TSK-000133 · Action

Scope Includes Three Valves, Two Class VI Shutoff Valves and One Class IV FCV, Piping Rework, UDC Coordination, Commissioning, and Verification of Steam Shutdown Logic

Explore the capability, case, and equipment connections for this activity.

Conceptual engineering illustration: shutdown cutover
Conceptual engineering visualization · AI generated

Case Context

Line 1 Pasteurizer Repair Option Study ↗

Project Context

PRJ-A-003 · Line 1 Pasteurizer Repair ↗

Capabilities

Systems & Equipment

All Portfolio Connections

All portfolio connections (7)

Project Ownership and Delivery Context

Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.

Investigated valve alternatives, defined the repair boundary with operations and maintenance, and led the steam-control repair. Commissioning checks included steam shutdown behavior, connecting valve selection and control response to dependable pasteurizer operation.