
TSK-000134 · Method
Completed the Option Study and Selected Full Repair; Specified Steam-Control/Shutoff-Valve Replacement, UDC Coordination, Commissioning and Steam-Shutdown Verification
Line 1 Pasteurizer Repair Option Study
Recorded application
APOLLO AUTOMATIONJAMES WARREN · ENGINEERING & PROJECT LEADERSHIPCAP-0207 · Engineering practice
Pasteurization and Thermal-Process Controls

Technical Systems Ownership · Pasteurization and thermal-process controls

TSK-000134 · Method
Line 1 Pasteurizer Repair Option Study
Recorded application
TSK-000835 · Action
Line 1 Pasteurizer Repair

TSK-000837 · Action
Line 1 Pasteurizer Repair

TSK-000140 · Technical context
Line 1 Pasteurizer Repair

TSK-000126 · Action
Line 2 Pasteurizer and Hot Water Set Rebuild
Recorded application
TSK-000127 · Method
Line 2 Pasteurizer and Hot Water Set Rebuild
Recorded application
TSK-000133 · Action
Line 1 Pasteurizer Repair Option Study
Recorded applicationCoordinated fillers, cappers, pasteurizers, conveyors and packaging equipment with line layouts, utility connections and controls. Format changes included bottle and closure geometry, molds, change parts, sourcing and changeover readiness. Production flow, sanitation, safety and startup requirements shaped the complete line scope.