TSK-000044 · Method
Designed 2x2-to-2x3 Modular Growth, Parallel Marlin Coordination, Load Balancing, and Failover Routing
Explore the capability, case, and equipment connections for this activity.

Case Context
Ceramic Filtration Modular Expansion Strategy ↗Project Context
PRJ-A-010 · Ceramic Crossflow Filter System + Ion Exchange Trial ↗Capabilities
- Compare Repair, Replacement and Deferred ExpansionRecorded application
Why these connect
The source model links this activity to the capability.
- Plan Modular Filtration Growth and FailoverRecorded application
Why these connect
The source model links this activity to the capability.
All Portfolio Connections
All portfolio connections (7)
- Ceramic Filtration, Membranes, and Polishing — Application Review Review artifact
- Investment Economics and Lifecycle Analysis — Application Review Review artifact
- Compare Repair, Replacement and Deferred Expansion Recorded application
- Plan Modular Filtration Growth and Failover Recorded application
- Designed 2x2-to-2x3 Modular Growth, Parallel Marlin Coordination, Load Balancing, and Failover Routing ↗ Existing portfolio connection
- Ceramic Crossflow Filter System + Ion Exchange Trial Existing portfolio connection
- Ceramic Filtration Modular Expansion Strategy Existing portfolio connection
Project Ownership and Delivery Context
Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.
Compared filtration options against demand and lifecycle requirements, integrated CIP and instrumentation with dedicated electrical feeds, and developed clean-water-flux tracking and maintenance follow-up. Ion-exchange testing extended the investigation into product clarity and quality, while modular expansion planning connected the equipment choice with future operating demand.
Related Analysis and Application Artifacts
- Ceramic Filtration, Membranes, and Polishing — Application ReviewCapability application review
- Investment Economics and Lifecycle Analysis — Application ReviewCapability application review
