  • PRJ-B-001-SE-F1-001

    Business Case and Opportunity Statement

    PRJ-B-001 · FEL 1 / Concept · Business and decision documents · 2012-03-10 · PRJ-B-001-WBS-F1-01 · PRJ-B-001-BL-F1-B01

    Establish the controlled business case and opportunity statement needed to execute Fermentation Extract Manufacturing Commercialization during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-F1-002

    Project Charter and Initial Scope / Battery Limits

    PRJ-B-001 · FEL 1 / Concept · Business and decision documents · 2012-03-20 · PRJ-B-001-WBS-F1-02 · PRJ-B-001-BL-F1-B01

    Establish the controlled project charter and initial scope / battery limits needed to execute Fermentation Extract Manufacturing Commercialization during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-F1-003

    Stakeholder Needs and Operating Context

    PRJ-B-001 · FEL 1 / Concept · Reports · 2012-03-31 · PRJ-B-001-WBS-F1-03 · PRJ-B-001-BL-F1-B01

    Establish the controlled stakeholder needs and operating context needed to execute Fermentation Extract Manufacturing Commercialization during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-F1-004

    Concept Alternatives and Screening Study

    PRJ-B-001 · FEL 1 / Concept · Studies and analyses · 2012-04-10 · PRJ-B-001-WBS-F1-04 · PRJ-B-001-BL-F1-B01

    Establish the controlled concept alternatives and screening study needed to execute Fermentation Extract Manufacturing Commercialization during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-F1-005

    Preliminary Schedule and Class 5 Cost Estimate

    PRJ-B-001 · FEL 1 / Concept · Studies and analyses · 2012-04-20 · PRJ-B-001-WBS-F1-01 · PRJ-B-001-BL-F1-B01

    Establish the controlled preliminary schedule and class 5 cost estimate needed to execute Fermentation Extract Manufacturing Commercialization during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-F1-006

    Initial Risk, Assumption, and Decision Register

    PRJ-B-001 · FEL 1 / Concept · Registers and indexes · 2012-05-01 · PRJ-B-001-WBS-F1-02 · PRJ-B-001-BL-F1-B01

    Establish the controlled initial risk, assumption, and decision register needed to execute Fermentation Extract Manufacturing Commercialization during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-F2-001

    Option Study and Weighted Decision Analysis

    PRJ-B-001 · FEL 2 / Select · Studies and analyses · 2012-05-12 · PRJ-B-001-WBS-F2-01 · PRJ-B-001-BL-F2-B01

    Establish the controlled option study and weighted decision analysis needed to execute Fermentation Extract Manufacturing Commercialization during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-F2-002

    Design Basis Memorandum

    PRJ-B-001 · FEL 2 / Select · Design definitions · 2012-05-23 · PRJ-B-001-WBS-F2-02 · PRJ-B-001-BL-F2-B01

    Establish the controlled design basis memorandum needed to execute Fermentation Extract Manufacturing Commercialization during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-F2-003

    Site, Layout, and Process Alternative Study

    PRJ-B-001 · FEL 2 / Select · Studies and analyses · 2012-06-03 · PRJ-B-001-WBS-F2-03 · PRJ-B-001-BL-F2-B01

    Establish the controlled site, layout, and process alternative study needed to execute Fermentation Extract Manufacturing Commercialization during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-F2-004

    Stakeholder and System Requirements Specification

    PRJ-B-001 · FEL 2 / Select · Specifications · 2012-06-14 · PRJ-B-001-WBS-F2-04 · PRJ-B-001-BL-F2-B01

    Establish the controlled stakeholder and system requirements specification needed to execute Fermentation Extract Manufacturing Commercialization during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-F2-005

    Concept Architecture and Interface Definition

    PRJ-B-001 · FEL 2 / Select · Design definitions · 2012-06-25 · PRJ-B-001-WBS-F2-01 · PRJ-B-001-BL-F2-B01

    Establish the controlled concept architecture and interface definition needed to execute Fermentation Extract Manufacturing Commercialization during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-F2-006

    HAZID / Constructability / Operability Study

    PRJ-B-001 · FEL 2 / Select · Studies and analyses · 2012-07-06 · PRJ-B-001-WBS-F2-02 · PRJ-B-001-BL-F2-B01

    Establish the controlled hazid / constructability / operability study needed to execute Fermentation Extract Manufacturing Commercialization during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-F2-007

    Class 4 Estimate and Level 2 Schedule

    PRJ-B-001 · FEL 2 / Select · Studies and analyses · 2012-07-17 · PRJ-B-001-WBS-F2-03 · PRJ-B-001-BL-F2-B01

    Establish the controlled class 4 estimate and level 2 schedule needed to execute Fermentation Extract Manufacturing Commercialization during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-F2-008

    Selected Concept and G2 Decision Dossier

    PRJ-B-001 · FEL 2 / Select · Dossiers and manual sets · 2012-07-28 · PRJ-B-001-WBS-F2-04 · PRJ-B-001-BL-F2-B01

    Establish the controlled selected concept and g2 decision dossier needed to execute Fermentation Extract Manufacturing Commercialization during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-F3-001

    Defined Scope and Design Deliverables Register

    PRJ-B-001 · FEL 3 / Define · Registers and indexes · 2012-08-08 · PRJ-B-001-WBS-F3-01 · PRJ-B-001-BL-F3-B01

    Establish the controlled defined scope and design deliverables register needed to execute Fermentation Extract Manufacturing Commercialization during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-F3-002

    Baselined System Requirements Specification

    PRJ-B-001 · FEL 3 / Define · Specifications · 2012-08-20 · PRJ-B-001-WBS-F3-02 · PRJ-B-001-BL-F3-B01

    Establish the controlled baselined system requirements specification needed to execute Fermentation Extract Manufacturing Commercialization during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-F3-003

    System Architecture and Interface Control Document

    PRJ-B-001 · FEL 3 / Define · Design definitions · 2012-08-31 · PRJ-B-001-WBS-F3-03 · PRJ-B-001-BL-F3-B01

    Establish the controlled system architecture and interface control document needed to execute Fermentation Extract Manufacturing Commercialization during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-F3-004

    Project Execution Plan

    PRJ-B-001 · FEL 3 / Define · Plans · 2012-09-12 · PRJ-B-001-WBS-F3-04 · PRJ-B-001-BL-F3-B01

    Establish the controlled project execution plan needed to execute Fermentation Extract Manufacturing Commercialization during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-F3-005

    WBS, Work Package, and Responsibility Baseline

    PRJ-B-001 · FEL 3 / Define · Baselines and manifests · 2012-09-23 · PRJ-B-001-WBS-F3-01 · PRJ-B-001-BL-F3-B01

    Establish the controlled wbs, work package, and responsibility baseline needed to execute Fermentation Extract Manufacturing Commercialization during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-F3-006

    Class 3 Estimate and Cost Baseline

    PRJ-B-001 · FEL 3 / Define · Baselines and manifests · 2012-10-05 · PRJ-B-001-WBS-F3-02 · PRJ-B-001-BL-F3-B01

    Establish the controlled class 3 estimate and cost baseline needed to execute Fermentation Extract Manufacturing Commercialization during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-F3-007

    Coordinated Control Schedule and Resource Plan

    PRJ-B-001 · FEL 3 / Define · Plans · 2012-10-16 · PRJ-B-001-WBS-F3-03 · PRJ-B-001-BL-F3-B01

    Establish the controlled coordinated control schedule and resource plan needed to execute Fermentation Extract Manufacturing Commercialization during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-F3-008

    Procurement and Contracting Plan

    PRJ-B-001 · FEL 3 / Define · Plans · 2012-10-28 · PRJ-B-001-WBS-F3-04 · PRJ-B-001-BL-F3-B01

    Establish the controlled procurement and contracting plan needed to execute Fermentation Extract Manufacturing Commercialization during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-F3-009

    V&V, Acceptance, Commissioning, and Turnover Strategy

    PRJ-B-001 · FEL 3 / Define · Plans · 2012-11-08 · PRJ-B-001-WBS-F3-01 · PRJ-B-001-BL-F3-B01

    Establish the controlled v&v, acceptance, commissioning, and turnover strategy needed to execute Fermentation Extract Manufacturing Commercialization during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-F3-010

    FID / G3 Approval and Baseline Manifest

    PRJ-B-001 · FEL 3 / Define · Certificates and approvals · 2012-11-20 · PRJ-B-001-WBS-F3-02 · PRJ-B-001-BL-F3-B01

    Establish the controlled fid / g3 approval and baseline manifest needed to execute Fermentation Extract Manufacturing Commercialization during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-DD-001

    Detailed Design Management Plan

    PRJ-B-001 · Detailed Design · Plans · 2012-12-01 · PRJ-B-001-WBS-DD-01 · PRJ-B-001-BL-DD-B01

    Establish the controlled detailed design management plan needed to execute Fermentation Extract Manufacturing Commercialization during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-DD-002

    Process / Functional Design Package

    PRJ-B-001 · Detailed Design · Design definitions · 2012-12-13 · PRJ-B-001-WBS-DD-02 · PRJ-B-001-BL-DD-B01

    Establish the controlled process / functional design package needed to execute Fermentation Extract Manufacturing Commercialization during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-DD-003

    Mechanical and Piping Design Package

    PRJ-B-001 · Detailed Design · Design definitions · 2012-12-24 · PRJ-B-001-WBS-DD-03 · PRJ-B-001-BL-DD-B01

    Establish the controlled mechanical and piping design package needed to execute Fermentation Extract Manufacturing Commercialization during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-DD-004

    Electrical Power and Controls Design Package

    PRJ-B-001 · Detailed Design · Design definitions · 2013-01-05 · PRJ-B-001-WBS-DD-04 · PRJ-B-001-BL-DD-B01

    Establish the controlled electrical power and controls design package needed to execute Fermentation Extract Manufacturing Commercialization during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-DD-005

    Civil, Structural, and Architectural Design Package

    PRJ-B-001 · Detailed Design · Design definitions · 2013-01-16 · PRJ-B-001-WBS-DD-01 · PRJ-B-001-BL-DD-B01

    Establish the controlled civil, structural, and architectural design package needed to execute Fermentation Extract Manufacturing Commercialization during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-DD-006

    Instrumentation, Automation, and Data Design Package

    PRJ-B-001 · Detailed Design · Design definitions · 2013-01-28 · PRJ-B-001-WBS-DD-02 · PRJ-B-001-BL-DD-B01

    Establish the controlled instrumentation, automation, and data design package needed to execute Fermentation Extract Manufacturing Commercialization during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-DD-007

    Safety, Reliability, and Maintainability Analysis

    PRJ-B-001 · Detailed Design · Studies and analyses · 2013-02-08 · PRJ-B-001-WBS-DD-03 · PRJ-B-001-BL-DD-B01

    Establish the controlled safety, reliability, and maintainability analysis needed to execute Fermentation Extract Manufacturing Commercialization during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-DD-008

    Design Review and Comment Resolution Record

    PRJ-B-001 · Detailed Design · Records and logs · 2013-02-20 · PRJ-B-001-WBS-DD-04 · PRJ-B-001-BL-DD-B01

    Establish the controlled design review and comment resolution record needed to execute Fermentation Extract Manufacturing Commercialization during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-DD-009

    Issued-for-Construction Design Baseline

    PRJ-B-001 · Detailed Design · Baselines and manifests · 2013-03-03 · PRJ-B-001-WBS-DD-01 · PRJ-B-001-BL-DD-B01

    Establish the controlled issued-for-construction design baseline needed to execute Fermentation Extract Manufacturing Commercialization during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-DD-010

    Design V&V Evidence Index

    PRJ-B-001 · Detailed Design · Registers and indexes · 2013-03-15 · PRJ-B-001-WBS-DD-02 · PRJ-B-001-BL-DD-B01

    Establish the controlled design v&v evidence index needed to execute Fermentation Extract Manufacturing Commercialization during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-PR-001

    Procurement Package and Bid List

    PRJ-B-001 · Procurement · Registers and indexes · 2013-03-26 · PRJ-B-001-WBS-PR-01 · PRJ-B-001-BL-PR-B01

    Establish the controlled procurement package and bid list needed to execute Fermentation Extract Manufacturing Commercialization during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-PR-002

    Technical Requisition and Datasheet Set

    PRJ-B-001 · Procurement · Specifications · 2013-04-07 · PRJ-B-001-WBS-PR-02 · PRJ-B-001-BL-PR-B01

    Establish the controlled technical requisition and datasheet set needed to execute Fermentation Extract Manufacturing Commercialization during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-PR-003

    Commercial Bid Evaluation and Award Recommendation

    PRJ-B-001 · Procurement · Studies and analyses · 2013-04-19 · PRJ-B-001-WBS-PR-03 · PRJ-B-001-BL-PR-B01

    Establish the controlled commercial bid evaluation and award recommendation needed to execute Fermentation Extract Manufacturing Commercialization during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-PR-004

    Technical Bid Evaluation and Clarification Log

    PRJ-B-001 · Procurement · Registers and indexes · 2013-05-01 · PRJ-B-001-WBS-PR-04 · PRJ-B-001-BL-PR-B01

    Establish the controlled technical bid evaluation and clarification log needed to execute Fermentation Extract Manufacturing Commercialization during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-PR-005

    Purchase Order / Contract and Scope of Supply

    PRJ-B-001 · Procurement · Business and decision documents · 2013-05-12 · PRJ-B-001-WBS-PR-01 · PRJ-B-001-BL-PR-B01

    Establish the controlled purchase order / contract and scope of supply needed to execute Fermentation Extract Manufacturing Commercialization during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-PR-006

    Supplier Quality and Inspection Plan

    PRJ-B-001 · Procurement · Plans · 2013-05-24 · PRJ-B-001-WBS-PR-02 · PRJ-B-001-BL-PR-B01

    Establish the controlled supplier quality and inspection plan needed to execute Fermentation Extract Manufacturing Commercialization during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-PR-007

    Vendor Data, Submittal, and RFI Register

    PRJ-B-001 · Procurement · Registers and indexes · 2013-06-05 · PRJ-B-001-WBS-PR-03 · PRJ-B-001-BL-PR-B01

    Establish the controlled vendor data, submittal, and rfi register needed to execute Fermentation Extract Manufacturing Commercialization during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-PR-008

    Expediting and Logistics Plan

    PRJ-B-001 · Procurement · Plans · 2013-06-17 · PRJ-B-001-WBS-PR-04 · PRJ-B-001-BL-PR-B01

    Establish the controlled expediting and logistics plan needed to execute Fermentation Extract Manufacturing Commercialization during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-PR-009

    Factory Acceptance Test Procedure and Report

    PRJ-B-001 · Procurement · Procedures · 2013-06-29 · PRJ-B-001-WBS-PR-01 · PRJ-B-001-BL-PR-B01

    Establish the controlled factory acceptance test procedure and report needed to execute Fermentation Extract Manufacturing Commercialization during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-FC-001

    Construction / Fabrication Execution Plan

    PRJ-B-001 · Fabrication / Construction · Plans · 2013-07-16 · PRJ-B-001-WBS-FC-01 · PRJ-B-001-BL-FC-B01

    Establish the controlled construction / fabrication execution plan needed to execute Fermentation Extract Manufacturing Commercialization during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-FC-002

    Site Logistics, Safety, and Permit Plan

    PRJ-B-001 · Fabrication / Construction · Plans · 2013-08-03 · PRJ-B-001-WBS-FC-02 · PRJ-B-001-BL-FC-B01

    Establish the controlled site logistics, safety, and permit plan needed to execute Fermentation Extract Manufacturing Commercialization during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-FC-003

    Fabrication Drawing and Shop Package

    PRJ-B-001 · Fabrication / Construction · Design definitions · 2013-08-21 · PRJ-B-001-WBS-FC-03 · PRJ-B-001-BL-FC-B01

    Establish the controlled fabrication drawing and shop package needed to execute Fermentation Extract Manufacturing Commercialization during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-FC-004

    Field Work Package and Installation Method

    PRJ-B-001 · Fabrication / Construction · Procedures · 2013-09-07 · PRJ-B-001-WBS-FC-04 · PRJ-B-001-BL-FC-B01

    Establish the controlled field work package and installation method needed to execute Fermentation Extract Manufacturing Commercialization during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-FC-005

    Inspection and Test Plan / Quality Records

    PRJ-B-001 · Fabrication / Construction · Plans · 2013-09-25 · PRJ-B-001-WBS-FC-01 · PRJ-B-001-BL-FC-B01

