TSK-000336 · Action

Site-Access, Drainage, Landscaping and Traffic-Control Scope

Explore the capability, case, and equipment connections for this activity.

Conceptual engineering illustration: enabling civil works
Conceptual engineering visualization · AI generated

Activity Detail

Scoped survey layout, demolition, storm protection, 1,350 LF curbing, ADA parking, 45 parking stops, grading, spillway preparation, Bahia sod, 455 LF shrubs, striping removal, ADA stalls, access markings, regulatory signs, no-truck / no-parking signage, speed signage, and DOT-approved solar signs.

Case Context

Site Enhancement Initiative ↗

Project Context

PRJ-A-033 · Drainage and Erosion-Control Project Overview ↗

Capabilities

All Portfolio Connections

All portfolio connections (10)

Project Ownership and Delivery Context

Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.

Developed the reinforced channel, debris screens, five-step weir, outlet basin and stabilization scope. Curbing, grading, landscaping and wastewater-collection interfaces were coordinated with the work. The system reduced sediment carry by more than 90 percent while providing a maintainable runoff path.