TSK-000234 · Action

Chiller Controls and Operating-Sequence Review

Explore the capability, case, and equipment connections for this activity.

Conceptual engineering illustration: project controls
Conceptual engineering visualization · AI generated

Activity Detail

Reviewed plenum-rated control wiring, 120V circuit isolation, terminal protection, BAS proposal, flowrate, temperature differential, compressor runtime, fan speeds, runtime balancing, safety interlocks, maintenance scheduling, and auto-staging logic.

Case Context

Chiller Plant Electrical and BAS Coordination ↗

Project Context

PRJ-A-021 · Production-Cooling Upgrade with Three 160-Ton Chillers ↗

Capabilities

All Portfolio Connections

All portfolio connections (6)

Project Ownership and Delivery Context

Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.

modeled demand and the roughly 78-ton peak thermal deficit, coordinated pumps and recirculation, and developed chiller staging and runtime balancing. Operating visibility and process-load monitoring connected the three 160-ton production chillers with the way the plant used cooling capacity.