Line 1 Pasteurizer Repair Option Study
Follow the connected work in the portfolio.

Connected Work
All portfolio connections (5)
- Line 1 Pasteurizer Repair Option Studydescribed byLine 1 Pasteurizer Repair Option Study ↗
- Line 1 Pasteurizer Repair Option Studyincludes taskScope Includes Three Valves, Two Class VI Shutoff Valves and One Class IV FCV, Piping Rework, UDC Coordination, Commissioning, and Verification of Steam Shutdown Logic ↗
- Line 1 Pasteurizer Repair Option Studyincludes taskCompleted the Option Study and Selected Full Repair; Specified Steam-Control/Shutoff-Valve Replacement, UDC Coordination, Commissioning and Steam-Shutdown Verification ↗
- Line 1 Pasteurizer Repair Option Studyincludes taskSustainability Basis: Replacing Leaking/Inefficient Steam Control and Restoring Reliable Thermal Control Reduces Energy Waste, CO2 Impact, and Repeated Pump/Seal Replacement Waste ↗