TSK-000321 · Method

Managed AFE, Vendor Selection, BOM, Drawings, Switch Programming, Electrical Feeds, Fiber Pulls, UPS Coordination, IP Migration, and Lab/Live Validation

Explore the capability, case, and equipment connections for this activity.

Conceptual engineering illustration: procurement logistics
Conceptual engineering visualization · AI generated

Case Context

Fiberoptic OT Network Phase 1 and Phase 2 Execution ↗

Project Context

PRJ-A-028 · Fiberoptic OT Network ↗

Capabilities

Systems & Equipment

All Portfolio Connections

All portfolio connections (16)

Project Ownership and Delivery Context

Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.

Developed the fiber and managed-switch architecture, resilient power arrangements, configuration and rollback requirements, and cutover sequence. Network drawings, device labeling and validation connected the installation with operator and maintenance needs. The work included a 10 Gbps backbone and 13 UPS-backed resilience points.

Related Analysis and Application Artifacts

WHAT COMES NEXT

Complex Challenge?
Let’s Work Through It.

Engineering leadership, capital projects, and independent consulting.

Start a conversation ↗