
TSK-000180 · Technical scope
8 in 4500 PSI Slab
Boiler System Overhaul and Steam / Condensate Optimization
APOLLO AUTOMATIONJAMES WARREN · ENGINEERING & PROJECT LEADERSHIPCAP-0069 · Engineering practice
Civil, Structural, Concrete, and Site Engineering

Technical Systems Ownership · Civil, structural, concrete, and site engineering

TSK-000180 · Technical scope
Boiler System Overhaul and Steam / Condensate Optimization

TSK-000010 · Method
A5/A6 Acetator Expansion and VOC-Recovery Integration

TSK-000847 · Action
Acetator Expansion Project + VOC Scrubber Systems
Recorded application
TSK-000925 · Action
Drainage and Erosion-Control Project Overview
Recorded application
TSK-000012 · Method
Acetator Expansion Civil and Structural Foundations

TSK-000404 · Capital planning
Five-Year Capital Planning and Asset Lifecycle Roadmap
Recorded application
TSK-000929 · Action
Filtering-Room Acetator Electrical Control Room
Recorded application
TSK-000101 · Method
Lines 1 & 2 Facility and Sanitary Infrastructure
Facility work covered enclosure rehabilitation, ventilation, drainage, erosion control and electrical-room protection. Scopes brought together access, scaffolding, structural and civil interfaces, weather barriers, ductwork, fans, electrical feeds and interlocks. Coordinated the disciplines around the operating needs of the facility.