Production-Cooling Upgrade with Three 160-Ton Chillers
Follow the connected work in the portfolio.

Connected Work
All portfolio connections (3)
- Production-Cooling Upgrade with Three 160-Ton Chillersdescribed byProduction-Cooling Upgrade with Three 160-Ton Chillers ↗
- Production-Cooling Upgrade with Three 160-Ton Chillersincludes taskChillers, Building Controls, Ozone Treatment and Power ↗
- Production-Cooling Upgrade with Three 160-Ton Chillersincludes workProduction-Cooling Upgrade with Three 160-Ton Chillers ↗