    Establish the controlled inspection and test plan / quality records needed to execute Fermentation Extract Manufacturing Commercialization during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-FC-006

    Daily Progress and Quantity Report

    PRJ-B-001 · Fabrication / Construction · Records and logs · 2013-10-13 · PRJ-B-001-WBS-FC-02 · PRJ-B-001-BL-FC-B01

    Establish the controlled daily progress and quantity report needed to execute Fermentation Extract Manufacturing Commercialization during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-FC-007

    Nonconformity and Corrective Action Record

    PRJ-B-001 · Fabrication / Construction · Records and logs · 2013-10-30 · PRJ-B-001-WBS-FC-03 · PRJ-B-001-BL-FC-B01

    Establish the controlled nonconformity and corrective action record needed to execute Fermentation Extract Manufacturing Commercialization during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-FC-008

    Redline Drawing and Field Change Register

    PRJ-B-001 · Fabrication / Construction · Registers and indexes · 2013-11-17 · PRJ-B-001-WBS-FC-04 · PRJ-B-001-BL-FC-B01

    Establish the controlled redline drawing and field change register needed to execute Fermentation Extract Manufacturing Commercialization during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-FC-009

    Mechanical Completion Certificate and Punch List

    PRJ-B-001 · Fabrication / Construction · Certificates and approvals · 2013-12-05 · PRJ-B-001-WBS-FC-01 · PRJ-B-001-BL-FC-B01

    Establish the controlled mechanical completion certificate and punch list needed to execute Fermentation Extract Manufacturing Commercialization during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-IN-001

    System Coordination and Interface Plan

    PRJ-B-001 · Installation and Interface Coordination · Plans · 2013-12-16 · PRJ-B-001-WBS-IN-01 · PRJ-B-001-BL-IN-B01

    Establish the controlled system coordination and interface plan needed to execute Fermentation Extract Manufacturing Commercialization during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-IN-002

    Installation Completion and Walkdown Record

    PRJ-B-001 · Installation and Interface Coordination · Records and logs · 2013-12-27 · PRJ-B-001-WBS-IN-02 · PRJ-B-001-BL-IN-B01

    Establish the controlled installation completion and walkdown record needed to execute Fermentation Extract Manufacturing Commercialization during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-IN-003

    Controls / Software Configuration Baseline

    PRJ-B-001 · Installation and Interface Coordination · Baselines and manifests · 2014-01-07 · PRJ-B-001-WBS-IN-03 · PRJ-B-001-BL-IN-B01

    Establish the controlled controls / software configuration baseline needed to execute Fermentation Extract Manufacturing Commercialization during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-IN-004

    Loop Check, Continuity, and Calibration Records

    PRJ-B-001 · Installation and Interface Coordination · Records and logs · 2014-01-19 · PRJ-B-001-WBS-IN-04 · PRJ-B-001-BL-IN-B01

    Establish the controlled loop check, continuity, and calibration records needed to execute Fermentation Extract Manufacturing Commercialization during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-IN-005

    Cleaning, Flushing, and Pre-Operational Test Record

    PRJ-B-001 · Installation and Interface Coordination · Procedures · 2014-01-30 · PRJ-B-001-WBS-IN-01 · PRJ-B-001-BL-IN-B01

    Establish the controlled cleaning, flushing, and pre-operational test record needed to execute Fermentation Extract Manufacturing Commercialization during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-IN-006

    System Completion Dossier

    PRJ-B-001 · Installation and Interface Coordination · Dossiers and manual sets · 2014-02-10 · PRJ-B-001-WBS-IN-02 · PRJ-B-001-BL-IN-B01

    Establish the controlled system completion dossier needed to execute Fermentation Extract Manufacturing Commercialization during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-IN-007

    Ready-for-Commissioning Certificate

    PRJ-B-001 · Installation and Interface Coordination · Certificates and approvals · 2014-02-22 · PRJ-B-001-WBS-IN-03 · PRJ-B-001-BL-IN-B01

    Establish the controlled ready-for-commissioning certificate needed to execute Fermentation Extract Manufacturing Commercialization during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-CS-001

    Commissioning and Startup Plan

    PRJ-B-001 · Commissioning / Startup · Plans · 2014-03-04 · PRJ-B-001-WBS-CS-01 · PRJ-B-001-BL-CS-B01

    Establish the controlled commissioning and startup plan needed to execute Fermentation Extract Manufacturing Commercialization during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-CS-002

    Pre-Startup Safety / Operational Readiness Review

    PRJ-B-001 · Commissioning / Startup · Reports · 2014-03-15 · PRJ-B-001-WBS-CS-02 · PRJ-B-001-BL-CS-B01

    Establish the controlled pre-startup safety / operational readiness review needed to execute Fermentation Extract Manufacturing Commercialization during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-CS-003

    Commissioning Procedure and Results

    PRJ-B-001 · Commissioning / Startup · Procedures · 2014-03-26 · PRJ-B-001-WBS-CS-03 · PRJ-B-001-BL-CS-B01

    Establish the controlled commissioning procedure and results needed to execute Fermentation Extract Manufacturing Commercialization during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-CS-004

    Startup and Ramp-Up Log

    PRJ-B-001 · Commissioning / Startup · Registers and indexes · 2014-04-06 · PRJ-B-001-WBS-CS-04 · PRJ-B-001-BL-CS-B01

    Establish the controlled startup and ramp-up log needed to execute Fermentation Extract Manufacturing Commercialization during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-CS-005

    Performance Guarantee and Capacity Test Report

    PRJ-B-001 · Commissioning / Startup · Studies and analyses · 2014-04-16 · PRJ-B-001-WBS-CS-01 · PRJ-B-001-BL-CS-B01

    Establish the controlled performance guarantee and capacity test report needed to execute Fermentation Extract Manufacturing Commercialization during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-CS-006

    Reliability Demonstration Run Report

    PRJ-B-001 · Commissioning / Startup · Studies and analyses · 2014-04-27 · PRJ-B-001-WBS-CS-02 · PRJ-B-001-BL-CS-B01

    Establish the controlled reliability demonstration run report needed to execute Fermentation Extract Manufacturing Commercialization during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-CS-007

    Operator and Maintainer Training Record

    PRJ-B-001 · Commissioning / Startup · Records and logs · 2014-05-08 · PRJ-B-001-WBS-CS-03 · PRJ-B-001-BL-CS-B01

    Establish the controlled operator and maintainer training record needed to execute Fermentation Extract Manufacturing Commercialization during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-CS-008

    Commissioning Anomaly and Punch Closure Register

    PRJ-B-001 · Commissioning / Startup · Registers and indexes · 2014-05-19 · PRJ-B-001-WBS-CS-04 · PRJ-B-001-BL-CS-B01

    Establish the controlled commissioning anomaly and punch closure register needed to execute Fermentation Extract Manufacturing Commercialization during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-CS-009

    Performance Acceptance Certificate

    PRJ-B-001 · Commissioning / Startup · Certificates and approvals · 2014-05-30 · PRJ-B-001-WBS-CS-01 · PRJ-B-001-BL-CS-B01

    Establish the controlled performance acceptance certificate needed to execute Fermentation Extract Manufacturing Commercialization during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-OT-001

    As-Built / as-Configured Baseline Manifest

    PRJ-B-001 · Operational Turnover / Closeout · Baselines and manifests · 2014-06-06 · PRJ-B-001-WBS-OT-01 · PRJ-B-001-BL-OT-B01

    Establish the controlled as-built / as-configured baseline manifest needed to execute Fermentation Extract Manufacturing Commercialization during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-OT-002

    Operations and Maintenance Manual Set

    PRJ-B-001 · Operational Turnover / Closeout · Dossiers and manual sets · 2014-06-14 · PRJ-B-001-WBS-OT-02 · PRJ-B-001-BL-OT-B01

    Establish the controlled operations and maintenance manual set needed to execute Fermentation Extract Manufacturing Commercialization during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-OT-003

    Asset, Spare Parts, and Warranty Register

    PRJ-B-001 · Operational Turnover / Closeout · Registers and indexes · 2014-06-21 · PRJ-B-001-WBS-OT-03 · PRJ-B-001-BL-OT-B01

    Establish the controlled asset, spare parts, and warranty register needed to execute Fermentation Extract Manufacturing Commercialization during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-OT-004

    Final Technical and Commercial Acceptance Certificate

    PRJ-B-001 · Operational Turnover / Closeout · Certificates and approvals · 2014-06-29 · PRJ-B-001-WBS-OT-04 · PRJ-B-001-BL-OT-B01

    Establish the controlled final technical and commercial acceptance certificate needed to execute Fermentation Extract Manufacturing Commercialization during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-OT-005

    Operational Turnover Dossier and Ownership Transfer

    PRJ-B-001 · Operational Turnover / Closeout · Dossiers and manual sets · 2014-07-07 · PRJ-B-001-WBS-OT-01 · PRJ-B-001-BL-OT-B01

    Establish the controlled operational turnover dossier and ownership transfer needed to execute Fermentation Extract Manufacturing Commercialization during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-OT-006

    Final Cost, Schedule, Contract, and Claims Closeout

    PRJ-B-001 · Operational Turnover / Closeout · Studies and analyses · 2014-07-14 · PRJ-B-001-WBS-OT-02 · PRJ-B-001-BL-OT-B01

    Establish the controlled final cost, schedule, contract, and claims closeout needed to execute Fermentation Extract Manufacturing Commercialization during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-OT-007

    Controlled Records Archive and Retrieval Index

    PRJ-B-001 · Operational Turnover / Closeout · Registers and indexes · 2014-07-22 · PRJ-B-001-WBS-OT-03 · PRJ-B-001-BL-OT-B01

    Establish the controlled controlled records archive and retrieval index needed to execute Fermentation Extract Manufacturing Commercialization during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-001-SE-OT-008

    Lessons Learned and Benefit Realization Baseline

    PRJ-B-001 · Operational Turnover / Closeout · Baselines and manifests · 2014-07-30 · PRJ-B-001-WBS-OT-04 · PRJ-B-001-BL-OT-B01

    Establish the controlled lessons learned and benefit realization baseline needed to execute Fermentation Extract Manufacturing Commercialization during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to RBE process train within PRJ-B-001 - Fermentation Extract Manufacturing Commercialization. The project scope is: Extraction, solids separation, ion exchange, pH control, concentration, cold hold, thermal treatment, drying, standardization, QC release, packaging, utilities, controls, and operating readiness. Qualified commercial manufacturing train with controlled formulation, repeatable product quality, trained operators, and released batch documentation.

  • PRJ-B-002-SE-F1-001

    Business Case and Opportunity Statement

    PRJ-B-002 · FEL 1 / Concept · Business and decision documents · 2013-01-24 · PRJ-B-002-WBS-F1-01 · PRJ-B-002-BL-F1-B01

    Establish the controlled business case and opportunity statement needed to execute Processed Meat and Seafood Soluble RBE Application Platform during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-F1-002

    Project Charter and Initial Scope / Battery Limits

    PRJ-B-002 · FEL 1 / Concept · Business and decision documents · 2013-02-04 · PRJ-B-002-WBS-F1-02 · PRJ-B-002-BL-F1-B01

    Establish the controlled project charter and initial scope / battery limits needed to execute Processed Meat and Seafood Soluble RBE Application Platform during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-F1-003

    Stakeholder Needs and Operating Context

    PRJ-B-002 · FEL 1 / Concept · Reports · 2013-02-14 · PRJ-B-002-WBS-F1-03 · PRJ-B-002-BL-F1-B01

    Establish the controlled stakeholder needs and operating context needed to execute Processed Meat and Seafood Soluble RBE Application Platform during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-F1-004

    Concept Alternatives and Screening Study

    PRJ-B-002 · FEL 1 / Concept · Studies and analyses · 2013-02-25 · PRJ-B-002-WBS-F1-04 · PRJ-B-002-BL-F1-B01

    Establish the controlled concept alternatives and screening study needed to execute Processed Meat and Seafood Soluble RBE Application Platform during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-F1-005

    Preliminary Schedule and Class 5 Cost Estimate

    PRJ-B-002 · FEL 1 / Concept · Studies and analyses · 2013-03-07 · PRJ-B-002-WBS-F1-01 · PRJ-B-002-BL-F1-B01

    Establish the controlled preliminary schedule and class 5 cost estimate needed to execute Processed Meat and Seafood Soluble RBE Application Platform during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-F1-006

    Initial Risk, Assumption, and Decision Register

    PRJ-B-002 · FEL 1 / Concept · Registers and indexes · 2013-03-18 · PRJ-B-002-WBS-F1-02 · PRJ-B-002-BL-F1-B01

    Establish the controlled initial risk, assumption, and decision register needed to execute Processed Meat and Seafood Soluble RBE Application Platform during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-F2-001

    Option Study and Weighted Decision Analysis

    PRJ-B-002 · FEL 2 / Select · Studies and analyses · 2013-03-29 · PRJ-B-002-WBS-F2-01 · PRJ-B-002-BL-F2-B01

    Establish the controlled option study and weighted decision analysis needed to execute Processed Meat and Seafood Soluble RBE Application Platform during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-F2-002

    Design Basis Memorandum

    PRJ-B-002 · FEL 2 / Select · Design definitions · 2013-04-09 · PRJ-B-002-WBS-F2-02 · PRJ-B-002-BL-F2-B01

    Establish the controlled design basis memorandum needed to execute Processed Meat and Seafood Soluble RBE Application Platform during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-F2-003

    Site, Layout, and Process Alternative Study

    PRJ-B-002 · FEL 2 / Select · Studies and analyses · 2013-04-20 · PRJ-B-002-WBS-F2-03 · PRJ-B-002-BL-F2-B01

    Establish the controlled site, layout, and process alternative study needed to execute Processed Meat and Seafood Soluble RBE Application Platform during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-F2-004

    Stakeholder and System Requirements Specification

    PRJ-B-002 · FEL 2 / Select · Specifications · 2013-05-02 · PRJ-B-002-WBS-F2-04 · PRJ-B-002-BL-F2-B01

    Establish the controlled stakeholder and system requirements specification needed to execute Processed Meat and Seafood Soluble RBE Application Platform during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-F2-005

    Concept Architecture and Interface Definition

    PRJ-B-002 · FEL 2 / Select · Design definitions · 2013-05-13 · PRJ-B-002-WBS-F2-01 · PRJ-B-002-BL-F2-B01

    Establish the controlled concept architecture and interface definition needed to execute Processed Meat and Seafood Soluble RBE Application Platform during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-F2-006

    HAZID / Constructability / Operability Study

    PRJ-B-002 · FEL 2 / Select · Studies and analyses · 2013-05-24 · PRJ-B-002-WBS-F2-02 · PRJ-B-002-BL-F2-B01

    Establish the controlled hazid / constructability / operability study needed to execute Processed Meat and Seafood Soluble RBE Application Platform during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-F2-007

    Class 4 Estimate and Level 2 Schedule

    PRJ-B-002 · FEL 2 / Select · Studies and analyses · 2013-06-04 · PRJ-B-002-WBS-F2-03 · PRJ-B-002-BL-F2-B01

    Establish the controlled class 4 estimate and level 2 schedule needed to execute Processed Meat and Seafood Soluble RBE Application Platform during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-F2-008

    Selected Concept and G2 Decision Dossier

    PRJ-B-002 · FEL 2 / Select · Dossiers and manual sets · 2013-06-16 · PRJ-B-002-WBS-F2-04 · PRJ-B-002-BL-F2-B01

    Establish the controlled selected concept and g2 decision dossier needed to execute Processed Meat and Seafood Soluble RBE Application Platform during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-F3-001

    Defined Scope and Design Deliverables Register

    PRJ-B-002 · FEL 3 / Define · Registers and indexes · 2013-06-27 · PRJ-B-002-WBS-F3-01 · PRJ-B-002-BL-F3-B01

    Establish the controlled defined scope and design deliverables register needed to execute Processed Meat and Seafood Soluble RBE Application Platform during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-F3-002

    Baselined System Requirements Specification

    PRJ-B-002 · FEL 3 / Define · Specifications · 2013-07-09 · PRJ-B-002-WBS-F3-02 · PRJ-B-002-BL-F3-B01

    Establish the controlled baselined system requirements specification needed to execute Processed Meat and Seafood Soluble RBE Application Platform during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-F3-003

    System Architecture and Interface Control Document

    PRJ-B-002 · FEL 3 / Define · Design definitions · 2013-07-21 · PRJ-B-002-WBS-F3-03 · PRJ-B-002-BL-F3-B01

