TSK-000130 · Method

Coordinated Installation of the Combo Capper, Conveyors, Cap Elevator, Cryogenic Dosing Retrofit, Bulk Storage, Telemetry, SCADA Controls and Safety Interlocks, with Vendor-Supported Startup

Explore the capability, case, and equipment connections for this activity.

Conceptual engineering illustration: procurement logistics
Conceptual engineering visualization · AI generated

Roles & Contributions

Case Context

Line 1 Capper, Conveyor, Cap Elevator, Cryogenic Dosing, and Bulk Nitrogen Modernization ↗

Capabilities

Systems & Equipment

All Portfolio Connections

All portfolio connections (15)

Project Ownership and Delivery Context

Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.

Coordinated the capper, cap elevator and conveyor changes with nitrogen storage and dosing controls. SCADA verification connected dosing behavior with operating visibility, while equipment selection and maintenance considerations supported the 150 BPM rated capper capacity.