TSK-000405 · Capital planning
Included Wastewater-Panel Orientation in the Capital-Planning Review
Explore the capability, case, and equipment connections for this activity.

Case Context
Five-Year Capital Planning and Asset Lifecycle Roadmap ↗Capabilities
- Integrate Facility Design and PermittingRecorded application
Why these connect
The source model links this activity to the capability.
Systems & Equipment
All Portfolio Connections
All portfolio connections (5)
- Ventilation, Control Rooms, and Equipment Protection — Application Review Review artifact
- Integrate Facility Design and Permitting Recorded application
- Included Wastewater-Panel Orientation in the Capital-Planning Review ↗ Existing portfolio connection
- Wastewater ↗ Existing portfolio connection
- Five-Year Capital Planning and Asset Lifecycle Roadmap Existing portfolio connection
Related Analysis and Application Artifacts
- Ventilation, Control Rooms, and Equipment Protection — Application ReviewCapability application review