    Establish the controlled system architecture and interface control document needed to execute Processed Meat and Seafood Soluble RBE Application Platform during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-F3-004

    Project Execution Plan

    PRJ-B-002 · FEL 3 / Define · Plans · 2013-08-01 · PRJ-B-002-WBS-F3-04 · PRJ-B-002-BL-F3-B01

    Establish the controlled project execution plan needed to execute Processed Meat and Seafood Soluble RBE Application Platform during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-F3-005

    WBS, Work Package, and Responsibility Baseline

    PRJ-B-002 · FEL 3 / Define · Baselines and manifests · 2013-08-13 · PRJ-B-002-WBS-F3-01 · PRJ-B-002-BL-F3-B01

    Establish the controlled wbs, work package, and responsibility baseline needed to execute Processed Meat and Seafood Soluble RBE Application Platform during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-F3-006

    Class 3 Estimate and Cost Baseline

    PRJ-B-002 · FEL 3 / Define · Baselines and manifests · 2013-08-25 · PRJ-B-002-WBS-F3-02 · PRJ-B-002-BL-F3-B01

    Establish the controlled class 3 estimate and cost baseline needed to execute Processed Meat and Seafood Soluble RBE Application Platform during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-F3-007

    Coordinated Control Schedule and Resource Plan

    PRJ-B-002 · FEL 3 / Define · Plans · 2013-09-05 · PRJ-B-002-WBS-F3-03 · PRJ-B-002-BL-F3-B01

    Establish the controlled coordinated control schedule and resource plan needed to execute Processed Meat and Seafood Soluble RBE Application Platform during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-F3-008

    Procurement and Contracting Plan

    PRJ-B-002 · FEL 3 / Define · Plans · 2013-09-17 · PRJ-B-002-WBS-F3-04 · PRJ-B-002-BL-F3-B01

    Establish the controlled procurement and contracting plan needed to execute Processed Meat and Seafood Soluble RBE Application Platform during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-F3-009

    V&V, Acceptance, Commissioning, and Turnover Strategy

    PRJ-B-002 · FEL 3 / Define · Plans · 2013-09-29 · PRJ-B-002-WBS-F3-01 · PRJ-B-002-BL-F3-B01

    Establish the controlled v&v, acceptance, commissioning, and turnover strategy needed to execute Processed Meat and Seafood Soluble RBE Application Platform during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-F3-010

    FID / G3 Approval and Baseline Manifest

    PRJ-B-002 · FEL 3 / Define · Certificates and approvals · 2013-10-11 · PRJ-B-002-WBS-F3-02 · PRJ-B-002-BL-F3-B01

    Establish the controlled fid / g3 approval and baseline manifest needed to execute Processed Meat and Seafood Soluble RBE Application Platform during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-DD-001

    Detailed Design Management Plan

    PRJ-B-002 · Detailed Design · Plans · 2013-10-22 · PRJ-B-002-WBS-DD-01 · PRJ-B-002-BL-DD-B01

    Establish the controlled detailed design management plan needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-DD-002

    Process / Functional Design Package

    PRJ-B-002 · Detailed Design · Design definitions · 2013-11-03 · PRJ-B-002-WBS-DD-02 · PRJ-B-002-BL-DD-B01

    Establish the controlled process / functional design package needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-DD-003

    Mechanical and Piping Design Package

    PRJ-B-002 · Detailed Design · Design definitions · 2013-11-15 · PRJ-B-002-WBS-DD-03 · PRJ-B-002-BL-DD-B01

    Establish the controlled mechanical and piping design package needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-DD-004

    Electrical Power and Controls Design Package

    PRJ-B-002 · Detailed Design · Design definitions · 2013-11-26 · PRJ-B-002-WBS-DD-04 · PRJ-B-002-BL-DD-B01

    Establish the controlled electrical power and controls design package needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-DD-005

    Civil, Structural, and Architectural Design Package

    PRJ-B-002 · Detailed Design · Design definitions · 2013-12-08 · PRJ-B-002-WBS-DD-01 · PRJ-B-002-BL-DD-B01

    Establish the controlled civil, structural, and architectural design package needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-DD-006

    Instrumentation, Automation, and Data Design Package

    PRJ-B-002 · Detailed Design · Design definitions · 2013-12-20 · PRJ-B-002-WBS-DD-02 · PRJ-B-002-BL-DD-B01

    Establish the controlled instrumentation, automation, and data design package needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-DD-007

    Safety, Reliability, and Maintainability Analysis

    PRJ-B-002 · Detailed Design · Studies and analyses · 2013-12-31 · PRJ-B-002-WBS-DD-03 · PRJ-B-002-BL-DD-B01

    Establish the controlled safety, reliability, and maintainability analysis needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-DD-008

    Design Review and Comment Resolution Record

    PRJ-B-002 · Detailed Design · Records and logs · 2014-01-12 · PRJ-B-002-WBS-DD-04 · PRJ-B-002-BL-DD-B01

    Establish the controlled design review and comment resolution record needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-DD-009

    Issued-for-Construction Design Baseline

    PRJ-B-002 · Detailed Design · Baselines and manifests · 2014-01-24 · PRJ-B-002-WBS-DD-01 · PRJ-B-002-BL-DD-B01

    Establish the controlled issued-for-construction design baseline needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-DD-010

    Design V&V Evidence Index

    PRJ-B-002 · Detailed Design · Registers and indexes · 2014-02-05 · PRJ-B-002-WBS-DD-02 · PRJ-B-002-BL-DD-B01

    Establish the controlled design v&v evidence index needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-PR-001

    Procurement Package and Bid List

    PRJ-B-002 · Procurement · Registers and indexes · 2014-02-17 · PRJ-B-002-WBS-PR-01 · PRJ-B-002-BL-PR-B01

    Establish the controlled procurement package and bid list needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-PR-002

    Technical Requisition and Datasheet Set

    PRJ-B-002 · Procurement · Specifications · 2014-03-01 · PRJ-B-002-WBS-PR-02 · PRJ-B-002-BL-PR-B01

    Establish the controlled technical requisition and datasheet set needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-PR-003

    Commercial Bid Evaluation and Award Recommendation

    PRJ-B-002 · Procurement · Studies and analyses · 2014-03-13 · PRJ-B-002-WBS-PR-03 · PRJ-B-002-BL-PR-B01

    Establish the controlled commercial bid evaluation and award recommendation needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-PR-004

    Technical Bid Evaluation and Clarification Log

    PRJ-B-002 · Procurement · Registers and indexes · 2014-03-25 · PRJ-B-002-WBS-PR-04 · PRJ-B-002-BL-PR-B01

    Establish the controlled technical bid evaluation and clarification log needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-PR-005

    Purchase Order / Contract and Scope of Supply

    PRJ-B-002 · Procurement · Business and decision documents · 2014-04-06 · PRJ-B-002-WBS-PR-01 · PRJ-B-002-BL-PR-B01

    Establish the controlled purchase order / contract and scope of supply needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-PR-006

    Supplier Quality and Inspection Plan

    PRJ-B-002 · Procurement · Plans · 2014-04-18 · PRJ-B-002-WBS-PR-02 · PRJ-B-002-BL-PR-B01

    Establish the controlled supplier quality and inspection plan needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-PR-007

    Vendor Data, Submittal, and RFI Register

    PRJ-B-002 · Procurement · Registers and indexes · 2014-04-30 · PRJ-B-002-WBS-PR-03 · PRJ-B-002-BL-PR-B01

    Establish the controlled vendor data, submittal, and rfi register needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-PR-008

    Expediting and Logistics Plan

    PRJ-B-002 · Procurement · Plans · 2014-05-12 · PRJ-B-002-WBS-PR-04 · PRJ-B-002-BL-PR-B01

    Establish the controlled expediting and logistics plan needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-PR-009

    Factory Acceptance Test Procedure and Report

    PRJ-B-002 · Procurement · Procedures · 2014-05-24 · PRJ-B-002-WBS-PR-01 · PRJ-B-002-BL-PR-B01

    Establish the controlled factory acceptance test procedure and report needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-FC-001

    Construction / Fabrication Execution Plan

    PRJ-B-002 · Fabrication / Construction · Plans · 2014-06-10 · PRJ-B-002-WBS-FC-01 · PRJ-B-002-BL-FC-B01

    Establish the controlled construction / fabrication execution plan needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-FC-002

    Site Logistics, Safety, and Permit Plan

    PRJ-B-002 · Fabrication / Construction · Plans · 2014-06-28 · PRJ-B-002-WBS-FC-02 · PRJ-B-002-BL-FC-B01

    Establish the controlled site logistics, safety, and permit plan needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-FC-003

    Fabrication Drawing and Shop Package

    PRJ-B-002 · Fabrication / Construction · Design definitions · 2014-07-16 · PRJ-B-002-WBS-FC-03 · PRJ-B-002-BL-FC-B01

    Establish the controlled fabrication drawing and shop package needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-FC-004

    Field Work Package and Installation Method

    PRJ-B-002 · Fabrication / Construction · Procedures · 2014-08-03 · PRJ-B-002-WBS-FC-04 · PRJ-B-002-BL-FC-B01

    Establish the controlled field work package and installation method needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-FC-005

    Inspection and Test Plan / Quality Records

    PRJ-B-002 · Fabrication / Construction · Plans · 2014-08-21 · PRJ-B-002-WBS-FC-01 · PRJ-B-002-BL-FC-B01

    Establish the controlled inspection and test plan / quality records needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-FC-006

    Daily Progress and Quantity Report

    PRJ-B-002 · Fabrication / Construction · Records and logs · 2014-09-08 · PRJ-B-002-WBS-FC-02 · PRJ-B-002-BL-FC-B01

    Establish the controlled daily progress and quantity report needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-FC-007

    Nonconformity and Corrective Action Record

    PRJ-B-002 · Fabrication / Construction · Records and logs · 2014-09-26 · PRJ-B-002-WBS-FC-03 · PRJ-B-002-BL-FC-B01

    Establish the controlled nonconformity and corrective action record needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-FC-008

    Redline Drawing and Field Change Register

    PRJ-B-002 · Fabrication / Construction · Registers and indexes · 2014-10-14 · PRJ-B-002-WBS-FC-04 · PRJ-B-002-BL-FC-B01

    Establish the controlled redline drawing and field change register needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-FC-009

    Mechanical Completion Certificate and Punch List

    PRJ-B-002 · Fabrication / Construction · Certificates and approvals · 2014-11-01 · PRJ-B-002-WBS-FC-01 · PRJ-B-002-BL-FC-B01

    Establish the controlled mechanical completion certificate and punch list needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-IN-001

    System Coordination and Interface Plan

    PRJ-B-002 · Installation and Interface Coordination · Plans · 2014-11-12 · PRJ-B-002-WBS-IN-01 · PRJ-B-002-BL-IN-B01

    Establish the controlled system coordination and interface plan needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-IN-002

    Installation Completion and Walkdown Record

    PRJ-B-002 · Installation and Interface Coordination · Records and logs · 2014-11-24 · PRJ-B-002-WBS-IN-02 · PRJ-B-002-BL-IN-B01

    Establish the controlled installation completion and walkdown record needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-IN-003

    Controls / Software Configuration Baseline

    PRJ-B-002 · Installation and Interface Coordination · Baselines and manifests · 2014-12-05 · PRJ-B-002-WBS-IN-03 · PRJ-B-002-BL-IN-B01

    Establish the controlled controls / software configuration baseline needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-IN-004

    Loop Check, Continuity, and Calibration Records

    PRJ-B-002 · Installation and Interface Coordination · Records and logs · 2014-12-17 · PRJ-B-002-WBS-IN-04 · PRJ-B-002-BL-IN-B01

    Establish the controlled loop check, continuity, and calibration records needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-IN-005

    Cleaning, Flushing, and Pre-Operational Test Record

    PRJ-B-002 · Installation and Interface Coordination · Procedures · 2014-12-28 · PRJ-B-002-WBS-IN-01 · PRJ-B-002-BL-IN-B01

    Establish the controlled cleaning, flushing, and pre-operational test record needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-IN-006

    System Completion Dossier

    PRJ-B-002 · Installation and Interface Coordination · Dossiers and manual sets · 2015-01-09 · PRJ-B-002-WBS-IN-02 · PRJ-B-002-BL-IN-B01

    Establish the controlled system completion dossier needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-IN-007

    Ready-for-Commissioning Certificate

    PRJ-B-002 · Installation and Interface Coordination · Certificates and approvals · 2015-01-21 · PRJ-B-002-WBS-IN-03 · PRJ-B-002-BL-IN-B01

    Establish the controlled ready-for-commissioning certificate needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-CS-001

    Commissioning and Startup Plan

    PRJ-B-002 · Commissioning / Startup · Plans · 2015-02-01 · PRJ-B-002-WBS-CS-01 · PRJ-B-002-BL-CS-B01

    Establish the controlled commissioning and startup plan needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-CS-002

    Pre-Startup Safety / Operational Readiness Review

    PRJ-B-002 · Commissioning / Startup · Reports · 2015-02-12 · PRJ-B-002-WBS-CS-02 · PRJ-B-002-BL-CS-B01

    Establish the controlled pre-startup safety / operational readiness review needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-CS-003

    Commissioning Procedure and Results

    PRJ-B-002 · Commissioning / Startup · Procedures · 2015-02-23 · PRJ-B-002-WBS-CS-03 · PRJ-B-002-BL-CS-B01

    Establish the controlled commissioning procedure and results needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-CS-004

    Startup and Ramp-Up Log

    PRJ-B-002 · Commissioning / Startup · Registers and indexes · 2015-03-06 · PRJ-B-002-WBS-CS-04 · PRJ-B-002-BL-CS-B01

    Establish the controlled startup and ramp-up log needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-CS-005

    Performance Guarantee and Capacity Test Report

    PRJ-B-002 · Commissioning / Startup · Studies and analyses · 2015-03-17 · PRJ-B-002-WBS-CS-01 · PRJ-B-002-BL-CS-B01

    Establish the controlled performance guarantee and capacity test report needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-CS-006

    Reliability Demonstration Run Report

    PRJ-B-002 · Commissioning / Startup · Studies and analyses · 2015-03-28 · PRJ-B-002-WBS-CS-02 · PRJ-B-002-BL-CS-B01

    Establish the controlled reliability demonstration run report needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-CS-007

    Operator and Maintainer Training Record

    PRJ-B-002 · Commissioning / Startup · Records and logs · 2015-04-08 · PRJ-B-002-WBS-CS-03 · PRJ-B-002-BL-CS-B01

    Establish the controlled operator and maintainer training record needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-CS-008

    Commissioning Anomaly and Punch Closure Register

    PRJ-B-002 · Commissioning / Startup · Registers and indexes · 2015-04-19 · PRJ-B-002-WBS-CS-04 · PRJ-B-002-BL-CS-B01

    Establish the controlled commissioning anomaly and punch closure register needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-CS-009

    Performance Acceptance Certificate

    PRJ-B-002 · Commissioning / Startup · Certificates and approvals · 2015-04-30 · PRJ-B-002-WBS-CS-01 · PRJ-B-002-BL-CS-B01

    Establish the controlled performance acceptance certificate needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-OT-001

    As-Built / as-Configured Baseline Manifest

    PRJ-B-002 · Operational Turnover / Closeout · Baselines and manifests · 2015-05-07 · PRJ-B-002-WBS-OT-01 · PRJ-B-002-BL-OT-B01

    Establish the controlled as-built / as-configured baseline manifest needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-OT-002

    Operations and Maintenance Manual Set

    PRJ-B-002 · Operational Turnover / Closeout · Dossiers and manual sets · 2015-05-15 · PRJ-B-002-WBS-OT-02 · PRJ-B-002-BL-OT-B01

    Establish the controlled operations and maintenance manual set needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-OT-003

    Asset, Spare Parts, and Warranty Register

    PRJ-B-002 · Operational Turnover / Closeout · Registers and indexes · 2015-05-22 · PRJ-B-002-WBS-OT-03 · PRJ-B-002-BL-OT-B01

    Establish the controlled asset, spare parts, and warranty register needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-OT-004

    Final Technical and Commercial Acceptance Certificate

    PRJ-B-002 · Operational Turnover / Closeout · Certificates and approvals · 2015-05-30 · PRJ-B-002-WBS-OT-04 · PRJ-B-002-BL-OT-B01

    Establish the controlled final technical and commercial acceptance certificate needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-OT-005

    Operational Turnover Dossier and Ownership Transfer

    PRJ-B-002 · Operational Turnover / Closeout · Dossiers and manual sets · 2015-06-07 · PRJ-B-002-WBS-OT-01 · PRJ-B-002-BL-OT-B01

    Establish the controlled operational turnover dossier and ownership transfer needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-OT-006

    Final Cost, Schedule, Contract, and Claims Closeout

    PRJ-B-002 · Operational Turnover / Closeout · Studies and analyses · 2015-06-14 · PRJ-B-002-WBS-OT-02 · PRJ-B-002-BL-OT-B01

    Establish the controlled final cost, schedule, contract, and claims closeout needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-OT-007

    Controlled Records Archive and Retrieval Index

    PRJ-B-002 · Operational Turnover / Closeout · Registers and indexes · 2015-06-22 · PRJ-B-002-WBS-OT-03 · PRJ-B-002-BL-OT-B01

    Establish the controlled controlled records archive and retrieval index needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-002-SE-OT-008

    Lessons Learned and Benefit Realization Baseline

    PRJ-B-002 · Operational Turnover / Closeout · Baselines and manifests · 2015-06-30 · PRJ-B-002-WBS-OT-04 · PRJ-B-002-BL-OT-B01

    Establish the controlled lessons learned and benefit realization baseline needed to execute Processed Meat and Seafood Soluble RBE Application Platform during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Application and pilot platform within PRJ-B-002 - Processed Meat and Seafood Soluble RBE Application Platform. The project scope is: Application requirements, formulation interfaces, pilot trials, treatment methods, analytical testing, customer qualification, packaging specifications, launch controls, and technical-service turnover. Released meat and seafood application platform supported by validated formulations, methods, specifications, and customer-use guidance.

