Owned the full lifecycle of this project, connecting capital planning, engineering, delivery and operating readiness. A supplier-driven bottle change affected more than the container itself. Mold availability, neck support, bottle handling and capper geometry all had to be ready together to protect continuing production.

Workstream: Production and Packaging Modernization
A supplier-driven bottle change affected more than the container itself. Mold availability, neck support, bottle handling and capper geometry all had to be ready together to protect continuing production.
Managed mold sourcing and lead times, aligned the change parts with the 28 mm finish, and planned changeover readiness across procurement, product development and operations. The project connected packaging availability with the physical interfaces needed to run the replacement bottle.
Protected packaged product continuity for mixer bottle SKUs, supporting the ability to maintain $2M in sales and 30,000 cases.
Bottle Mold Sourcing and Lead Time Management, Change-Part Engineering for Bottle Handling and Neck Support, Capper and Closure Change-Part Coordination, Packaging Line Changeover Planning
Full lifecycle project ownership
Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.
AFE Project Lead
Named Project Responsibility
Named project lead for the 750 mL and 1 L bottle-conversion AFE.
Full lifecycle project ownership
Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.
AFE Business Owner
Named Project Responsibility
Named business owner for the bottle-conversion AFE.
Supplier Named in AFE Estimate
Supplier Reference
Listed supplier for change-part and commissioning estimates for the bottle conversion.
Supplier Named in AFE Estimate
Supplier Reference
Listed supplier for blow-mold estimate for the bottle conversion.

Capital Strategy and Business Alignment
Engineering practice and documented application

Project Lifecycle, FEL, and Execution Models
Engineering practice and documented application

Action
Applies capabilities

Scheduling, Shutdowns, and Execution Sequencing
Engineering practice and documented application

Scheduling, Shutdowns, and Execution Sequencing
Engineering practice and documented application

TSK-000838 · Action
Line 1 Mixer Bottle Conversion to 28 mm PCO
Recorded application
TSK-000840 · Action
Line 1 Mixer Bottle Conversion to 28 mm PCO
Recorded application
Scheduling, Shutdowns, and Execution Sequencing
Engineering practice and documented application

Scheduling, Shutdowns, and Execution Sequencing
Engineering practice and documented application

TSK-000838 · Action
Line 1 Mixer Bottle Conversion to 28 mm PCO
Recorded application
TSK-000840 · Action
Line 1 Mixer Bottle Conversion to 28 mm PCO
Recorded applicationOwned capital planning and the full delivery lifecycle. The cards connect the applicable responsibilities with the recorded work.

Capital Strategy and Business Alignment
Engineering practice and documented application

Project Lifecycle, FEL, and Execution Models
Engineering practice and documented application

Scheduling, Shutdowns, and Execution Sequencing
Engineering practice and documented application

Scheduling, Shutdowns, and Execution Sequencing
Engineering practice and documented application



Action
Applies capabilities

Statistical Quality, Measurement Systems, and Sampling
Academic preparation and analytical method

Optimization and Operations Research
Academic preparation and analytical method

Forecasting, Inventory, Supply Chain, and Logistics
Academic preparation and analytical method

Forecasting, Inventory, Supply Chain, and Logistics
Academic preparation and analytical method

Forecasting, Inventory, Supply Chain, and Logistics
Academic preparation and analytical method

Forecasting, Inventory, Supply Chain, and Logistics
Academic preparation and analytical method

Forecasting, Inventory, Supply Chain, and Logistics
Academic preparation and analytical method

Forecasting, Inventory, Supply Chain, and Logistics
Engineering practice and documented application

TSK-000981 · Academic analytical method

TSK-000982 · Academic analytical method

Stochastic Models and Uncertainty Analytics
Academic preparation and analytical method

Optimization and Operations Research
Academic preparation and analytical method

Filling, Capping, Closures, and Packaging Conversion
Engineering practice and documented application

Filling, Capping, Closures, and Packaging Conversion
Engineering practice and documented application

Filling, Capping, Closures, and Packaging Conversion
Engineering practice and documented application

TSK-000139 · Technical context
Line 1 Mixer Bottle Conversion to 28 mm PCO

TSK-000838 · Action
Line 1 Mixer Bottle Conversion to 28 mm PCO
Recorded application
TSK-000839 · Action
Line 1 Mixer Bottle Conversion to 28 mm PCO
Recorded application
TSK-000840 · Action
Line 1 Mixer Bottle Conversion to 28 mm PCO
Recorded application
Estimate · Supplier estimate
Applies to: Coordinated the 28 mm PCO conversion through mold procurement, change parts, pick-plate and closure handling, bottle-format tooling and neck-support centering risks
Bottle conversion — PET mold change-part lead time — Bottle conversion
Coordinated fillers, cappers, pasteurizers, conveyors and packaging equipment with line layouts, utility connections and controls. Format changes included bottle and closure geometry, molds, change parts, sourcing and changeover readiness. Production flow, sanitation, safety and startup requirements shaped the complete line scope.

Filling, Capping, Closures, and Packaging Conversion
Engineering practice and documented application

Filling, Capping, Closures, and Packaging Conversion
Engineering practice and documented application

Filling, Capping, Closures, and Packaging Conversion
Engineering practice and documented application





Bottle mold, change parts, neck handling, capper/closure, labeling and changeover readiness; Protected approximately $2M in sales and 30,000 cases
PRJ-A-004 | Line 1 Mixer Bottle Conversion to 28 mm PCO | classification ASEPTIC_OR_HYGIENIC_PRODUCT_PROCESSING
Check supply continuity through affected-SKU schedules, customer-order fulfillment and sales records for the converted bottle family.
Delivery / Execution.
Capital authorization, roadmap sequencing, construction coordination, QA/QC, commissioning planning and technical turnover documentation.

TSK-000139 · Technical context
Line 1 Mixer Bottle Conversion to 28 mm PCO

TSK-000838 · Action
Line 1 Mixer Bottle Conversion to 28 mm PCO

TSK-000839 · Action
Line 1 Mixer Bottle Conversion to 28 mm PCO

TSK-000840 · Action
Line 1 Mixer Bottle Conversion to 28 mm PCO

TSK-001038 · Design scope
Line 1 Mixer Bottle Conversion to 28 mm PCO
Workstream Portfolio Rollup
28,095,000 USD
Production and Packaging Modernization
Recorded workstream portfolio reference. This is the workstream-level value and is not a project expenditure or a new total of reassigned projects.
| Measure or outcome | Value or result | Meaning and operating scope |
|---|---|---|
| Protected sales and product continuity | $2,000,000 in sales; 30,000 cases | Protected packaged-product continuity through mixer-bottle conversion; this value is protected revenue. |
| Recorded outcome | Supported continuity of approximately $2.0M in sales and 30,000 cases. | Line 1 Mixer Bottle Conversion to 28 mm PCO |
| Recorded outcome | The continuity result belongs to the mixer-bottle conversion. | Line 1 Mixer Bottle Conversion to 28 mm PCO |
CASE-065 · Engineering case
Coordinated the conversion of mixer-bottle SKUs to a 28 mm PCO finish, protecting packaged-product continuity.
Read the Case ↗