TSK-000863 · Action
Addressed Membrane Protection and Wastewater BOD/Total-Waste Drivers
Explore the capability, case, and equipment connections for this activity.

Project Context
PRJ-A-012 · Centrifuge Installation and Interface Engineering ↗Capabilities
- Analyze Fouling, Cleaning and Membrane PerformanceRecorded application
Why these connect
The source model links this activity to the capability.
- Evaluate Wastewater Loads and Recovery AlternativesRecorded application
Why these connect
The source model links this activity to the capability.
- Integrate Ceramic Filtration and Automated RoutingRecorded application
Why these connect
The source model links this activity to the capability.
- Plan Representative Effluent SamplingRecorded application
Why these connect
The source model links this activity to the capability.
Systems & Equipment
All Portfolio Connections
All portfolio connections (9)
- Ceramic Filtration, Membranes, and Polishing — Application Review Review artifact
- Wastewater, Environmental Compliance, and VOC Control — Application Review Review artifact
- Analyze Fouling, Cleaning and Membrane Performance Recorded application
- Evaluate Wastewater Loads and Recovery Alternatives Recorded application
- Integrate Ceramic Filtration and Automated Routing Recorded application
- Plan Representative Effluent Sampling Recorded application
- Addressed Membrane Protection and Wastewater BOD/Total-Waste Drivers ↗ Existing portfolio connection
- Wastewater ↗ Existing portfolio connection
- Centrifuge Installation and Interface Engineering Existing portfolio connection
Project Ownership and Delivery Context
Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.
Aligned skid utilities, electrical supply and process connections, and coordinated supplier startup and operator training. The resulting recovery of approximately 104,000 gallons per year connected separation engineering with usable product yield and reduced loss to the wastewater stream.
Related Analysis and Application Artifacts
- Ceramic Filtration, Membranes, and Polishing — Application ReviewCapability application review
- Wastewater, Environmental Compliance, and VOC Control — Application ReviewCapability application review