  • PRJ-B-003-SE-F1-001

    Business Case and Opportunity Statement

    PRJ-B-003 · FEL 1 / Concept · Business and decision documents · 2017-04-08 · PRJ-B-003-WBS-F1-01 · PRJ-B-003-BL-F1-B01

    Establish the controlled business case and opportunity statement needed to execute Rice Bran Extract Meat-Analogue Platform Extension during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-F1-002

    Project Charter and Initial Scope / Battery Limits

    PRJ-B-003 · FEL 1 / Concept · Business and decision documents · 2017-04-16 · PRJ-B-003-WBS-F1-02 · PRJ-B-003-BL-F1-B01

    Establish the controlled project charter and initial scope / battery limits needed to execute Rice Bran Extract Meat-Analogue Platform Extension during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-F1-003

    Stakeholder Needs and Operating Context

    PRJ-B-003 · FEL 1 / Concept · Reports · 2017-04-24 · PRJ-B-003-WBS-F1-03 · PRJ-B-003-BL-F1-B01

    Establish the controlled stakeholder needs and operating context needed to execute Rice Bran Extract Meat-Analogue Platform Extension during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-F1-004

    Concept Alternatives and Screening Study

    PRJ-B-003 · FEL 1 / Concept · Studies and analyses · 2017-05-02 · PRJ-B-003-WBS-F1-04 · PRJ-B-003-BL-F1-B01

    Establish the controlled concept alternatives and screening study needed to execute Rice Bran Extract Meat-Analogue Platform Extension during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-F1-005

    Preliminary Schedule and Class 5 Cost Estimate

    PRJ-B-003 · FEL 1 / Concept · Studies and analyses · 2017-05-10 · PRJ-B-003-WBS-F1-01 · PRJ-B-003-BL-F1-B01

    Establish the controlled preliminary schedule and class 5 cost estimate needed to execute Rice Bran Extract Meat-Analogue Platform Extension during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-F1-006

    Initial Risk, Assumption, and Decision Register

    PRJ-B-003 · FEL 1 / Concept · Registers and indexes · 2017-05-19 · PRJ-B-003-WBS-F1-02 · PRJ-B-003-BL-F1-B01

    Establish the controlled initial risk, assumption, and decision register needed to execute Rice Bran Extract Meat-Analogue Platform Extension during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-F2-001

    Option Study and Weighted Decision Analysis

    PRJ-B-003 · FEL 2 / Select · Studies and analyses · 2017-05-27 · PRJ-B-003-WBS-F2-01 · PRJ-B-003-BL-F2-B01

    Establish the controlled option study and weighted decision analysis needed to execute Rice Bran Extract Meat-Analogue Platform Extension during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-F2-002

    Design Basis Memorandum

    PRJ-B-003 · FEL 2 / Select · Design definitions · 2017-06-05 · PRJ-B-003-WBS-F2-02 · PRJ-B-003-BL-F2-B01

    Establish the controlled design basis memorandum needed to execute Rice Bran Extract Meat-Analogue Platform Extension during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-F2-003

    Site, Layout, and Process Alternative Study

    PRJ-B-003 · FEL 2 / Select · Studies and analyses · 2017-06-14 · PRJ-B-003-WBS-F2-03 · PRJ-B-003-BL-F2-B01

    Establish the controlled site, layout, and process alternative study needed to execute Rice Bran Extract Meat-Analogue Platform Extension during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-F2-004

    Stakeholder and System Requirements Specification

    PRJ-B-003 · FEL 2 / Select · Specifications · 2017-06-23 · PRJ-B-003-WBS-F2-04 · PRJ-B-003-BL-F2-B01

    Establish the controlled stakeholder and system requirements specification needed to execute Rice Bran Extract Meat-Analogue Platform Extension during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-F2-005

    Concept Architecture and Interface Definition

    PRJ-B-003 · FEL 2 / Select · Design definitions · 2017-07-01 · PRJ-B-003-WBS-F2-01 · PRJ-B-003-BL-F2-B01

    Establish the controlled concept architecture and interface definition needed to execute Rice Bran Extract Meat-Analogue Platform Extension during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-F2-006

    HAZID / Constructability / Operability Study

    PRJ-B-003 · FEL 2 / Select · Studies and analyses · 2017-07-10 · PRJ-B-003-WBS-F2-02 · PRJ-B-003-BL-F2-B01

    Establish the controlled hazid / constructability / operability study needed to execute Rice Bran Extract Meat-Analogue Platform Extension during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-F2-007

    Class 4 Estimate and Level 2 Schedule

    PRJ-B-003 · FEL 2 / Select · Studies and analyses · 2017-07-19 · PRJ-B-003-WBS-F2-03 · PRJ-B-003-BL-F2-B01

    Establish the controlled class 4 estimate and level 2 schedule needed to execute Rice Bran Extract Meat-Analogue Platform Extension during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-F2-008

    Selected Concept and G2 Decision Dossier

    PRJ-B-003 · FEL 2 / Select · Dossiers and manual sets · 2017-07-28 · PRJ-B-003-WBS-F2-04 · PRJ-B-003-BL-F2-B01

    Establish the controlled selected concept and g2 decision dossier needed to execute Rice Bran Extract Meat-Analogue Platform Extension during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-F3-001

    Defined Scope and Design Deliverables Register

    PRJ-B-003 · FEL 3 / Define · Registers and indexes · 2017-08-06 · PRJ-B-003-WBS-F3-01 · PRJ-B-003-BL-F3-B01

    Establish the controlled defined scope and design deliverables register needed to execute Rice Bran Extract Meat-Analogue Platform Extension during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-F3-002

    Baselined System Requirements Specification

    PRJ-B-003 · FEL 3 / Define · Specifications · 2017-08-15 · PRJ-B-003-WBS-F3-02 · PRJ-B-003-BL-F3-B01

    Establish the controlled baselined system requirements specification needed to execute Rice Bran Extract Meat-Analogue Platform Extension during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-F3-003

    System Architecture and Interface Control Document

    PRJ-B-003 · FEL 3 / Define · Design definitions · 2017-08-24 · PRJ-B-003-WBS-F3-03 · PRJ-B-003-BL-F3-B01

    Establish the controlled system architecture and interface control document needed to execute Rice Bran Extract Meat-Analogue Platform Extension during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-F3-004

    Project Execution Plan

    PRJ-B-003 · FEL 3 / Define · Plans · 2017-09-02 · PRJ-B-003-WBS-F3-04 · PRJ-B-003-BL-F3-B01

    Establish the controlled project execution plan needed to execute Rice Bran Extract Meat-Analogue Platform Extension during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-F3-005

    WBS, Work Package, and Responsibility Baseline

    PRJ-B-003 · FEL 3 / Define · Baselines and manifests · 2017-09-11 · PRJ-B-003-WBS-F3-01 · PRJ-B-003-BL-F3-B01

    Establish the controlled wbs, work package, and responsibility baseline needed to execute Rice Bran Extract Meat-Analogue Platform Extension during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-F3-006

    Class 3 Estimate and Cost Baseline

    PRJ-B-003 · FEL 3 / Define · Baselines and manifests · 2017-09-20 · PRJ-B-003-WBS-F3-02 · PRJ-B-003-BL-F3-B01

    Establish the controlled class 3 estimate and cost baseline needed to execute Rice Bran Extract Meat-Analogue Platform Extension during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-F3-007

    Coordinated Control Schedule and Resource Plan

    PRJ-B-003 · FEL 3 / Define · Plans · 2017-09-29 · PRJ-B-003-WBS-F3-03 · PRJ-B-003-BL-F3-B01

    Establish the controlled coordinated control schedule and resource plan needed to execute Rice Bran Extract Meat-Analogue Platform Extension during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-F3-008

    Procurement and Contracting Plan

    PRJ-B-003 · FEL 3 / Define · Plans · 2017-10-08 · PRJ-B-003-WBS-F3-04 · PRJ-B-003-BL-F3-B01

    Establish the controlled procurement and contracting plan needed to execute Rice Bran Extract Meat-Analogue Platform Extension during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-F3-009

    V&V, Acceptance, Commissioning, and Turnover Strategy

    PRJ-B-003 · FEL 3 / Define · Plans · 2017-10-17 · PRJ-B-003-WBS-F3-01 · PRJ-B-003-BL-F3-B01

    Establish the controlled v&v, acceptance, commissioning, and turnover strategy needed to execute Rice Bran Extract Meat-Analogue Platform Extension during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-F3-010

    FID / G3 Approval and Baseline Manifest

    PRJ-B-003 · FEL 3 / Define · Certificates and approvals · 2017-10-27 · PRJ-B-003-WBS-F3-02 · PRJ-B-003-BL-F3-B01

    Establish the controlled fid / g3 approval and baseline manifest needed to execute Rice Bran Extract Meat-Analogue Platform Extension during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-DD-001

    Detailed Design Management Plan

    PRJ-B-003 · Detailed Design · Plans · 2017-11-05 · PRJ-B-003-WBS-DD-01 · PRJ-B-003-BL-DD-B01

    Establish the controlled detailed design management plan needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-DD-002

    Process / Functional Design Package

    PRJ-B-003 · Detailed Design · Design definitions · 2017-11-14 · PRJ-B-003-WBS-DD-02 · PRJ-B-003-BL-DD-B01

    Establish the controlled process / functional design package needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-DD-003

    Mechanical and Piping Design Package

    PRJ-B-003 · Detailed Design · Design definitions · 2017-11-23 · PRJ-B-003-WBS-DD-03 · PRJ-B-003-BL-DD-B01

    Establish the controlled mechanical and piping design package needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-DD-004

    Electrical Power and Controls Design Package

    PRJ-B-003 · Detailed Design · Design definitions · 2017-12-02 · PRJ-B-003-WBS-DD-04 · PRJ-B-003-BL-DD-B01

    Establish the controlled electrical power and controls design package needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-DD-005

    Civil, Structural, and Architectural Design Package

    PRJ-B-003 · Detailed Design · Design definitions · 2017-12-11 · PRJ-B-003-WBS-DD-01 · PRJ-B-003-BL-DD-B01

    Establish the controlled civil, structural, and architectural design package needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-DD-006

    Instrumentation, Automation, and Data Design Package

    PRJ-B-003 · Detailed Design · Design definitions · 2017-12-20 · PRJ-B-003-WBS-DD-02 · PRJ-B-003-BL-DD-B01

    Establish the controlled instrumentation, automation, and data design package needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-DD-007

    Safety, Reliability, and Maintainability Analysis

    PRJ-B-003 · Detailed Design · Studies and analyses · 2017-12-29 · PRJ-B-003-WBS-DD-03 · PRJ-B-003-BL-DD-B01

    Establish the controlled safety, reliability, and maintainability analysis needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-DD-008

    Design Review and Comment Resolution Record

    PRJ-B-003 · Detailed Design · Records and logs · 2018-01-07 · PRJ-B-003-WBS-DD-04 · PRJ-B-003-BL-DD-B01

    Establish the controlled design review and comment resolution record needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-DD-009

    Issued-for-Construction Design Baseline

    PRJ-B-003 · Detailed Design · Baselines and manifests · 2018-01-16 · PRJ-B-003-WBS-DD-01 · PRJ-B-003-BL-DD-B01

    Establish the controlled issued-for-construction design baseline needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-DD-010

    Design V&V Evidence Index

    PRJ-B-003 · Detailed Design · Registers and indexes · 2018-01-26 · PRJ-B-003-WBS-DD-02 · PRJ-B-003-BL-DD-B01

    Establish the controlled design v&v evidence index needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-PR-001

    Procurement Package and Bid List

    PRJ-B-003 · Procurement · Registers and indexes · 2018-02-04 · PRJ-B-003-WBS-PR-01 · PRJ-B-003-BL-PR-B01

    Establish the controlled procurement package and bid list needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-PR-002

    Technical Requisition and Datasheet Set

    PRJ-B-003 · Procurement · Specifications · 2018-02-13 · PRJ-B-003-WBS-PR-02 · PRJ-B-003-BL-PR-B01

    Establish the controlled technical requisition and datasheet set needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-PR-003

    Commercial Bid Evaluation and Award Recommendation

    PRJ-B-003 · Procurement · Studies and analyses · 2018-02-23 · PRJ-B-003-WBS-PR-03 · PRJ-B-003-BL-PR-B01

    Establish the controlled commercial bid evaluation and award recommendation needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-PR-004

    Technical Bid Evaluation and Clarification Log

    PRJ-B-003 · Procurement · Registers and indexes · 2018-03-04 · PRJ-B-003-WBS-PR-04 · PRJ-B-003-BL-PR-B01

    Establish the controlled technical bid evaluation and clarification log needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-PR-005

    Purchase Order / Contract and Scope of Supply

    PRJ-B-003 · Procurement · Business and decision documents · 2018-03-13 · PRJ-B-003-WBS-PR-01 · PRJ-B-003-BL-PR-B01

    Establish the controlled purchase order / contract and scope of supply needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-PR-006

    Supplier Quality and Inspection Plan

    PRJ-B-003 · Procurement · Plans · 2018-03-23 · PRJ-B-003-WBS-PR-02 · PRJ-B-003-BL-PR-B01

    Establish the controlled supplier quality and inspection plan needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-PR-007

    Vendor Data, Submittal, and RFI Register

    PRJ-B-003 · Procurement · Registers and indexes · 2018-04-01 · PRJ-B-003-WBS-PR-03 · PRJ-B-003-BL-PR-B01

    Establish the controlled vendor data, submittal, and rfi register needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-PR-008

    Expediting and Logistics Plan

    PRJ-B-003 · Procurement · Plans · 2018-04-10 · PRJ-B-003-WBS-PR-04 · PRJ-B-003-BL-PR-B01

    Establish the controlled expediting and logistics plan needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-PR-009

    Factory Acceptance Test Procedure and Report

    PRJ-B-003 · Procurement · Procedures · 2018-04-20 · PRJ-B-003-WBS-PR-01 · PRJ-B-003-BL-PR-B01

    Establish the controlled factory acceptance test procedure and report needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-FC-001

    Construction / Fabrication Execution Plan

    PRJ-B-003 · Fabrication / Construction · Plans · 2018-05-04 · PRJ-B-003-WBS-FC-01 · PRJ-B-003-BL-FC-B01

    Establish the controlled construction / fabrication execution plan needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-FC-002

    Site Logistics, Safety, and Permit Plan

    PRJ-B-003 · Fabrication / Construction · Plans · 2018-05-18 · PRJ-B-003-WBS-FC-02 · PRJ-B-003-BL-FC-B01

    Establish the controlled site logistics, safety, and permit plan needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-FC-003

    Fabrication Drawing and Shop Package

    PRJ-B-003 · Fabrication / Construction · Design definitions · 2018-06-01 · PRJ-B-003-WBS-FC-03 · PRJ-B-003-BL-FC-B01

    Establish the controlled fabrication drawing and shop package needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-FC-004

