TSK-000336 · Action
Site-Access, Drainage, Landscaping and Traffic-Control Scope
Explore the capability, case, and equipment connections for this activity.

Activity Detail
Scoped survey layout, demolition, storm protection, 1,350 LF curbing, ADA parking, 45 parking stops, grading, spillway preparation, Bahia sod, 455 LF shrubs, striping removal, ADA stalls, access markings, regulatory signs, no-truck / no-parking signage, speed signage, and DOT-approved solar signs.
Case Context
Site Enhancement Initiative ↗Project Context
PRJ-A-033 · Drainage and Erosion-Control Project Overview ↗Capabilities
- Coordinate Landscaping and Site RestorationRecorded application
Why these connect
The source model links this activity to the capability.
- Coordinate Vehicle Access and Pedestrian ProtectionRecorded application
Why these connect
The source model links this activity to the capability.
- Plan Siteworks and Underground Utility InterfacesRecorded application
Why these connect
The source model links this activity to the capability.
- Plan Traffic Markings and Site ControlsRecorded application
Why these connect
The source model links this activity to the capability.
All Portfolio Connections
All portfolio connections (10)
- Civil, Structural, Concrete, and Site Engineering — Application Review Review artifact
- Site Access, Traffic, and Exterior Improvements — Application Review Review artifact
- Coordinate Landscaping and Site Restoration Recorded application
- Coordinate Vehicle Access and Pedestrian Protection Recorded application
- Plan Siteworks and Underground Utility Interfaces Recorded application
- Plan Traffic Markings and Site Controls Recorded application
- Calculated Landscaping Quantities, Soil and Pallet Requirements, Shrubs, Watering Demand, Reuse-Rock Coverage, Cost Ranges and Schedule Sequencing for Site-Enhancement Planning Shared case
- Site-Access, Drainage, Landscaping and Traffic-Control Scope ↗ Existing portfolio connection
- Drainage and Erosion-Control Project Overview Existing portfolio connection
- Site Enhancement Initiative Existing portfolio connection
Project Ownership and Delivery Context
Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.
Developed the reinforced channel, debris screens, five-step weir, outlet basin and stabilization scope. Curbing, grading, landscaping and wastewater-collection interfaces were coordinated with the work. The system reduced sediment carry by more than 90 percent while providing a maintainable runoff path.
Related Analysis and Application Artifacts
- Civil, Structural, Concrete, and Site Engineering — Application ReviewCapability application review
- Site Access, Traffic, and Exterior Improvements — Application ReviewCapability application review