Evaluated Throughput Against the Documented 40 GPM Target

Explore the capability, case, and equipment connections for this activity.

Conceptual engineering illustration: experimental design
Conceptual engineering visualization · AI generated

Project Context

PRJ-A-014 · Wine Pre-Filtration Trial and Downstream Throughput Evaluation ↗

Capabilities

All Portfolio Connections

All portfolio connections (6)

Project Ownership and Delivery Context

Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.

Evaluated centrifuge pre-filtration against downstream performance and the 40 GPM operating target. The evaluation showed a roughly seven-hour production filtration cycle, providing a practical basis for comparing separation methods and their effect on the production schedule.