    Field Work Package and Installation Method

    PRJ-B-003 · Fabrication / Construction · Procedures · 2018-06-15 · PRJ-B-003-WBS-FC-04 · PRJ-B-003-BL-FC-B01

    Establish the controlled field work package and installation method needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-FC-005

    Inspection and Test Plan / Quality Records

    PRJ-B-003 · Fabrication / Construction · Plans · 2018-06-29 · PRJ-B-003-WBS-FC-01 · PRJ-B-003-BL-FC-B01

    Establish the controlled inspection and test plan / quality records needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-FC-006

    Daily Progress and Quantity Report

    PRJ-B-003 · Fabrication / Construction · Records and logs · 2018-07-13 · PRJ-B-003-WBS-FC-02 · PRJ-B-003-BL-FC-B01

    Establish the controlled daily progress and quantity report needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-FC-007

    Nonconformity and Corrective Action Record

    PRJ-B-003 · Fabrication / Construction · Records and logs · 2018-07-27 · PRJ-B-003-WBS-FC-03 · PRJ-B-003-BL-FC-B01

    Establish the controlled nonconformity and corrective action record needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-FC-008

    Redline Drawing and Field Change Register

    PRJ-B-003 · Fabrication / Construction · Registers and indexes · 2018-08-10 · PRJ-B-003-WBS-FC-04 · PRJ-B-003-BL-FC-B01

    Establish the controlled redline drawing and field change register needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-FC-009

    Mechanical Completion Certificate and Punch List

    PRJ-B-003 · Fabrication / Construction · Certificates and approvals · 2018-08-24 · PRJ-B-003-WBS-FC-01 · PRJ-B-003-BL-FC-B01

    Establish the controlled mechanical completion certificate and punch list needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-IN-001

    System Coordination and Interface Plan

    PRJ-B-003 · Installation and Interface Coordination · Plans · 2018-09-02 · PRJ-B-003-WBS-IN-01 · PRJ-B-003-BL-IN-B01

    Establish the controlled system coordination and interface plan needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-IN-002

    Installation Completion and Walkdown Record

    PRJ-B-003 · Installation and Interface Coordination · Records and logs · 2018-09-11 · PRJ-B-003-WBS-IN-02 · PRJ-B-003-BL-IN-B01

    Establish the controlled installation completion and walkdown record needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-IN-003

    Controls / Software Configuration Baseline

    PRJ-B-003 · Installation and Interface Coordination · Baselines and manifests · 2018-09-20 · PRJ-B-003-WBS-IN-03 · PRJ-B-003-BL-IN-B01

    Establish the controlled controls / software configuration baseline needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-IN-004

    Loop Check, Continuity, and Calibration Records

    PRJ-B-003 · Installation and Interface Coordination · Records and logs · 2018-09-29 · PRJ-B-003-WBS-IN-04 · PRJ-B-003-BL-IN-B01

    Establish the controlled loop check, continuity, and calibration records needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-IN-005

    Cleaning, Flushing, and Pre-Operational Test Record

    PRJ-B-003 · Installation and Interface Coordination · Procedures · 2018-10-08 · PRJ-B-003-WBS-IN-01 · PRJ-B-003-BL-IN-B01

    Establish the controlled cleaning, flushing, and pre-operational test record needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-IN-006

    System Completion Dossier

    PRJ-B-003 · Installation and Interface Coordination · Dossiers and manual sets · 2018-10-17 · PRJ-B-003-WBS-IN-02 · PRJ-B-003-BL-IN-B01

    Establish the controlled system completion dossier needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-IN-007

    Ready-for-Commissioning Certificate

    PRJ-B-003 · Installation and Interface Coordination · Certificates and approvals · 2018-10-26 · PRJ-B-003-WBS-IN-03 · PRJ-B-003-BL-IN-B01

    Establish the controlled ready-for-commissioning certificate needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-CS-001

    Commissioning and Startup Plan

    PRJ-B-003 · Commissioning / Startup · Plans · 2018-11-03 · PRJ-B-003-WBS-CS-01 · PRJ-B-003-BL-CS-B01

    Establish the controlled commissioning and startup plan needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-CS-002

    Pre-Startup Safety / Operational Readiness Review

    PRJ-B-003 · Commissioning / Startup · Reports · 2018-11-12 · PRJ-B-003-WBS-CS-02 · PRJ-B-003-BL-CS-B01

    Establish the controlled pre-startup safety / operational readiness review needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-CS-003

    Commissioning Procedure and Results

    PRJ-B-003 · Commissioning / Startup · Procedures · 2018-11-20 · PRJ-B-003-WBS-CS-03 · PRJ-B-003-BL-CS-B01

    Establish the controlled commissioning procedure and results needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-CS-004

    Startup and Ramp-Up Log

    PRJ-B-003 · Commissioning / Startup · Registers and indexes · 2018-11-29 · PRJ-B-003-WBS-CS-04 · PRJ-B-003-BL-CS-B01

    Establish the controlled startup and ramp-up log needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-CS-005

    Performance Guarantee and Capacity Test Report

    PRJ-B-003 · Commissioning / Startup · Studies and analyses · 2018-12-07 · PRJ-B-003-WBS-CS-01 · PRJ-B-003-BL-CS-B01

    Establish the controlled performance guarantee and capacity test report needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-CS-006

    Reliability Demonstration Run Report

    PRJ-B-003 · Commissioning / Startup · Studies and analyses · 2018-12-16 · PRJ-B-003-WBS-CS-02 · PRJ-B-003-BL-CS-B01

    Establish the controlled reliability demonstration run report needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-CS-007

    Operator and Maintainer Training Record

    PRJ-B-003 · Commissioning / Startup · Records and logs · 2018-12-24 · PRJ-B-003-WBS-CS-03 · PRJ-B-003-BL-CS-B01

    Establish the controlled operator and maintainer training record needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-CS-008

    Commissioning Anomaly and Punch Closure Register

    PRJ-B-003 · Commissioning / Startup · Registers and indexes · 2019-01-02 · PRJ-B-003-WBS-CS-04 · PRJ-B-003-BL-CS-B01

    Establish the controlled commissioning anomaly and punch closure register needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-CS-009

    Performance Acceptance Certificate

    PRJ-B-003 · Commissioning / Startup · Certificates and approvals · 2019-01-11 · PRJ-B-003-WBS-CS-01 · PRJ-B-003-BL-CS-B01

    Establish the controlled performance acceptance certificate needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-OT-001

    As-Built / as-Configured Baseline Manifest

    PRJ-B-003 · Operational Turnover / Closeout · Baselines and manifests · 2019-01-17 · PRJ-B-003-WBS-OT-01 · PRJ-B-003-BL-OT-B01

    Establish the controlled as-built / as-configured baseline manifest needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-OT-002

    Operations and Maintenance Manual Set

    PRJ-B-003 · Operational Turnover / Closeout · Dossiers and manual sets · 2019-01-23 · PRJ-B-003-WBS-OT-02 · PRJ-B-003-BL-OT-B01

    Establish the controlled operations and maintenance manual set needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-OT-003

    Asset, Spare Parts, and Warranty Register

    PRJ-B-003 · Operational Turnover / Closeout · Registers and indexes · 2019-01-29 · PRJ-B-003-WBS-OT-03 · PRJ-B-003-BL-OT-B01

    Establish the controlled asset, spare parts, and warranty register needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-OT-004

    Final Technical and Commercial Acceptance Certificate

    PRJ-B-003 · Operational Turnover / Closeout · Certificates and approvals · 2019-02-04 · PRJ-B-003-WBS-OT-04 · PRJ-B-003-BL-OT-B01

    Establish the controlled final technical and commercial acceptance certificate needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-OT-005

    Operational Turnover Dossier and Ownership Transfer

    PRJ-B-003 · Operational Turnover / Closeout · Dossiers and manual sets · 2019-02-10 · PRJ-B-003-WBS-OT-01 · PRJ-B-003-BL-OT-B01

    Establish the controlled operational turnover dossier and ownership transfer needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-OT-006

    Final Cost, Schedule, Contract, and Claims Closeout

    PRJ-B-003 · Operational Turnover / Closeout · Studies and analyses · 2019-02-16 · PRJ-B-003-WBS-OT-02 · PRJ-B-003-BL-OT-B01

    Establish the controlled final cost, schedule, contract, and claims closeout needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-OT-007

    Controlled Records Archive and Retrieval Index

    PRJ-B-003 · Operational Turnover / Closeout · Registers and indexes · 2019-02-22 · PRJ-B-003-WBS-OT-03 · PRJ-B-003-BL-OT-B01

    Establish the controlled controlled records archive and retrieval index needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-003-SE-OT-008

    Lessons Learned and Benefit Realization Baseline

    PRJ-B-003 · Operational Turnover / Closeout · Baselines and manifests · 2019-02-28 · PRJ-B-003-WBS-OT-04 · PRJ-B-003-BL-OT-B01

    Establish the controlled lessons learned and benefit realization baseline needed to execute Rice Bran Extract Meat-Analogue Platform Extension during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Meat-analogue application platform within PRJ-B-003 - Rice Bran Extract Meat-Analogue Platform Extension. The project scope is: Meat-analogue product requirements, formulation design, process compatibility, pilot trials, texture and juiciness validation, scale-up, release specifications, and application-team handover. Operational product-development platform with released formulations and repeatable performance across selected meat-analogue formats.

  • PRJ-B-004-SE-F1-001

    Business Case and Opportunity Statement

    PRJ-B-004 · FEL 1 / Concept · Business and decision documents · 2014-09-12 · PRJ-B-004-WBS-F1-01 · PRJ-B-004-BL-F1-B01

    Establish the controlled business case and opportunity statement needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F1-002

    Project Charter and Initial Scope / Battery Limits

    PRJ-B-004 · FEL 1 / Concept · Business and decision documents · 2014-09-24 · PRJ-B-004-WBS-F1-02 · PRJ-B-004-BL-F1-B01

    Establish the controlled project charter and initial scope / battery limits needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F1-003

    Stakeholder Needs and Operating Context

    PRJ-B-004 · FEL 1 / Concept · Reports · 2014-10-06 · PRJ-B-004-WBS-F1-03 · PRJ-B-004-BL-F1-B01

    Establish the controlled stakeholder needs and operating context needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F1-004

    Concept Alternatives and Screening Study

    PRJ-B-004 · FEL 1 / Concept · Studies and analyses · 2014-10-18 · PRJ-B-004-WBS-F1-04 · PRJ-B-004-BL-F1-B01

    Establish the controlled concept alternatives and screening study needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F1-005

    Preliminary Schedule and Class 5 Cost Estimate

    PRJ-B-004 · FEL 1 / Concept · Studies and analyses · 2014-10-30 · PRJ-B-004-WBS-F1-01 · PRJ-B-004-BL-F1-B01

    Establish the controlled preliminary schedule and class 5 cost estimate needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F1-006

    Initial Risk, Assumption, and Decision Register

    PRJ-B-004 · FEL 1 / Concept · Registers and indexes · 2014-11-11 · PRJ-B-004-WBS-F1-02 · PRJ-B-004-BL-F1-B01

    Establish the controlled initial risk, assumption, and decision register needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F2-001

    Option Study and Weighted Decision Analysis

    PRJ-B-004 · FEL 2 / Select · Studies and analyses · 2014-11-23 · PRJ-B-004-WBS-F2-01 · PRJ-B-004-BL-F2-B01

    Establish the controlled option study and weighted decision analysis needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F2-002

    Design Basis Memorandum

    PRJ-B-004 · FEL 2 / Select · Design definitions · 2014-12-06 · PRJ-B-004-WBS-F2-02 · PRJ-B-004-BL-F2-B01

    Establish the controlled design basis memorandum needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F2-003

    Site, Layout, and Process Alternative Study

    PRJ-B-004 · FEL 2 / Select · Studies and analyses · 2014-12-19 · PRJ-B-004-WBS-F2-03 · PRJ-B-004-BL-F2-B01

    Establish the controlled site, layout, and process alternative study needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F2-004

    Stakeholder and System Requirements Specification

    PRJ-B-004 · FEL 2 / Select · Specifications · 2015-01-01 · PRJ-B-004-WBS-F2-04 · PRJ-B-004-BL-F2-B01

    Establish the controlled stakeholder and system requirements specification needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F2-005

    Concept Architecture and Interface Definition

    PRJ-B-004 · FEL 2 / Select · Design definitions · 2015-01-14 · PRJ-B-004-WBS-F2-01 · PRJ-B-004-BL-F2-B01

    Establish the controlled concept architecture and interface definition needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F2-006

    HAZID / Constructability / Operability Study

    PRJ-B-004 · FEL 2 / Select · Studies and analyses · 2015-01-27 · PRJ-B-004-WBS-F2-02 · PRJ-B-004-BL-F2-B01

    Establish the controlled hazid / constructability / operability study needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F2-007

    Class 4 Estimate and Level 2 Schedule

    PRJ-B-004 · FEL 2 / Select · Studies and analyses · 2015-02-09 · PRJ-B-004-WBS-F2-03 · PRJ-B-004-BL-F2-B01

    Establish the controlled class 4 estimate and level 2 schedule needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F2-008

    Selected Concept and G2 Decision Dossier

    PRJ-B-004 · FEL 2 / Select · Dossiers and manual sets · 2015-02-22 · PRJ-B-004-WBS-F2-04 · PRJ-B-004-BL-F2-B01

    Establish the controlled selected concept and g2 decision dossier needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F3-001

    Defined Scope and Design Deliverables Register

    PRJ-B-004 · FEL 3 / Define · Registers and indexes · 2015-03-07 · PRJ-B-004-WBS-F3-01 · PRJ-B-004-BL-F3-B01

    Establish the controlled defined scope and design deliverables register needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F3-002

    Baselined System Requirements Specification

    PRJ-B-004 · FEL 3 / Define · Specifications · 2015-03-20 · PRJ-B-004-WBS-F3-02 · PRJ-B-004-BL-F3-B01

    Establish the controlled baselined system requirements specification needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F3-003

    System Architecture and Interface Control Document

    PRJ-B-004 · FEL 3 / Define · Design definitions · 2015-04-03 · PRJ-B-004-WBS-F3-03 · PRJ-B-004-BL-F3-B01

    Establish the controlled system architecture and interface control document needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F3-004

    Project Execution Plan

    PRJ-B-004 · FEL 3 / Define · Plans · 2015-04-16 · PRJ-B-004-WBS-F3-04 · PRJ-B-004-BL-F3-B01

    Establish the controlled project execution plan needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F3-005

    WBS, Work Package, and Responsibility Baseline

    PRJ-B-004 · FEL 3 / Define · Baselines and manifests · 2015-04-30 · PRJ-B-004-WBS-F3-01 · PRJ-B-004-BL-F3-B01

    Establish the controlled wbs, work package, and responsibility baseline needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F3-006

    Class 3 Estimate and Cost Baseline

    PRJ-B-004 · FEL 3 / Define · Baselines and manifests · 2015-05-13 · PRJ-B-004-WBS-F3-02 · PRJ-B-004-BL-F3-B01

    Establish the controlled class 3 estimate and cost baseline needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F3-007

    Coordinated Control Schedule and Resource Plan

    PRJ-B-004 · FEL 3 / Define · Plans · 2015-05-26 · PRJ-B-004-WBS-F3-03 · PRJ-B-004-BL-F3-B01

    Establish the controlled coordinated control schedule and resource plan needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F3-008

    Procurement and Contracting Plan

    PRJ-B-004 · FEL 3 / Define · Plans · 2015-06-09 · PRJ-B-004-WBS-F3-04 · PRJ-B-004-BL-F3-B01

    Establish the controlled procurement and contracting plan needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F3-009

    V&V, Acceptance, Commissioning, and Turnover Strategy

    PRJ-B-004 · FEL 3 / Define · Plans · 2015-06-22 · PRJ-B-004-WBS-F3-01 · PRJ-B-004-BL-F3-B01

    Establish the controlled v&v, acceptance, commissioning, and turnover strategy needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F3-010

    FID / G3 Approval and Baseline Manifest

    PRJ-B-004 · FEL 3 / Define · Certificates and approvals · 2015-07-06 · PRJ-B-004-WBS-F3-02 · PRJ-B-004-BL-F3-B01

    Establish the controlled fid / g3 approval and baseline manifest needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-DD-001

    Detailed Design Management Plan

    PRJ-B-004 · Detailed Design · Plans · 2015-07-19 · PRJ-B-004-WBS-DD-01 · PRJ-B-004-BL-DD-B01

    Establish the controlled detailed design management plan needed to execute Continuous Fermentation Natural Curing-Agent Process during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-DD-002

