PRJ-A-002 · Line 2 Pasteurizer Upgrades ↗Capabilities
- Integrate Temperature, Flow and Level MeasurementRecorded application
Why these connect
The source model links this activity to the capability.
- Specify and Verify Process InstrumentsRecorded application
Why these connect
The source model links this activity to the capability.
Systems & Equipment
All Portfolio Connections
All portfolio connections (6)
- Instrumentation, Measurement, and Standards — Application Review Review artifact
- Integrate Temperature, Flow and Level Measurement Recorded application
- Specify and Verify Process Instruments Recorded application
- Defined Hot-Water, Instrumentation and Control-System Improvements ↗ Existing portfolio connection
- Process Instrumentation ↗ Existing portfolio connection
- Line 2 Pasteurizer Upgrades Existing portfolio connection
Project Ownership and Delivery Context
Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.
Reviewed hold-tube length, process flow and thermal-control requirements, translated those requirements into the upgrade scope, and coordinated production, quality and utility interfaces. The delivery approach connected the design basis with controls verification and operating readiness.
Related Analysis and Application Artifacts