Captured a Complete Ceramic-CIP Waste Stream, Organized Repeated Multi-Point Sampling, and Coordinated the Wastewater Receiver, Internal Stakeholders, Filtration Supplier and Laboratories

Explore the capability, case, and equipment connections for this activity.

Conceptual engineering illustration: statistical process quality
Conceptual engineering visualization · AI generated

Roles & Contributions

Case Context

Ceramic Filter CIP Interface Engineering ↗

Project Context

PRJ-A-010 · Ceramic Crossflow Filter System + Ion Exchange Trial ↗

Capabilities

Measures & Operating Context

MeasureValueType & meaningAttribution & operating context
CIP Flush Volumeapproximately 6,000 galObservation
Field observation

Applies to: Captured a complete ceramic-CIP waste stream, organized repeated multi-point sampling, and coordinated the wastewater receiver, internal stakeholders, filtration supplier and laboratories

Ceramic-CIP flush — CIP flush volume — Ceramic-CIP flush

Wastewater Flow30,000 to 40,000 GPDObservation
Field observation

Applies to: Captured a complete ceramic-CIP waste stream, organized repeated multi-point sampling, and coordinated the wastewater receiver, internal stakeholders, filtration supplier and laboratories

Contemporaneous plant sampling — Wastewater flow — Contemporaneous plant sampling

pH2 to 3 pH unitsObservation
Field observation

Applies to: Captured a complete ceramic-CIP waste stream, organized repeated multi-point sampling, and coordinated the wastewater receiver, internal stakeholders, filtration supplier and laboratories

Contemporaneous plant sampling — pH — Contemporaneous plant sampling

Sodium Concentration189 ppmObservation
Field observation

Applies to: Captured a complete ceramic-CIP waste stream, organized repeated multi-point sampling, and coordinated the wastewater receiver, internal stakeholders, filtration supplier and laboratories

Contemporaneous plant sampling — Sodium concentration — Contemporaneous plant sampling

All Portfolio Connections

All portfolio connections (10)

Project Ownership and Delivery Context

Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.

Compared filtration options against demand and lifecycle requirements, integrated CIP and instrumentation with dedicated electrical feeds, and developed clean-water-flux tracking and maintenance follow-up. Ion-exchange testing extended the investigation into product clarity and quality, while modular expansion planning connected the equipment choice with future operating demand.