    Process / Functional Design Package

    PRJ-B-004 · Detailed Design · Design definitions · 2015-08-01 · PRJ-B-004-WBS-DD-02 · PRJ-B-004-BL-DD-B01

    Establish the controlled process / functional design package needed to execute Continuous Fermentation Natural Curing-Agent Process during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-DD-003

    Mechanical and Piping Design Package

    PRJ-B-004 · Detailed Design · Design definitions · 2015-08-15 · PRJ-B-004-WBS-DD-03 · PRJ-B-004-BL-DD-B01

    Establish the controlled mechanical and piping design package needed to execute Continuous Fermentation Natural Curing-Agent Process during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-DD-004

    Electrical Power and Controls Design Package

    PRJ-B-004 · Detailed Design · Design definitions · 2015-08-28 · PRJ-B-004-WBS-DD-04 · PRJ-B-004-BL-DD-B01

    Establish the controlled electrical power and controls design package needed to execute Continuous Fermentation Natural Curing-Agent Process during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-DD-005

    Civil, Structural, and Architectural Design Package

    PRJ-B-004 · Detailed Design · Design definitions · 2015-09-11 · PRJ-B-004-WBS-DD-01 · PRJ-B-004-BL-DD-B01

    Establish the controlled civil, structural, and architectural design package needed to execute Continuous Fermentation Natural Curing-Agent Process during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-DD-006

    Instrumentation, Automation, and Data Design Package

    PRJ-B-004 · Detailed Design · Design definitions · 2015-09-24 · PRJ-B-004-WBS-DD-02 · PRJ-B-004-BL-DD-B01

    Establish the controlled instrumentation, automation, and data design package needed to execute Continuous Fermentation Natural Curing-Agent Process during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-DD-007

    Safety, Reliability, and Maintainability Analysis

    PRJ-B-004 · Detailed Design · Studies and analyses · 2015-10-07 · PRJ-B-004-WBS-DD-03 · PRJ-B-004-BL-DD-B01

    Establish the controlled safety, reliability, and maintainability analysis needed to execute Continuous Fermentation Natural Curing-Agent Process during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-DD-008

    Design Review and Comment Resolution Record

    PRJ-B-004 · Detailed Design · Records and logs · 2015-10-21 · PRJ-B-004-WBS-DD-04 · PRJ-B-004-BL-DD-B01

    Establish the controlled design review and comment resolution record needed to execute Continuous Fermentation Natural Curing-Agent Process during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-DD-009

    Issued-for-Construction Design Baseline

    PRJ-B-004 · Detailed Design · Baselines and manifests · 2015-11-03 · PRJ-B-004-WBS-DD-01 · PRJ-B-004-BL-DD-B01

    Establish the controlled issued-for-construction design baseline needed to execute Continuous Fermentation Natural Curing-Agent Process during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-DD-010

    Design V&V Evidence Index

    PRJ-B-004 · Detailed Design · Registers and indexes · 2015-11-17 · PRJ-B-004-WBS-DD-02 · PRJ-B-004-BL-DD-B01

    Establish the controlled design v&v evidence index needed to execute Continuous Fermentation Natural Curing-Agent Process during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-PR-001

    Procurement Package and Bid List

    PRJ-B-004 · Procurement · Registers and indexes · 2015-11-30 · PRJ-B-004-WBS-PR-01 · PRJ-B-004-BL-PR-B01

    Establish the controlled procurement package and bid list needed to execute Continuous Fermentation Natural Curing-Agent Process during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-PR-002

    Technical Requisition and Datasheet Set

    PRJ-B-004 · Procurement · Specifications · 2015-12-14 · PRJ-B-004-WBS-PR-02 · PRJ-B-004-BL-PR-B01

    Establish the controlled technical requisition and datasheet set needed to execute Continuous Fermentation Natural Curing-Agent Process during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-PR-003

    Commercial Bid Evaluation and Award Recommendation

    PRJ-B-004 · Procurement · Studies and analyses · 2015-12-28 · PRJ-B-004-WBS-PR-03 · PRJ-B-004-BL-PR-B01

    Establish the controlled commercial bid evaluation and award recommendation needed to execute Continuous Fermentation Natural Curing-Agent Process during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-PR-004

    Technical Bid Evaluation and Clarification Log

    PRJ-B-004 · Procurement · Registers and indexes · 2016-01-11 · PRJ-B-004-WBS-PR-04 · PRJ-B-004-BL-PR-B01

    Establish the controlled technical bid evaluation and clarification log needed to execute Continuous Fermentation Natural Curing-Agent Process during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-PR-005

    Purchase Order / Contract and Scope of Supply

    PRJ-B-004 · Procurement · Business and decision documents · 2016-01-24 · PRJ-B-004-WBS-PR-01 · PRJ-B-004-BL-PR-B01

    Establish the controlled purchase order / contract and scope of supply needed to execute Continuous Fermentation Natural Curing-Agent Process during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-PR-006

    Supplier Quality and Inspection Plan

    PRJ-B-004 · Procurement · Plans · 2016-02-07 · PRJ-B-004-WBS-PR-02 · PRJ-B-004-BL-PR-B01

    Establish the controlled supplier quality and inspection plan needed to execute Continuous Fermentation Natural Curing-Agent Process during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-PR-007

    Vendor Data, Submittal, and RFI Register

    PRJ-B-004 · Procurement · Registers and indexes · 2016-02-21 · PRJ-B-004-WBS-PR-03 · PRJ-B-004-BL-PR-B01

    Establish the controlled vendor data, submittal, and rfi register needed to execute Continuous Fermentation Natural Curing-Agent Process during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-PR-008

    Expediting and Logistics Plan

    PRJ-B-004 · Procurement · Plans · 2016-03-06 · PRJ-B-004-WBS-PR-04 · PRJ-B-004-BL-PR-B01

    Establish the controlled expediting and logistics plan needed to execute Continuous Fermentation Natural Curing-Agent Process during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-PR-009

    Factory Acceptance Test Procedure and Report

    PRJ-B-004 · Procurement · Procedures · 2016-03-20 · PRJ-B-004-WBS-PR-01 · PRJ-B-004-BL-PR-B01

    Establish the controlled factory acceptance test procedure and report needed to execute Continuous Fermentation Natural Curing-Agent Process during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-FC-001

    Construction / Fabrication Execution Plan

    PRJ-B-004 · Fabrication / Construction · Plans · 2016-04-09 · PRJ-B-004-WBS-FC-01 · PRJ-B-004-BL-FC-B01

    Establish the controlled construction / fabrication execution plan needed to execute Continuous Fermentation Natural Curing-Agent Process during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-FC-002

    Site Logistics, Safety, and Permit Plan

    PRJ-B-004 · Fabrication / Construction · Plans · 2016-04-30 · PRJ-B-004-WBS-FC-02 · PRJ-B-004-BL-FC-B01

    Establish the controlled site logistics, safety, and permit plan needed to execute Continuous Fermentation Natural Curing-Agent Process during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-FC-003

    Fabrication Drawing and Shop Package

    PRJ-B-004 · Fabrication / Construction · Design definitions · 2016-05-21 · PRJ-B-004-WBS-FC-03 · PRJ-B-004-BL-FC-B01

    Establish the controlled fabrication drawing and shop package needed to execute Continuous Fermentation Natural Curing-Agent Process during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-FC-004

    Field Work Package and Installation Method

    PRJ-B-004 · Fabrication / Construction · Procedures · 2016-06-10 · PRJ-B-004-WBS-FC-04 · PRJ-B-004-BL-FC-B01

    Establish the controlled field work package and installation method needed to execute Continuous Fermentation Natural Curing-Agent Process during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-FC-005

    Inspection and Test Plan / Quality Records

    PRJ-B-004 · Fabrication / Construction · Plans · 2016-07-01 · PRJ-B-004-WBS-FC-01 · PRJ-B-004-BL-FC-B01

    Establish the controlled inspection and test plan / quality records needed to execute Continuous Fermentation Natural Curing-Agent Process during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-FC-006

    Daily Progress and Quantity Report

    PRJ-B-004 · Fabrication / Construction · Records and logs · 2016-07-22 · PRJ-B-004-WBS-FC-02 · PRJ-B-004-BL-FC-B01

    Establish the controlled daily progress and quantity report needed to execute Continuous Fermentation Natural Curing-Agent Process during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-FC-007

    Nonconformity and Corrective Action Record

    PRJ-B-004 · Fabrication / Construction · Records and logs · 2016-08-11 · PRJ-B-004-WBS-FC-03 · PRJ-B-004-BL-FC-B01

    Establish the controlled nonconformity and corrective action record needed to execute Continuous Fermentation Natural Curing-Agent Process during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-FC-008

    Redline Drawing and Field Change Register

    PRJ-B-004 · Fabrication / Construction · Registers and indexes · 2016-09-01 · PRJ-B-004-WBS-FC-04 · PRJ-B-004-BL-FC-B01

    Establish the controlled redline drawing and field change register needed to execute Continuous Fermentation Natural Curing-Agent Process during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-FC-009

    Mechanical Completion Certificate and Punch List

    PRJ-B-004 · Fabrication / Construction · Certificates and approvals · 2016-09-22 · PRJ-B-004-WBS-FC-01 · PRJ-B-004-BL-FC-B01

    Establish the controlled mechanical completion certificate and punch list needed to execute Continuous Fermentation Natural Curing-Agent Process during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-IN-001

    System Coordination and Interface Plan

    PRJ-B-004 · Installation and Interface Coordination · Plans · 2016-10-05 · PRJ-B-004-WBS-IN-01 · PRJ-B-004-BL-IN-B01

    Establish the controlled system coordination and interface plan needed to execute Continuous Fermentation Natural Curing-Agent Process during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-IN-002

    Installation Completion and Walkdown Record

    PRJ-B-004 · Installation and Interface Coordination · Records and logs · 2016-10-18 · PRJ-B-004-WBS-IN-02 · PRJ-B-004-BL-IN-B01

    Establish the controlled installation completion and walkdown record needed to execute Continuous Fermentation Natural Curing-Agent Process during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-IN-003

    Controls / Software Configuration Baseline

    PRJ-B-004 · Installation and Interface Coordination · Baselines and manifests · 2016-10-31 · PRJ-B-004-WBS-IN-03 · PRJ-B-004-BL-IN-B01

    Establish the controlled controls / software configuration baseline needed to execute Continuous Fermentation Natural Curing-Agent Process during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-IN-004

    Loop Check, Continuity, and Calibration Records

    PRJ-B-004 · Installation and Interface Coordination · Records and logs · 2016-11-14 · PRJ-B-004-WBS-IN-04 · PRJ-B-004-BL-IN-B01

    Establish the controlled loop check, continuity, and calibration records needed to execute Continuous Fermentation Natural Curing-Agent Process during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-IN-005

    Cleaning, Flushing, and Pre-Operational Test Record

    PRJ-B-004 · Installation and Interface Coordination · Procedures · 2016-11-27 · PRJ-B-004-WBS-IN-01 · PRJ-B-004-BL-IN-B01

    Establish the controlled cleaning, flushing, and pre-operational test record needed to execute Continuous Fermentation Natural Curing-Agent Process during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-IN-006

    System Completion Dossier

    PRJ-B-004 · Installation and Interface Coordination · Dossiers and manual sets · 2016-12-10 · PRJ-B-004-WBS-IN-02 · PRJ-B-004-BL-IN-B01

    Establish the controlled system completion dossier needed to execute Continuous Fermentation Natural Curing-Agent Process during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-IN-007

    Ready-for-Commissioning Certificate

    PRJ-B-004 · Installation and Interface Coordination · Certificates and approvals · 2016-12-24 · PRJ-B-004-WBS-IN-03 · PRJ-B-004-BL-IN-B01

    Establish the controlled ready-for-commissioning certificate needed to execute Continuous Fermentation Natural Curing-Agent Process during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-CS-001

    Commissioning and Startup Plan

    PRJ-B-004 · Commissioning / Startup · Plans · 2017-01-05 · PRJ-B-004-WBS-CS-01 · PRJ-B-004-BL-CS-B01

    Establish the controlled commissioning and startup plan needed to execute Continuous Fermentation Natural Curing-Agent Process during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-CS-002

    Pre-Startup Safety / Operational Readiness Review

    PRJ-B-004 · Commissioning / Startup · Reports · 2017-01-18 · PRJ-B-004-WBS-CS-02 · PRJ-B-004-BL-CS-B01

    Establish the controlled pre-startup safety / operational readiness review needed to execute Continuous Fermentation Natural Curing-Agent Process during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-CS-003

    Commissioning Procedure and Results

    PRJ-B-004 · Commissioning / Startup · Procedures · 2017-01-31 · PRJ-B-004-WBS-CS-03 · PRJ-B-004-BL-CS-B01

    Establish the controlled commissioning procedure and results needed to execute Continuous Fermentation Natural Curing-Agent Process during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-CS-004

    Startup and Ramp-Up Log

    PRJ-B-004 · Commissioning / Startup · Registers and indexes · 2017-02-12 · PRJ-B-004-WBS-CS-04 · PRJ-B-004-BL-CS-B01

    Establish the controlled startup and ramp-up log needed to execute Continuous Fermentation Natural Curing-Agent Process during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-CS-005

    Performance Guarantee and Capacity Test Report

    PRJ-B-004 · Commissioning / Startup · Studies and analyses · 2017-02-25 · PRJ-B-004-WBS-CS-01 · PRJ-B-004-BL-CS-B01

    Establish the controlled performance guarantee and capacity test report needed to execute Continuous Fermentation Natural Curing-Agent Process during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-CS-006

    Reliability Demonstration Run Report

    PRJ-B-004 · Commissioning / Startup · Studies and analyses · 2017-03-10 · PRJ-B-004-WBS-CS-02 · PRJ-B-004-BL-CS-B01

    Establish the controlled reliability demonstration run report needed to execute Continuous Fermentation Natural Curing-Agent Process during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-CS-007

    Operator and Maintainer Training Record

    PRJ-B-004 · Commissioning / Startup · Records and logs · 2017-03-22 · PRJ-B-004-WBS-CS-03 · PRJ-B-004-BL-CS-B01

    Establish the controlled operator and maintainer training record needed to execute Continuous Fermentation Natural Curing-Agent Process during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-CS-008

    Commissioning Anomaly and Punch Closure Register

    PRJ-B-004 · Commissioning / Startup · Registers and indexes · 2017-04-04 · PRJ-B-004-WBS-CS-04 · PRJ-B-004-BL-CS-B01

    Establish the controlled commissioning anomaly and punch closure register needed to execute Continuous Fermentation Natural Curing-Agent Process during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-CS-009

    Performance Acceptance Certificate

    PRJ-B-004 · Commissioning / Startup · Certificates and approvals · 2017-04-17 · PRJ-B-004-WBS-CS-01 · PRJ-B-004-BL-CS-B01

    Establish the controlled performance acceptance certificate needed to execute Continuous Fermentation Natural Curing-Agent Process during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-OT-001

    As-Built / as-Configured Baseline Manifest

    PRJ-B-004 · Operational Turnover / Closeout · Baselines and manifests · 2017-04-26 · PRJ-B-004-WBS-OT-01 · PRJ-B-004-BL-OT-B01

    Establish the controlled as-built / as-configured baseline manifest needed to execute Continuous Fermentation Natural Curing-Agent Process during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-OT-002

    Operations and Maintenance Manual Set

    PRJ-B-004 · Operational Turnover / Closeout · Dossiers and manual sets · 2017-05-05 · PRJ-B-004-WBS-OT-02 · PRJ-B-004-BL-OT-B01

    Establish the controlled operations and maintenance manual set needed to execute Continuous Fermentation Natural Curing-Agent Process during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-OT-003

    Asset, Spare Parts, and Warranty Register

    PRJ-B-004 · Operational Turnover / Closeout · Registers and indexes · 2017-05-14 · PRJ-B-004-WBS-OT-03 · PRJ-B-004-BL-OT-B01

    Establish the controlled asset, spare parts, and warranty register needed to execute Continuous Fermentation Natural Curing-Agent Process during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-OT-004

    Final Technical and Commercial Acceptance Certificate

    PRJ-B-004 · Operational Turnover / Closeout · Certificates and approvals · 2017-05-24 · PRJ-B-004-WBS-OT-04 · PRJ-B-004-BL-OT-B01

    Establish the controlled final technical and commercial acceptance certificate needed to execute Continuous Fermentation Natural Curing-Agent Process during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-OT-005

