TSK-001039 · Engineering analysis

Used AI-Assisted Comparison of Field Observations and Managed-Switch Configuration to Detect Port-State and Labeling Discrepancies and Prepare a Staged Configuration Baseline

Explore the capability, case, and equipment connections for this activity.

Conceptual engineering illustration: configuration governance
Conceptual engineering visualization · AI generated

Roles & Contributions

Case Context

OT Switch Configuration, Cutover and Troubleshooting ↗

Project Context

PRJ-A-028 · Fiberoptic OT Network ↗

Capabilities

Portfolio Artifact Connections

Measures & Operating Context

MeasureValueType & meaningAttribution & operating context
VLAN Definitions5 VLANsScope or Inventory Quantity
Configuration scope

Applies to: Used AI-assisted comparison of field observations and managed-switch configuration to detect port-state and labeling discrepancies and prepare a staged configuration baseline

LAL-23 staged baseline — VLAN definitions — LAL-23 staged baseline

Access-Port Definitions8 portsScope or Inventory Quantity
Configuration scope

Applies to: Used AI-assisted comparison of field observations and managed-switch configuration to detect port-state and labeling discrepancies and prepare a staged configuration baseline

LAL-23 staged baseline — Access-port definitions — LAL-23 staged baseline

Independent Trunk Definitions2 trunksScope or Inventory Quantity
Configuration scope

Applies to: Used AI-assisted comparison of field observations and managed-switch configuration to detect port-state and labeling discrepancies and prepare a staged configuration baseline

LAL-23 staged baseline — Independent trunk definitions — LAL-23 staged baseline

All Portfolio Connections

All portfolio connections (11)

Project Ownership and Delivery Context

Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.

Developed the fiber and managed-switch architecture, resilient power arrangements, configuration and rollback requirements, and cutover sequence. Network drawings, device labeling and validation connected the installation with operator and maintenance needs. The work included a 10 Gbps backbone and 13 UPS-backed resilience points.