WORK CONTEXT
Winery Centrifuge Electrical Prep and Utility Coordination
Follow the connected work in the portfolio.

Connected Work
All portfolio connections (4)
- Winery Centrifuge Electrical Prep and Utility Coordinationdescribed byWinery Centrifuge Electrical Prep and Utility Coordination ↗
- Winery Centrifuge Electrical Prep and Utility Coordinationincludes taskBrew 250 Electrical and Utility Preparation ↗
- Winery Centrifuge Electrical Prep and Utility Coordinationincludes taskCoordinated Electrical Installation, Transformer Sizing, Plant Hose/Hardware Preparation, CIP Chemical Setup and Utility Tie-Ins; Planned Future Hard Piping ↗
- Winery Centrifuge and CIP Interface Engineering + Vinegar Transfer Centrifuge Loopincludes workWinery Centrifuge Electrical Prep and Utility Coordination ↗