TSK-000321 · Method
Managed AFE, Vendor Selection, BOM, Drawings, Switch Programming, Electrical Feeds, Fiber Pulls, UPS Coordination, IP Migration, and Lab/Live Validation
Fiberoptic OT Network Phase 1 and Phase 2 Execution
Recorded application
APOLLO AUTOMATIONJAMES WARREN · ENGINEERING & PROJECT LEADERSHIPCAP-0302 · Engineering practice
OT Physical Architecture, Fiber, and Power Resilience

Technical Systems Ownership · OT physical architecture, fiber, and power resilience

TSK-000321 · Method
Fiberoptic OT Network Phase 1 and Phase 2 Execution
Recorded application
TSK-000320 · Action
Fiberoptic OT Network Phase 1 and Phase 2 Execution
Recorded application
TSK-000313 · Method
Fiberoptic OT Network Phase 1 and Phase 2, Configuration and Cutover Execution
Controls ownership connected PLC, HMI, VFD, remote-I/O and SCADA requirements with process behavior. OT work included a dedicated fiber backbone, managed switching, segmentation, redundant paths, UPS support, network drawings, device configuration and cutover validation. Instrumentation and alarm behavior were coordinated with operating and maintenance response.