · Historical design basis
Applies to: Related the acetator expansion to the existing production base, WDV supply deficit, interplant freight and air-emission requirements for new and existing equipment
Pre-expansion — Existing acetators — Pre-expansion

Electrical Testing, Standby Power, and Energization
Engineering practice and documented application

TSK-000019 · Technical context
Acetator Expansion

Site Access, Traffic, and Exterior Improvements
Engineering practice and documented application

Estimate · Schedule allowance
Applies to: Planned common cooling work and sequential unit outages for A5/A6/A7, contractor exclusion zones and tanker-loading fall-arrest recertification
All affected units — Common cooling shutdown — All affected units

Fermentation, Acetation, and Microbiological Processing
Engineering practice and documented application

TSK-000019 · Technical context
Acetator Expansion

TSK-000853 · Action
Acetator Expansion

Baseline · Historical design basis
Applies to: Related the acetator expansion to the existing production base, WDV supply deficit, interplant freight and air-emission requirements for new and existing equipment
Pre-expansion — Existing acetators — Pre-expansion
Process-side separation and recovery reduced product loss and the load reaching wastewater. Environmental work also included runoff and sediment control, vapor exposure mitigation and acetator emissions capture. Connected these requirements with production continuity, equipment interfaces and maintainable safeguards.

Wastewater, Environmental Compliance, and VOC Control
Engineering practice and documented application



Project design basis
Applies capabilities
Coordinated service capacity, distribution equipment, grounding, conduit, MCC connections, standby power and automatic transfer interfaces. Hazardous-area wiring and heat-trace requirements formed part of process-area electrical design. Utility coordination and energization readiness connected infrastructure planning with safe field execution.

Electrical Testing, Standby Power, and Energization
Engineering practice and documented application

Biological production depends on coordinated air, cooling, nutrients, transfer and environmental controls. Aligned vessel and support-system changes with upstream and downstream capacity, maintenance access, instrumentation and startup requirements. That integration connected process expansion with the plant's ability to operate it reliably.

Fermentation, Acetation, and Microbiological Processing
Engineering practice and documented application



Project design basis
Applies capabilities
PRJ-A-009 | Acetator Expansion | classification ASEPTIC_OR_HYGIENIC_PRODUCT_PROCESSING
Check WDV production after startup, including mash-on-fly performance, scrubber behavior, filtration capacity and utility/control commissioning.
Compliance / Environmental.
Workstream scope alignment, capital authorization, risk-register review, QA/QC and commissioning planning.

TSK-000019 · Technical context
Acetator Expansion

TSK-000853 · Action
Acetator Expansion

TSK-000854 · Action
Acetator Expansion

TSK-000855 · Action
Acetator Expansion

TSK-001024 · Project design basis
Acetator Expansion

TSK-001032 · Execution planning
Acetator Expansion
Workstream Portfolio Rollup
66,885,000 USD
Vinegar Acetation and Fermentation-Support Modernization
Recorded workstream portfolio reference. This is the workstream-level value and is not a project expenditure or a new total of reassigned projects.
| Measure or outcome | Value or result | Meaning and operating scope |
|---|---|---|
| Recorded outcome | Planned 5.8M additional 100-grain gallons/year, plus 446,500 100-grain gallons/year from conversion of existing units. | Acetator Expansion |
| Recorded outcome | These are source planning targets, with no final operating-capacity acceptance asserted. | Acetator Expansion |
CASE-013 · Engineering case
Developed an acetator expansion concept with cooling, VOC control, generator, filtration and automation interfaces.
Read the Case ↗