TSK-000365 · Technical scope
Flared Transition to Weir
Explore the capability, case, and equipment connections for this activity.

Case Context
Drainage, Weir and Debris-Screen Design Details ↗Project Context
PRJ-A-033 · Drainage and Erosion-Control Project Overview ↗Capabilities
- Develop Weirs and Energy-Dissipation DetailsRecorded application
Why these connect
The source model links this activity to the capability.
- Size Drainage Conveyance and Roof InterfacesRecorded application
Why these connect
The source model links this activity to the capability.
All Portfolio Connections
All portfolio connections (6)
- Stormwater, Drainage, and Erosion Control — Application Review Review artifact
- Develop Weirs and Energy-Dissipation Details Recorded application
- Size Drainage Conveyance and Roof Interfaces Recorded application
- Flared Transition to Weir ↗ Existing portfolio connection
- Drainage and Erosion-Control Project Overview Existing portfolio connection
- Drainage, Weir, Debris Screen, Outlet Basin, and Phase 1 Remediation Existing portfolio connection
Project Ownership and Delivery Context
Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.
Developed the reinforced channel, debris screens, five-step weir, outlet basin and stabilization scope. Curbing, grading, landscaping and wastewater-collection interfaces were coordinated with the work. The system reduced sediment carry by more than 90 percent while providing a maintainable runoff path.
Related Analysis and Application Artifacts
- Stormwater, Drainage, and Erosion Control — Application ReviewCapability application review