TSK-000222 · Method
Built BTU/Hr and GPM / Delta T Models, Evaluated Chiller Energy Performance, and Compared Do-Nothing, Repair, and Replacement Options
Explore the capability, case, and equipment connections for this activity.

Case Context
Cooling Load Modeling and Thermal Deficit Analysis ↗Capabilities
- Compare Repair, Replacement and Deferred ExpansionRecorded application
Why these connect
The source model links this activity to the capability.
- Evaluate Cooling Reliability and Standby CapacityRecorded application
Why these connect
The source model links this activity to the capability.
- Model Cooling Duty and Hydraulic DemandRecorded application
Why these connect
The source model links this activity to the capability.
Systems & Equipment
All Portfolio Connections
All portfolio connections (8)
- Chillers, Cooling Towers, and Process Cooling — Application Review Review artifact
- Investment Economics and Lifecycle Analysis — Application Review Review artifact
- Compare Repair, Replacement and Deferred Expansion Recorded application
- Evaluate Cooling Reliability and Standby Capacity Recorded application
- Model Cooling Duty and Hydraulic Demand Recorded application
- Built BTU/Hr and GPM / Delta T Models, Evaluated Chiller Energy Performance, and Compared Do-Nothing, Repair, and Replacement Options ↗ Existing portfolio connection
- Process Cooling ↗ Existing portfolio connection
- Cooling Load Modeling and Thermal Deficit Analysis Existing portfolio connection
Project Ownership and Delivery Context
Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.
modeled demand and the roughly 78-ton peak thermal deficit, coordinated pumps and recirculation, and developed chiller staging and runtime balancing. Operating visibility and process-load monitoring connected the three 160-ton production chillers with the way the plant used cooling capacity.
Related Analysis and Application Artifacts
- Chillers, Cooling Towers, and Process Cooling — Application ReviewCapability application review
- Investment Economics and Lifecycle Analysis — Application ReviewCapability application review