PARTICIPANT
IT Team
Follow the connected work in the portfolio.

Contributions Across the Portfolio
Programmed Switches, Executed IP Migration, and Performed Lab and Live Transition Validation with IT
IT Coordination
Team Contribution
Participated in lab validation, live network transition and engineering-network handoff.
Capital Project Execution, Network Infrastructure Engineering, AFE Development, Vendor Selection and Technical Specifications, Cross-Functional Coordination with IT and Controls, Testing and Validation
IT Coordination
Team Contribution
Coordinated engineering-network interfaces, testing and handoff with engineering and controls.
Used Distribution Switches Distribution Switches, Managed Access Switches Managed Access Switches, Dual SFP Uplinks, LACP / Port-Channel Planning, VLAN Segmentation, IEEE 802.1Q Tagging, Inter-VLAN SVI Validation, Redundant Star Topology, Lab Programming, Live IP Migration, NEMA 4X Stainless IDF Enclosures, Armored OM3 50/125 Fiber, UPS-Backed Switches, and IT Handoff Testing
IT Coordination
Team Contribution
Participated in OT-network handoff testing for switch, VLAN and live-migration interfaces.
Used Staged AFEs, Vendor Selection, Fiber Contractor Qualification, Lab Configuration, Live Cutover, LACP Uplink Planning, VLAN/IP Migration, and Validation with IT
IT Coordination
Team Contribution
Participated in VLAN/IP migration and live-cutover validation.
Controls, Automation, and OT Network Transformation
Project Team Contribution
Team Contribution
IT participated in lab/live transition validation and the controls-network cutover interface.
Fiberoptic OT Network Phase 1 and Phase 2, Configuration and Cutover Execution
Project Team Contribution
Team Contribution
IT participated in lab/live transition validation and the controls-network cutover interface.
Fiberoptic OT Network Phase 1 and Phase 2 Execution
Project Team Contribution
Team Contribution
IT participated in lab/live transition validation and the controls-network cutover interface.
Fiberoptic OT Network
Project Team Contribution
Team Contribution
IT participated in lab/live transition validation and the controls-network cutover interface.