TSK-000312 · Action

Industrial Ethernet Architecture and Transition Validation

Explore the capability, case, and equipment connections for this activity.

Conceptual engineering illustration: industrial network
Conceptual engineering visualization · AI generated

Roles & Contributions

Activity Detail

Used distribution switches distribution switches, managed access switches managed access switches, dual SFP uplinks, LACP / Port-Channel planning, VLAN segmentation, IEEE 802.1Q tagging, inter-VLAN SVI validation, redundant star topology, lab programming, live IP migration, NEMA 4X stainless IDF enclosures, armored OM3 50/125 fiber, UPS-backed switches, and IT handoff testing.

Case Context

Fiberoptic OT Network Phase 1 and Phase 2, Configuration and Cutover Execution ↗

Project Context

PRJ-A-028 · Fiberoptic OT Network ↗

Capabilities

Systems & Equipment

Suppliers & Technical Platforms

All Portfolio Connections

All portfolio connections (19)

Project Ownership and Delivery Context

Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.

Developed the fiber and managed-switch architecture, resilient power arrangements, configuration and rollback requirements, and cutover sequence. Network drawings, device labeling and validation connected the installation with operator and maintenance needs. The work included a 10 Gbps backbone and 13 UPS-backed resilience points.

Related Analysis and Application Artifacts

WHAT COMES NEXT

Complex Challenge?
Let’s Work Through It.

Engineering leadership, capital projects, and independent consulting.

Start a conversation ↗