TSK-000377 · Action
Drainage-Screen Materials and Installation Specifications
Explore the capability, case, and equipment connections for this activity.

Activity Detail
Specified 304/316 stainless screens, 0.25-0.5 in openings, 12-gauge screen material, 34-degree tilt, bracket mounting to concrete tank pad side wall and drainage channel far wall, slotted guide rails, lift-out handles, optional hinged/latch design, 1/4 in stainless brackets, 1/2 in stainless anchors, 3-in minimum embedment, 1 in x 1 in x 1/8 in stainless angle frame, 3/8 in rods/cross-bracing, 1/4 in stainless edge bar, quick-release pins/bolt locks, and optional neoprene/vibration pads.
Case Context
Removable Debris Screen System ↗Project Context
PRJ-A-033 · Drainage and Erosion-Control Project Overview ↗Capabilities
- Design Maintainable Debris ScreensRecorded application
Why these connect
The source model links this activity to the capability.
Systems & Equipment
All Portfolio Connections
All portfolio connections (6)
- Stormwater, Drainage, and Erosion Control — Application Review Review artifact
- Design Maintainable Debris Screens Recorded application
- Drainage-Screen Materials and Installation Specifications ↗ Existing portfolio connection
- Drainage and Stormwater ↗ Existing portfolio connection
- Drainage and Erosion-Control Project Overview Existing portfolio connection
- Removable Debris Screen System Existing portfolio connection
Project Ownership and Delivery Context
Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.
Developed the reinforced channel, debris screens, five-step weir, outlet basin and stabilization scope. Curbing, grading, landscaping and wastewater-collection interfaces were coordinated with the work. The system reduced sediment carry by more than 90 percent while providing a maintainable runoff path.
Related Analysis and Application Artifacts
- Stormwater, Drainage, and Erosion Control — Application ReviewCapability application review
