TSK-000126 · Action

Pasteurizer Controls and Hygienic-Process Upgrade Scope

Explore the capability, case, and equipment connections for this activity.

Conceptual engineering illustration: cleaning sanitation
Conceptual engineering visualization · AI generated

Activity Detail

Scoped FDV01 divert valve, FCV01/02 temperature valves, flowmeter, RTDs, VFD-controlled pumps, chart recorder validation, high-temp cutout, auto shutdown, PLC/HMI coordination, hot-water set redesign, kosher CIP compatibility, 210 F / 3-hour CIP hold, product recovery/air-blow future path, filler return strategy, and chart recorder calibration/restoration.

Case Context

Line 2 Pasteurizer and Hot Water Set Rebuild ↗

Project Context

PRJ-A-002 · Line 2 Pasteurizer Upgrades ↗

Capabilities

Systems & Equipment

All Portfolio Connections

All portfolio connections (13)

Project Ownership and Delivery Context

Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.

Reviewed hold-tube length, process flow and thermal-control requirements, translated those requirements into the upgrade scope, and coordinated production, quality and utility interfaces. The delivery approach connected the design basis with controls verification and operating readiness.