CASE-012 · Engineering case

Acetator #6 and ACV Filtering Expansion

Led engineering coordination for acetator and filtering expansion intended to increase local vinegar availability and reduce routine inter-plant shipments.

Conceptual engineering visualization: Acetator #6 and ACV Filtering Expansion
Conceptual engineering visualization · AI generated

Why the Work Mattered

Purpose and Operating Need

Reduce inter-plant transportation costs by an estimated $1.3M annually through elimination of routine inter-plant shipments for additional WDV supply.

Engineering Approach

Engineering Approach

Engineering scope: Acetator capacity expansion, wine centrifuge clarification, ceramic vinegar polishing, truck batch loadout coordination.

Outcome & Engineering Context

Outcome and Context

The plan estimated approximately $1.3M/year in transportation-cost reduction. The local-production basis was approximately 0.5M gallons/year; these are planned benefits rather than accepted operating savings.

Workstream Results & Impact

Workstream Portfolio Rollup

66,885,000 USD

Vinegar Acetation and Fermentation-Support Modernization

Recorded workstream portfolio reference. This is the workstream-level value and is not a project expenditure or a new total of reassigned projects.

Measures & Operating Detail

Engineering scope and design basis

Project scope and individual work packages are presented separately; project totals are not additive to their component values.

1 detail rows; 2,359 K project-family value.

Actions, Methods & Controls

ACTIVITIES IN CONTEXT

Additional Technical Detail

Roles & contributions
  • Project Ownership

    Full lifecycle project ownership

    Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.

  • Engineering and Plant Teams

    Project coordination

    Project coordination

    Engineering equipment supply, contractor installation and engineering/plant commissioning were separately assigned in the expansion plan.

  • Installation Contractors

    Project coordination

    Project coordination

    Contractor installation was a separately assigned part of the expansion plan.

Workstream context
Additional technical detail
Explore 1 detail record
  • Planned installation sequence

    The acetator #6 and ACV filtering schedule sequences support-equipment, piping and electrical ordering ahead of mechanical/electrical installation and the 50,000-gallon tank installation.

All portfolio connections
All portfolio connections (21)
Project ownership and delivery context

Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.

Aligned the acetator scope with wine clarification, ceramic polishing and truck-batch loadout. Developed the transportation business case alongside the process capacity requirements, making production flow and logistics part of the same capital decision.

Related analysis and application artifacts
Connected collections

WHAT COMES NEXT

Complex Challenge?
Let’s Work Through It.

Engineering leadership, capital projects, and independent consulting.