WORK CONTEXT
Lines 1 & 2 Facility and Sanitary Infrastructure
Follow the connected work in the portfolio.

Connected Work
All portfolio connections (3)
- Lines 1 & 2 Facility and Sanitary Infrastructuredescribed byLines 1 & 2 Facility and Sanitary Infrastructure ↗
- Lines 1 & 2 Facility and Sanitary Infrastructureincludes taskScoped Flooring, Drainage, Wall Separation, Lighting, Ventilation, Safety Walkways, Bollards, Railings, Dock Changes, and Warehouse Layout Revisions. ↗
- Lines 1 & 2 Bottling and Packaging Linesincludes workLines 1 & 2 Facility and Sanitary Infrastructure ↗
