Designed electrical lighting and utility needs for the 22 ft x 28 ft x 20 ft CMU boiler room, branch circuit sizing, 250A 230V and 125A 120V feeders from primary switchgear to new panelboards, LMV51 burner management coordination, FDW system control panel, blower motor with VFD, I/O checkout, BMS commissioning, instrumentation calibration, P&IDs, PFD, instrument list, control narrative, electrical power plan, and 3D room scan.

Case Context

Production Boiler Electrical and Controls Coordination ↗

Project Context

PRJ-A-018 · Boiler System + Plant Steam & Condensate Optimization ↗

Capabilities

Systems & Equipment

Suppliers & Technical Platforms

All Portfolio Connections

All portfolio connections (16)

Project Ownership and Delivery Context

Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.

Coordinated boiler-room equipment, electrical and controls interfaces with steam-manifold and pressure-reduction improvements. Condensate recovery, control checkout and operating readiness were part of the same system scope. The work increased available steam capacity by about 25 percent and stabilized jacket pressure.