TSK-000858 · Action
Developed Operating and Preventive-Maintenance Follow-Up, Modular Expansion and Clean-Water-Flux Tracking
Explore the capability, case, and equipment connections for this activity.

Roles & Contributions
Maintenance Team
Maintenance Participation
Project coordination
PM requirements, CIP logs, gasket schedules and repair requests were defined for ceramic-filter follow-up.
Project Context
PRJ-A-010 · Ceramic Crossflow Filter System + Ion Exchange Trial ↗Capabilities
- Apply Root-Cause and Corrective-Action MethodsRecorded application
Why these connect
The source model links this activity to the capability.
- Develop Operating and Maintenance ProceduresRecorded application
Why these connect
The source model links this activity to the capability.
- Review Mechanical Condition and Preventive MaintenanceRecorded application
Why these connect
The source model links this activity to the capability.
- Structure Process-Improvement and Control MethodsRecorded application
Why these connect
The source model links this activity to the capability.
All Portfolio Connections
All portfolio connections (8)
- Lean Six Sigma, Quality Systems, and Governance Maturity — Application Review Review artifact
- Reliability, Maintenance, and Operational Support — Application Review Review artifact
- Apply Root-Cause and Corrective-Action Methods Recorded application
- Develop Operating and Maintenance Procedures Recorded application
- Review Mechanical Condition and Preventive Maintenance Recorded application
- Structure Process-Improvement and Control Methods Recorded application
- Developed Operating and Preventive-Maintenance Follow-Up, Modular Expansion and Clean-Water-Flux Tracking ↗ Existing portfolio connection
- Ceramic Crossflow Filter System + Ion Exchange Trial Existing portfolio connection
Project Ownership and Delivery Context
Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.
Compared filtration options against demand and lifecycle requirements, integrated CIP and instrumentation with dedicated electrical feeds, and developed clean-water-flux tracking and maintenance follow-up. Ion-exchange testing extended the investigation into product clarity and quality, while modular expansion planning connected the equipment choice with future operating demand.
Related Analysis and Application Artifacts
- Lean Six Sigma, Quality Systems, and Governance Maturity — Application ReviewCapability application review
- Reliability, Maintenance, and Operational Support — Application ReviewCapability application review