    Operational Turnover Dossier and Ownership Transfer

    PRJ-B-004 · Operational Turnover / Closeout · Dossiers and manual sets · 2017-06-02 · PRJ-B-004-WBS-OT-01 · PRJ-B-004-BL-OT-B01

    Establish the controlled operational turnover dossier and ownership transfer needed to execute Continuous Fermentation Natural Curing-Agent Process during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-OT-006

    Final Cost, Schedule, Contract, and Claims Closeout

    PRJ-B-004 · Operational Turnover / Closeout · Studies and analyses · 2017-06-11 · PRJ-B-004-WBS-OT-02 · PRJ-B-004-BL-OT-B01

    Establish the controlled final cost, schedule, contract, and claims closeout needed to execute Continuous Fermentation Natural Curing-Agent Process during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-OT-007

    Controlled Records Archive and Retrieval Index

    PRJ-B-004 · Operational Turnover / Closeout · Registers and indexes · 2017-06-20 · PRJ-B-004-WBS-OT-03 · PRJ-B-004-BL-OT-B01

    Establish the controlled controlled records archive and retrieval index needed to execute Continuous Fermentation Natural Curing-Agent Process during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-OT-008

    Lessons Learned and Benefit Realization Baseline

    PRJ-B-004 · Operational Turnover / Closeout · Baselines and manifests · 2017-06-30 · PRJ-B-004-WBS-OT-04 · PRJ-B-004-BL-OT-B01

    Establish the controlled lessons learned and benefit realization baseline needed to execute Continuous Fermentation Natural Curing-Agent Process during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-005-SE-F1-001

    Business Case and Opportunity Statement

    PRJ-B-005 · FEL 1 / Concept · Business and decision documents · 2012-06-06 · PRJ-B-005-WBS-F1-01 · PRJ-B-005-BL-F1-B01

    Establish the controlled business case and opportunity statement needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F1-002

    Project Charter and Initial Scope / Battery Limits

    PRJ-B-005 · FEL 1 / Concept · Business and decision documents · 2012-06-13 · PRJ-B-005-WBS-F1-02 · PRJ-B-005-BL-F1-B01

    Establish the controlled project charter and initial scope / battery limits needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F1-003

    Stakeholder Needs and Operating Context

    PRJ-B-005 · FEL 1 / Concept · Reports · 2012-06-20 · PRJ-B-005-WBS-F1-03 · PRJ-B-005-BL-F1-B01

    Establish the controlled stakeholder needs and operating context needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F1-004

    Concept Alternatives and Screening Study

    PRJ-B-005 · FEL 1 / Concept · Studies and analyses · 2012-06-27 · PRJ-B-005-WBS-F1-04 · PRJ-B-005-BL-F1-B01

    Establish the controlled concept alternatives and screening study needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F1-005

    Preliminary Schedule and Class 5 Cost Estimate

    PRJ-B-005 · FEL 1 / Concept · Studies and analyses · 2012-07-04 · PRJ-B-005-WBS-F1-01 · PRJ-B-005-BL-F1-B01

    Establish the controlled preliminary schedule and class 5 cost estimate needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F1-006

    Initial Risk, Assumption, and Decision Register

    PRJ-B-005 · FEL 1 / Concept · Registers and indexes · 2012-07-11 · PRJ-B-005-WBS-F1-02 · PRJ-B-005-BL-F1-B01

    Establish the controlled initial risk, assumption, and decision register needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F2-001

    Option Study and Weighted Decision Analysis

    PRJ-B-005 · FEL 2 / Select · Studies and analyses · 2012-07-18 · PRJ-B-005-WBS-F2-01 · PRJ-B-005-BL-F2-B01

    Establish the controlled option study and weighted decision analysis needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F2-002

    Design Basis Memorandum

    PRJ-B-005 · FEL 2 / Select · Design definitions · 2012-07-25 · PRJ-B-005-WBS-F2-02 · PRJ-B-005-BL-F2-B01

    Establish the controlled design basis memorandum needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F2-003

    Site, Layout, and Process Alternative Study

    PRJ-B-005 · FEL 2 / Select · Studies and analyses · 2012-08-01 · PRJ-B-005-WBS-F2-03 · PRJ-B-005-BL-F2-B01

    Establish the controlled site, layout, and process alternative study needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F2-004

    Stakeholder and System Requirements Specification

    PRJ-B-005 · FEL 2 / Select · Specifications · 2012-08-09 · PRJ-B-005-WBS-F2-04 · PRJ-B-005-BL-F2-B01

    Establish the controlled stakeholder and system requirements specification needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F2-005

    Concept Architecture and Interface Definition

    PRJ-B-005 · FEL 2 / Select · Design definitions · 2012-08-16 · PRJ-B-005-WBS-F2-01 · PRJ-B-005-BL-F2-B01

    Establish the controlled concept architecture and interface definition needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F2-006

    HAZID / Constructability / Operability Study

    PRJ-B-005 · FEL 2 / Select · Studies and analyses · 2012-08-23 · PRJ-B-005-WBS-F2-02 · PRJ-B-005-BL-F2-B01

    Establish the controlled hazid / constructability / operability study needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F2-007

    Class 4 Estimate and Level 2 Schedule

    PRJ-B-005 · FEL 2 / Select · Studies and analyses · 2012-08-30 · PRJ-B-005-WBS-F2-03 · PRJ-B-005-BL-F2-B01

    Establish the controlled class 4 estimate and level 2 schedule needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F2-008

    Selected Concept and G2 Decision Dossier

    PRJ-B-005 · FEL 2 / Select · Dossiers and manual sets · 2012-09-07 · PRJ-B-005-WBS-F2-04 · PRJ-B-005-BL-F2-B01

    Establish the controlled selected concept and g2 decision dossier needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F3-001

    Defined Scope and Design Deliverables Register

    PRJ-B-005 · FEL 3 / Define · Registers and indexes · 2012-09-14 · PRJ-B-005-WBS-F3-01 · PRJ-B-005-BL-F3-B01

    Establish the controlled defined scope and design deliverables register needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F3-002

    Baselined System Requirements Specification

    PRJ-B-005 · FEL 3 / Define · Specifications · 2012-09-22 · PRJ-B-005-WBS-F3-02 · PRJ-B-005-BL-F3-B01

    Establish the controlled baselined system requirements specification needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F3-003

    System Architecture and Interface Control Document

    PRJ-B-005 · FEL 3 / Define · Design definitions · 2012-09-29 · PRJ-B-005-WBS-F3-03 · PRJ-B-005-BL-F3-B01

    Establish the controlled system architecture and interface control document needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F3-004

    Project Execution Plan

    PRJ-B-005 · FEL 3 / Define · Plans · 2012-10-07 · PRJ-B-005-WBS-F3-04 · PRJ-B-005-BL-F3-B01

    Establish the controlled project execution plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F3-005

    WBS, Work Package, and Responsibility Baseline

    PRJ-B-005 · FEL 3 / Define · Baselines and manifests · 2012-10-14 · PRJ-B-005-WBS-F3-01 · PRJ-B-005-BL-F3-B01

    Establish the controlled wbs, work package, and responsibility baseline needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F3-006

    Class 3 Estimate and Cost Baseline

    PRJ-B-005 · FEL 3 / Define · Baselines and manifests · 2012-10-22 · PRJ-B-005-WBS-F3-02 · PRJ-B-005-BL-F3-B01

    Establish the controlled class 3 estimate and cost baseline needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F3-007

    Coordinated Control Schedule and Resource Plan

    PRJ-B-005 · FEL 3 / Define · Plans · 2012-10-29 · PRJ-B-005-WBS-F3-03 · PRJ-B-005-BL-F3-B01

    Establish the controlled coordinated control schedule and resource plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F3-008

    Procurement and Contracting Plan

    PRJ-B-005 · FEL 3 / Define · Plans · 2012-11-06 · PRJ-B-005-WBS-F3-04 · PRJ-B-005-BL-F3-B01

    Establish the controlled procurement and contracting plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F3-009

    V&V, Acceptance, Commissioning, and Turnover Strategy

    PRJ-B-005 · FEL 3 / Define · Plans · 2012-11-13 · PRJ-B-005-WBS-F3-01 · PRJ-B-005-BL-F3-B01

    Establish the controlled v&v, acceptance, commissioning, and turnover strategy needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-F3-010

    FID / G3 Approval and Baseline Manifest

    PRJ-B-005 · FEL 3 / Define · Certificates and approvals · 2012-11-21 · PRJ-B-005-WBS-F3-02 · PRJ-B-005-BL-F3-B01

    Establish the controlled fid / g3 approval and baseline manifest needed to execute Manufacturing Scheduling and MOM/MES Evaluation during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-DD-001

    Detailed Design Management Plan

    PRJ-B-005 · Detailed Design · Plans · 2012-11-28 · PRJ-B-005-WBS-DD-01 · PRJ-B-005-BL-DD-B01

    Establish the controlled detailed design management plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-DD-002

    Process / Functional Design Package

    PRJ-B-005 · Detailed Design · Design definitions · 2012-12-06 · PRJ-B-005-WBS-DD-02 · PRJ-B-005-BL-DD-B01

    Establish the controlled process / functional design package needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-DD-003

    Mechanical and Piping Design Package

    PRJ-B-005 · Detailed Design · Design definitions · 2012-12-13 · PRJ-B-005-WBS-DD-03 · PRJ-B-005-BL-DD-B01

    Establish the controlled mechanical and piping design package needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-DD-004

    Electrical Power and Controls Design Package

    PRJ-B-005 · Detailed Design · Design definitions · 2012-12-21 · PRJ-B-005-WBS-DD-04 · PRJ-B-005-BL-DD-B01

    Establish the controlled electrical power and controls design package needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-DD-005

    Civil, Structural, and Architectural Design Package

    PRJ-B-005 · Detailed Design · Design definitions · 2012-12-28 · PRJ-B-005-WBS-DD-01 · PRJ-B-005-BL-DD-B01

    Establish the controlled civil, structural, and architectural design package needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-DD-006

    Instrumentation, Automation, and Data Design Package

    PRJ-B-005 · Detailed Design · Design definitions · 2013-01-05 · PRJ-B-005-WBS-DD-02 · PRJ-B-005-BL-DD-B01

    Establish the controlled instrumentation, automation, and data design package needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-DD-007

    Safety, Reliability, and Maintainability Analysis

    PRJ-B-005 · Detailed Design · Studies and analyses · 2013-01-12 · PRJ-B-005-WBS-DD-03 · PRJ-B-005-BL-DD-B01

    Establish the controlled safety, reliability, and maintainability analysis needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-DD-008

    Design Review and Comment Resolution Record

    PRJ-B-005 · Detailed Design · Records and logs · 2013-01-20 · PRJ-B-005-WBS-DD-04 · PRJ-B-005-BL-DD-B01

    Establish the controlled design review and comment resolution record needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-DD-009

    Issued-for-Construction Design Baseline

    PRJ-B-005 · Detailed Design · Baselines and manifests · 2013-01-27 · PRJ-B-005-WBS-DD-01 · PRJ-B-005-BL-DD-B01

    Establish the controlled issued-for-construction design baseline needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-DD-010

    Design V&V Evidence Index

    PRJ-B-005 · Detailed Design · Registers and indexes · 2013-02-04 · PRJ-B-005-WBS-DD-02 · PRJ-B-005-BL-DD-B01

    Establish the controlled design v&v evidence index needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-PR-001

    Procurement Package and Bid List

    PRJ-B-005 · Procurement · Registers and indexes · 2013-02-11 · PRJ-B-005-WBS-PR-01 · PRJ-B-005-BL-PR-B01

    Establish the controlled procurement package and bid list needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-PR-002

    Technical Requisition and Datasheet Set

    PRJ-B-005 · Procurement · Specifications · 2013-02-19 · PRJ-B-005-WBS-PR-02 · PRJ-B-005-BL-PR-B01

    Establish the controlled technical requisition and datasheet set needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-PR-003

    Commercial Bid Evaluation and Award Recommendation

    PRJ-B-005 · Procurement · Studies and analyses · 2013-02-27 · PRJ-B-005-WBS-PR-03 · PRJ-B-005-BL-PR-B01

    Establish the controlled commercial bid evaluation and award recommendation needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-PR-004

    Technical Bid Evaluation and Clarification Log

    PRJ-B-005 · Procurement · Registers and indexes · 2013-03-06 · PRJ-B-005-WBS-PR-04 · PRJ-B-005-BL-PR-B01

    Establish the controlled technical bid evaluation and clarification log needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-PR-005

    Purchase Order / Contract and Scope of Supply

    PRJ-B-005 · Procurement · Business and decision documents · 2013-03-14 · PRJ-B-005-WBS-PR-01 · PRJ-B-005-BL-PR-B01

    Establish the controlled purchase order / contract and scope of supply needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-PR-006

    Supplier Quality and Inspection Plan

    PRJ-B-005 · Procurement · Plans · 2013-03-22 · PRJ-B-005-WBS-PR-02 · PRJ-B-005-BL-PR-B01

    Establish the controlled supplier quality and inspection plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-PR-007

    Vendor Data, Submittal, and RFI Register

    PRJ-B-005 · Procurement · Registers and indexes · 2013-03-29 · PRJ-B-005-WBS-PR-03 · PRJ-B-005-BL-PR-B01

    Establish the controlled vendor data, submittal, and rfi register needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-PR-008

    Expediting and Logistics Plan

    PRJ-B-005 · Procurement · Plans · 2013-04-06 · PRJ-B-005-WBS-PR-04 · PRJ-B-005-BL-PR-B01

    Establish the controlled expediting and logistics plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-PR-009

    Factory Acceptance Test Procedure and Report

    PRJ-B-005 · Procurement · Procedures · 2013-04-14 · PRJ-B-005-WBS-PR-01 · PRJ-B-005-BL-PR-B01

    Establish the controlled factory acceptance test procedure and report needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-FC-001

    Construction / Fabrication Execution Plan

    PRJ-B-005 · Fabrication / Construction · Plans · 2013-04-25 · PRJ-B-005-WBS-FC-01 · PRJ-B-005-BL-FC-B01

    Establish the controlled construction / fabrication execution plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-FC-002

    Site Logistics, Safety, and Permit Plan

    PRJ-B-005 · Fabrication / Construction · Plans · 2013-05-07 · PRJ-B-005-WBS-FC-02 · PRJ-B-005-BL-FC-B01

    Establish the controlled site logistics, safety, and permit plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-FC-003

    Fabrication Drawing and Shop Package

    PRJ-B-005 · Fabrication / Construction · Design definitions · 2013-05-18 · PRJ-B-005-WBS-FC-03 · PRJ-B-005-BL-FC-B01

    Establish the controlled fabrication drawing and shop package needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-FC-004

    Field Work Package and Installation Method

    PRJ-B-005 · Fabrication / Construction · Procedures · 2013-05-30 · PRJ-B-005-WBS-FC-04 · PRJ-B-005-BL-FC-B01

    Establish the controlled field work package and installation method needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-FC-005

    Inspection and Test Plan / Quality Records

    PRJ-B-005 · Fabrication / Construction · Plans · 2013-06-10 · PRJ-B-005-WBS-FC-01 · PRJ-B-005-BL-FC-B01

    Establish the controlled inspection and test plan / quality records needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-FC-006

    Daily Progress and Quantity Report

    PRJ-B-005 · Fabrication / Construction · Records and logs · 2013-06-22 · PRJ-B-005-WBS-FC-02 · PRJ-B-005-BL-FC-B01

    Establish the controlled daily progress and quantity report needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-FC-007

    Nonconformity and Corrective Action Record

    PRJ-B-005 · Fabrication / Construction · Records and logs · 2013-07-03 · PRJ-B-005-WBS-FC-03 · PRJ-B-005-BL-FC-B01

    Establish the controlled nonconformity and corrective action record needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-FC-008

    Redline Drawing and Field Change Register

    PRJ-B-005 · Fabrication / Construction · Registers and indexes · 2013-07-15 · PRJ-B-005-WBS-FC-04 · PRJ-B-005-BL-FC-B01

    Establish the controlled redline drawing and field change register needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-FC-009

    Mechanical Completion Certificate and Punch List

    PRJ-B-005 · Fabrication / Construction · Certificates and approvals · 2013-07-27 · PRJ-B-005-WBS-FC-01 · PRJ-B-005-BL-FC-B01

    Establish the controlled mechanical completion certificate and punch list needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-IN-001

