Capital Strategy and Business Alignment
Translate Growth Forecasts, Customer Demand, Operating Constraints, and Asset Condition into Capital Priorities
Engineering practice and documented application
APOLLO AUTOMATIONJAMES WARREN · ENGINEERING & PROJECT LEADERSHIPPRJ-A-002 · Food and beverage manufacturer
Owned the full lifecycle of this project, connecting capital planning, engineering, delivery and operating readiness. Pasteurization depends on the relationship between flow, holding time and temperature. The work addressed that relationship across the hot-water system, instrumentation and automation so that product treatment and line operation could be managed together.

Workstream: Production and Packaging Modernization
Pasteurization depends on the relationship between flow, holding time and temperature. The work addressed that relationship across the hot-water system, instrumentation and automation so that product treatment and line operation could be managed together.
Reviewed hold-tube length, process flow and thermal-control requirements, translated those requirements into the upgrade scope, and coordinated production, quality and utility interfaces. The delivery approach connected the design basis with controls verification and operating readiness.
Restore regulatory compliance and thermal stability with a rebuilt hot water set and automation upgrades.
Bottling & Packaging Systems, CIP Automation
Full lifecycle project ownership
Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.

Capital Strategy and Business Alignment
Engineering practice and documented application

Project Lifecycle, FEL, and Execution Models
Engineering practice and documented application

Action
Applies capabilities

Workstream, Portfolio, and Stakeholder Leadership
Engineering practice and documented application

TSK-000834 · Action
Line 2 Pasteurizer Upgrades
Owned capital planning and the full delivery lifecycle. The cards connect the applicable responsibilities with the recorded work.

Capital Strategy and Business Alignment
Engineering practice and documented application

Project Lifecycle, FEL, and Execution Models
Engineering practice and documented application

Workstream, Portfolio, and Stakeholder Leadership
Engineering practice and documented application


Action
Applies capabilities

Risk, Uncertainty, and Decision Support
Engineering practice and documented application

Statistical Quality, Measurement Systems, and Sampling
Academic preparation and analytical method

Statistical Quality, Measurement Systems, and Sampling
Academic preparation and analytical method

Forecasting, Inventory, Supply Chain, and Logistics
Academic preparation and analytical method

Stochastic Models and Uncertainty Analytics
Academic preparation and analytical method

Stochastic Models and Uncertainty Analytics
Academic preparation and analytical method

Data Analytics, BI, and Operational Reporting
Engineering practice and documented application

Thermal/Hydraulic Analysis and Engineering-Calculation Review
Engineering practice and documented application

Thermal/Hydraulic Analysis and Engineering-Calculation Review
Engineering practice and documented application

Thermal/Hydraulic Analysis and Engineering-Calculation Review
Engineering practice and documented application

Thermal/Hydraulic Analysis and Engineering-Calculation Review
Engineering practice and documented application

Thermal/Hydraulic Analysis and Engineering-Calculation Review
Engineering practice and documented application

TSK-000832 · Action
Line 2 Pasteurizer Upgrades

Data Analytics, BI, and Operational Reporting
Engineering practice and documented application

Data Analytics, BI, and Operational Reporting
Engineering practice and documented application

Bottling and Packaging Line Integration
Engineering practice and documented application

TSK-000834 · Action
Line 2 Pasteurizer Upgrades

Instrumentation, Measurement, and Standards
Engineering practice and documented application

Instrumentation, Measurement, and Standards
Engineering practice and documented application

TSK-000833 · Action
Line 2 Pasteurizer Upgrades

Pasteurization and Thermal-Process Controls
Engineering practice and documented application

Pasteurization and Thermal-Process Controls
Engineering practice and documented application

Pasteurization and Thermal-Process Controls
Engineering practice and documented application

Pasteurization and Thermal-Process Controls
Engineering practice and documented application

Pasteurization and Thermal-Process Controls
Engineering practice and documented application

Pasteurization and Thermal-Process Controls
Engineering practice and documented application

TSK-000120 · Action
Line 2 Pasteurizer and Hot Water Set Rebuild
Recorded application
TSK-000126 · Action
Line 2 Pasteurizer and Hot Water Set Rebuild
Recorded application
TSK-000127 · Method
Line 2 Pasteurizer and Hot Water Set Rebuild
Recorded application
TSK-000141 · Technical context
Line 2 Pasteurizer Upgrades

TSK-000832 · Action
Line 2 Pasteurizer Upgrades
Coordinated fillers, cappers, pasteurizers, conveyors and packaging equipment with line layouts, utility connections and controls. Format changes included bottle and closure geometry, molds, change parts, sourcing and changeover readiness. Production flow, sanitation, safety and startup requirements shaped the complete line scope.

Bottling and Packaging Line Integration
Engineering practice and documented application

Hot-water set rebuild and automation upgrades; Regulatory-compliance and thermal-stability objective
PRJ-A-002 | Line 2 Pasteurizer Upgrades | classification ASEPTIC_OR_HYGIENIC_PRODUCT_PROCESSING
Assess thermal-control performance using QA and food-safety checks, pasteurization verification, alarm histories and temperature trends against the required operating band.
Delivery / Execution.
Capital authorization, roadmap sequencing, construction coordination, QA/QC, commissioning planning and technical turnover documentation.

TSK-000120 · Action
Line 2 Pasteurizer and Hot Water Set Rebuild

TSK-000126 · Action
Line 2 Pasteurizer and Hot Water Set Rebuild

TSK-000127 · Method
Line 2 Pasteurizer and Hot Water Set Rebuild

TSK-000141 · Technical context
Line 2 Pasteurizer Upgrades

TSK-000832 · Action
Line 2 Pasteurizer Upgrades

TSK-000833 · Action
Line 2 Pasteurizer Upgrades

TSK-000834 · Action
Line 2 Pasteurizer Upgrades
Workstream Portfolio Rollup
28,095,000 USD
Production and Packaging Modernization
Recorded workstream portfolio reference. This is the workstream-level value and is not a project expenditure or a new total of reassigned projects.
| Measure or outcome | Value or result | Meaning and operating scope |
|---|---|---|
| Recorded outcome | The engineering study compared an 80-ft existing hold tube with a 171-ft required length at a 115 GPM design rate. | Line 2 Pasteurizer Upgrades |
| Recorded outcome | Restoration of compliance and thermal stability was the project objective; final acceptance is not stated. | Line 2 Pasteurizer Upgrades |
CASE-059 · Engineering case
Diagnosed and scoped a Line 2 pasteurizer rebuild to restore thermal control, divert logic, safety interlocks, and regulatory readiness.
Read the Case ↗CASE-067 · Engineering case
Developed a pasteurizer and hot-water-set upgrade scope to address thermal stability, automation and compliance requirements.
Read the Case ↗