
TSK-000359 · Action
Added 4,375 Cf/Hr / 1.215 Cfs Design Runoff Basis at 6 in/Hr
Drainage, Weir and Debris-Screen Design Details
APOLLO AUTOMATIONJAMES WARREN · ENGINEERING & PROJECT LEADERSHIPCAP-0074 · Engineering practice
Stormwater, Drainage, and Erosion Control

Technical Systems Ownership · Stormwater, drainage, and erosion control

TSK-000359 · Action
Drainage, Weir and Debris-Screen Design Details

TSK-000056 · Action
Civil and Hydraulic Design Detail
Recorded application
TSK-000057 · Method
Civil and Hydraulic Design Detail
Recorded applicationFacility work covered enclosure rehabilitation, ventilation, drainage, erosion control and electrical-room protection. Scopes brought together access, scaffolding, structural and civil interfaces, weather barriers, ductwork, fans, electrical feeds and interlocks. Coordinated the disciplines around the operating needs of the facility.