TSK-000104 · Method
Developed Itemized CapEx Across Civil, Mechanical, Electrical, Controls, OEM Equipment, Installation, Startup/Training, Contingency, Tax, and Freight
Lines 1 and 2 Capital-Budget and AFE Development
APOLLO AUTOMATIONJAMES WARREN · ENGINEERING & PROJECT LEADERSHIPCAP-0026 · Engineering practice
Estimating, Financial Control, and Expense Traceability

Project Delivery & Execution · Estimating, financial control, and expense traceability

TSK-000104 · Method
Lines 1 and 2 Capital-Budget and AFE Development

TSK-000060 · Action
Phase 1 1000A Service Quote and DP-PKG Feeder Quote Structure
Owns the full lifecycle of capital projects, connecting safety, reliability, capacity, compliance and business impact with technical scope and execution. Capital planning includes need definition, feasibility, prioritization, AFE development, procurement, construction, commissioning, turnover and post-startup support. Funding decisions are informed by operating requirements, alternatives, interfaces and the resources needed to deliver a usable system.
Field inspections, loop checks, interlock tests and performance verification connect installation quality with the design basis. Turnover brings together as-built information, operating and maintenance documentation, training, punch-list closure and maintenance ownership. Post-startup support closes the loop between equipment acceptance and stable operation.