TSK-000063 · Method
Preventive-Maintenance and CIP Follow-Up Requirements
Ceramic-Filter SOP, Preventive-Maintenance and CIP Audit
APOLLO AUTOMATIONJAMES WARREN · ENGINEERING & PROJECT LEADERSHIPCAP-0096 · Engineering practice
Ventilation, Control Rooms, and Equipment Protection

Technical Systems Ownership · Ventilation, control rooms, and equipment protection

TSK-000063 · Method
Ceramic-Filter SOP, Preventive-Maintenance and CIP Audit
Facility work covered enclosure rehabilitation, ventilation, drainage, erosion control and electrical-room protection. Scopes brought together access, scaffolding, structural and civil interfaces, weather barriers, ductwork, fans, electrical feeds and interlocks. Coordinated the disciplines around the operating needs of the facility.