    System Coordination and Interface Plan

    PRJ-B-005 · Installation and Interface Coordination · Plans · 2013-08-03 · PRJ-B-005-WBS-IN-01 · PRJ-B-005-BL-IN-B01

    Establish the controlled system coordination and interface plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-IN-002

    Installation Completion and Walkdown Record

    PRJ-B-005 · Installation and Interface Coordination · Records and logs · 2013-08-10 · PRJ-B-005-WBS-IN-02 · PRJ-B-005-BL-IN-B01

    Establish the controlled installation completion and walkdown record needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-IN-003

    Controls / Software Configuration Baseline

    PRJ-B-005 · Installation and Interface Coordination · Baselines and manifests · 2013-08-18 · PRJ-B-005-WBS-IN-03 · PRJ-B-005-BL-IN-B01

    Establish the controlled controls / software configuration baseline needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-IN-004

    Loop Check, Continuity, and Calibration Records

    PRJ-B-005 · Installation and Interface Coordination · Records and logs · 2013-08-25 · PRJ-B-005-WBS-IN-04 · PRJ-B-005-BL-IN-B01

    Establish the controlled loop check, continuity, and calibration records needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-IN-005

    Cleaning, Flushing, and Pre-Operational Test Record

    PRJ-B-005 · Installation and Interface Coordination · Procedures · 2013-09-02 · PRJ-B-005-WBS-IN-01 · PRJ-B-005-BL-IN-B01

    Establish the controlled cleaning, flushing, and pre-operational test record needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-IN-006

    System Completion Dossier

    PRJ-B-005 · Installation and Interface Coordination · Dossiers and manual sets · 2013-09-09 · PRJ-B-005-WBS-IN-02 · PRJ-B-005-BL-IN-B01

    Establish the controlled system completion dossier needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-IN-007

    Ready-for-Commissioning Certificate

    PRJ-B-005 · Installation and Interface Coordination · Certificates and approvals · 2013-09-17 · PRJ-B-005-WBS-IN-03 · PRJ-B-005-BL-IN-B01

    Establish the controlled ready-for-commissioning certificate needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-CS-001

    Commissioning and Startup Plan

    PRJ-B-005 · Commissioning / Startup · Plans · 2013-09-24 · PRJ-B-005-WBS-CS-01 · PRJ-B-005-BL-CS-B01

    Establish the controlled commissioning and startup plan needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-CS-002

    Pre-Startup Safety / Operational Readiness Review

    PRJ-B-005 · Commissioning / Startup · Reports · 2013-10-01 · PRJ-B-005-WBS-CS-02 · PRJ-B-005-BL-CS-B01

    Establish the controlled pre-startup safety / operational readiness review needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-CS-003

    Commissioning Procedure and Results

    PRJ-B-005 · Commissioning / Startup · Procedures · 2013-10-08 · PRJ-B-005-WBS-CS-03 · PRJ-B-005-BL-CS-B01

    Establish the controlled commissioning procedure and results needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-CS-004

    Startup and Ramp-Up Log

    PRJ-B-005 · Commissioning / Startup · Registers and indexes · 2013-10-15 · PRJ-B-005-WBS-CS-04 · PRJ-B-005-BL-CS-B01

    Establish the controlled startup and ramp-up log needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-CS-005

    Performance Guarantee and Capacity Test Report

    PRJ-B-005 · Commissioning / Startup · Studies and analyses · 2013-10-22 · PRJ-B-005-WBS-CS-01 · PRJ-B-005-BL-CS-B01

    Establish the controlled performance guarantee and capacity test report needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-CS-006

    Reliability Demonstration Run Report

    PRJ-B-005 · Commissioning / Startup · Studies and analyses · 2013-10-29 · PRJ-B-005-WBS-CS-02 · PRJ-B-005-BL-CS-B01

    Establish the controlled reliability demonstration run report needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-CS-007

    Operator and Maintainer Training Record

    PRJ-B-005 · Commissioning / Startup · Records and logs · 2013-11-05 · PRJ-B-005-WBS-CS-03 · PRJ-B-005-BL-CS-B01

    Establish the controlled operator and maintainer training record needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-CS-008

    Commissioning Anomaly and Punch Closure Register

    PRJ-B-005 · Commissioning / Startup · Registers and indexes · 2013-11-12 · PRJ-B-005-WBS-CS-04 · PRJ-B-005-BL-CS-B01

    Establish the controlled commissioning anomaly and punch closure register needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-CS-009

    Performance Acceptance Certificate

    PRJ-B-005 · Commissioning / Startup · Certificates and approvals · 2013-11-20 · PRJ-B-005-WBS-CS-01 · PRJ-B-005-BL-CS-B01

    Establish the controlled performance acceptance certificate needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-OT-001

    As-Built / as-Configured Baseline Manifest

    PRJ-B-005 · Operational Turnover / Closeout · Baselines and manifests · 2013-11-25 · PRJ-B-005-WBS-OT-01 · PRJ-B-005-BL-OT-B01

    Establish the controlled as-built / as-configured baseline manifest needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-OT-002

    Operations and Maintenance Manual Set

    PRJ-B-005 · Operational Turnover / Closeout · Dossiers and manual sets · 2013-11-30 · PRJ-B-005-WBS-OT-02 · PRJ-B-005-BL-OT-B01

    Establish the controlled operations and maintenance manual set needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-OT-003

    Asset, Spare Parts, and Warranty Register

    PRJ-B-005 · Operational Turnover / Closeout · Registers and indexes · 2013-12-05 · PRJ-B-005-WBS-OT-03 · PRJ-B-005-BL-OT-B01

    Establish the controlled asset, spare parts, and warranty register needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-OT-004

    Final Technical and Commercial Acceptance Certificate

    PRJ-B-005 · Operational Turnover / Closeout · Certificates and approvals · 2013-12-10 · PRJ-B-005-WBS-OT-04 · PRJ-B-005-BL-OT-B01

    Establish the controlled final technical and commercial acceptance certificate needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-OT-005

    Operational Turnover Dossier and Ownership Transfer

    PRJ-B-005 · Operational Turnover / Closeout · Dossiers and manual sets · 2013-12-15 · PRJ-B-005-WBS-OT-01 · PRJ-B-005-BL-OT-B01

    Establish the controlled operational turnover dossier and ownership transfer needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-OT-006

    Final Cost, Schedule, Contract, and Claims Closeout

    PRJ-B-005 · Operational Turnover / Closeout · Studies and analyses · 2013-12-20 · PRJ-B-005-WBS-OT-02 · PRJ-B-005-BL-OT-B01

    Establish the controlled final cost, schedule, contract, and claims closeout needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-OT-007

    Controlled Records Archive and Retrieval Index

    PRJ-B-005 · Operational Turnover / Closeout · Registers and indexes · 2013-12-25 · PRJ-B-005-WBS-OT-03 · PRJ-B-005-BL-OT-B01

    Establish the controlled controlled records archive and retrieval index needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-005-SE-OT-008

    Lessons Learned and Benefit Realization Baseline

    PRJ-B-005 · Operational Turnover / Closeout · Baselines and manifests · 2013-12-31 · PRJ-B-005-WBS-OT-04 · PRJ-B-005-BL-OT-B01

    Establish the controlled lessons learned and benefit realization baseline needed to execute Manufacturing Scheduling and MOM/MES Evaluation during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to MOM/MES scheduling solution within PRJ-B-005 - Manufacturing Scheduling and MOM/MES Evaluation. The project scope is: VOC, process mapping, requirements, data architecture, vendor selection, configuration, interfaces, pilot deployment, user acceptance, training, cutover, and support transition. Operational scheduling and manufacturing-visibility solution with governed master data, trained users, and support ownership.

  • PRJ-B-006-SE-F1-001

    Business Case and Opportunity Statement

    PRJ-B-006 · FEL 1 / Concept · Business and decision documents · 2014-01-11 · PRJ-B-006-WBS-F1-01 · PRJ-B-006-BL-F1-B01

    Establish the controlled business case and opportunity statement needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-F1-002

    Project Charter and Initial Scope / Battery Limits

    PRJ-B-006 · FEL 1 / Concept · Business and decision documents · 2014-01-23 · PRJ-B-006-WBS-F1-02 · PRJ-B-006-BL-F1-B01

    Establish the controlled project charter and initial scope / battery limits needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-F1-003

    Stakeholder Needs and Operating Context

    PRJ-B-006 · FEL 1 / Concept · Reports · 2014-02-04 · PRJ-B-006-WBS-F1-03 · PRJ-B-006-BL-F1-B01

    Establish the controlled stakeholder needs and operating context needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-F1-004

    Concept Alternatives and Screening Study

    PRJ-B-006 · FEL 1 / Concept · Studies and analyses · 2014-02-15 · PRJ-B-006-WBS-F1-04 · PRJ-B-006-BL-F1-B01

    Establish the controlled concept alternatives and screening study needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-F1-005

    Preliminary Schedule and Class 5 Cost Estimate

    PRJ-B-006 · FEL 1 / Concept · Studies and analyses · 2014-02-27 · PRJ-B-006-WBS-F1-01 · PRJ-B-006-BL-F1-B01

    Establish the controlled preliminary schedule and class 5 cost estimate needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-F1-006

    Initial Risk, Assumption, and Decision Register

    PRJ-B-006 · FEL 1 / Concept · Registers and indexes · 2014-03-11 · PRJ-B-006-WBS-F1-02 · PRJ-B-006-BL-F1-B01

    Establish the controlled initial risk, assumption, and decision register needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-F2-001

    Option Study and Weighted Decision Analysis

    PRJ-B-006 · FEL 2 / Select · Studies and analyses · 2014-03-23 · PRJ-B-006-WBS-F2-01 · PRJ-B-006-BL-F2-B01

    Establish the controlled option study and weighted decision analysis needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-F2-002

    Design Basis Memorandum

    PRJ-B-006 · FEL 2 / Select · Design definitions · 2014-04-05 · PRJ-B-006-WBS-F2-02 · PRJ-B-006-BL-F2-B01

    Establish the controlled design basis memorandum needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-F2-003

    Site, Layout, and Process Alternative Study

    PRJ-B-006 · FEL 2 / Select · Studies and analyses · 2014-04-17 · PRJ-B-006-WBS-F2-03 · PRJ-B-006-BL-F2-B01

    Establish the controlled site, layout, and process alternative study needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-F2-004

    Stakeholder and System Requirements Specification

    PRJ-B-006 · FEL 2 / Select · Specifications · 2014-04-30 · PRJ-B-006-WBS-F2-04 · PRJ-B-006-BL-F2-B01

    Establish the controlled stakeholder and system requirements specification needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-F2-005

    Concept Architecture and Interface Definition

    PRJ-B-006 · FEL 2 / Select · Design definitions · 2014-05-12 · PRJ-B-006-WBS-F2-01 · PRJ-B-006-BL-F2-B01

    Establish the controlled concept architecture and interface definition needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-F2-006

    HAZID / Constructability / Operability Study

    PRJ-B-006 · FEL 2 / Select · Studies and analyses · 2014-05-25 · PRJ-B-006-WBS-F2-02 · PRJ-B-006-BL-F2-B01

    Establish the controlled hazid / constructability / operability study needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-F2-007

    Class 4 Estimate and Level 2 Schedule

    PRJ-B-006 · FEL 2 / Select · Studies and analyses · 2014-06-06 · PRJ-B-006-WBS-F2-03 · PRJ-B-006-BL-F2-B01

    Establish the controlled class 4 estimate and level 2 schedule needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-F2-008

    Selected Concept and G2 Decision Dossier

    PRJ-B-006 · FEL 2 / Select · Dossiers and manual sets · 2014-06-19 · PRJ-B-006-WBS-F2-04 · PRJ-B-006-BL-F2-B01

    Establish the controlled selected concept and g2 decision dossier needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-F3-001

    Defined Scope and Design Deliverables Register

    PRJ-B-006 · FEL 3 / Define · Registers and indexes · 2014-07-02 · PRJ-B-006-WBS-F3-01 · PRJ-B-006-BL-F3-B01

    Establish the controlled defined scope and design deliverables register needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-F3-002

    Baselined System Requirements Specification

    PRJ-B-006 · FEL 3 / Define · Specifications · 2014-07-15 · PRJ-B-006-WBS-F3-02 · PRJ-B-006-BL-F3-B01

    Establish the controlled baselined system requirements specification needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-F3-003

    System Architecture and Interface Control Document

    PRJ-B-006 · FEL 3 / Define · Design definitions · 2014-07-28 · PRJ-B-006-WBS-F3-03 · PRJ-B-006-BL-F3-B01

    Establish the controlled system architecture and interface control document needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-F3-004

    Project Execution Plan

    PRJ-B-006 · FEL 3 / Define · Plans · 2014-08-10 · PRJ-B-006-WBS-F3-04 · PRJ-B-006-BL-F3-B01

    Establish the controlled project execution plan needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-F3-005

    WBS, Work Package, and Responsibility Baseline

    PRJ-B-006 · FEL 3 / Define · Baselines and manifests · 2014-08-23 · PRJ-B-006-WBS-F3-01 · PRJ-B-006-BL-F3-B01

    Establish the controlled wbs, work package, and responsibility baseline needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-F3-006

    Class 3 Estimate and Cost Baseline

    PRJ-B-006 · FEL 3 / Define · Baselines and manifests · 2014-09-05 · PRJ-B-006-WBS-F3-02 · PRJ-B-006-BL-F3-B01

    Establish the controlled class 3 estimate and cost baseline needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-F3-007

    Coordinated Control Schedule and Resource Plan

    PRJ-B-006 · FEL 3 / Define · Plans · 2014-09-18 · PRJ-B-006-WBS-F3-03 · PRJ-B-006-BL-F3-B01

    Establish the controlled coordinated control schedule and resource plan needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-F3-008

    Procurement and Contracting Plan

    PRJ-B-006 · FEL 3 / Define · Plans · 2014-10-01 · PRJ-B-006-WBS-F3-04 · PRJ-B-006-BL-F3-B01

    Establish the controlled procurement and contracting plan needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-F3-009

    V&V, Acceptance, Commissioning, and Turnover Strategy

    PRJ-B-006 · FEL 3 / Define · Plans · 2014-10-14 · PRJ-B-006-WBS-F3-01 · PRJ-B-006-BL-F3-B01

    Establish the controlled v&v, acceptance, commissioning, and turnover strategy needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-F3-010

    FID / G3 Approval and Baseline Manifest

    PRJ-B-006 · FEL 3 / Define · Certificates and approvals · 2014-10-28 · PRJ-B-006-WBS-F3-02 · PRJ-B-006-BL-F3-B01

    Establish the controlled fid / g3 approval and baseline manifest needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-DD-001

    Detailed Design Management Plan

    PRJ-B-006 · Detailed Design · Plans · 2014-11-10 · PRJ-B-006-WBS-DD-01 · PRJ-B-006-BL-DD-B01

    Establish the controlled detailed design management plan needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-DD-002

    Process / Functional Design Package

    PRJ-B-006 · Detailed Design · Design definitions · 2014-11-23 · PRJ-B-006-WBS-DD-02 · PRJ-B-006-BL-DD-B01

    Establish the controlled process / functional design package needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-DD-003

    Mechanical and Piping Design Package

    PRJ-B-006 · Detailed Design · Design definitions · 2014-12-06 · PRJ-B-006-WBS-DD-03 · PRJ-B-006-BL-DD-B01

    Establish the controlled mechanical and piping design package needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-DD-004

    Electrical Power and Controls Design Package

    PRJ-B-006 · Detailed Design · Design definitions · 2014-12-19 · PRJ-B-006-WBS-DD-04 · PRJ-B-006-BL-DD-B01

    Establish the controlled electrical power and controls design package needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-DD-005

    Civil, Structural, and Architectural Design Package

    PRJ-B-006 · Detailed Design · Design definitions · 2015-01-01 · PRJ-B-006-WBS-DD-01 · PRJ-B-006-BL-DD-B01

    Establish the controlled civil, structural, and architectural design package needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-DD-006

    Instrumentation, Automation, and Data Design Package

    PRJ-B-006 · Detailed Design · Design definitions · 2015-01-14 · PRJ-B-006-WBS-DD-02 · PRJ-B-006-BL-DD-B01

    Establish the controlled instrumentation, automation, and data design package needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-DD-007

    Safety, Reliability, and Maintainability Analysis

    PRJ-B-006 · Detailed Design · Studies and analyses · 2015-01-27 · PRJ-B-006-WBS-DD-03 · PRJ-B-006-BL-DD-B01

    Establish the controlled safety, reliability, and maintainability analysis needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-DD-008

    Design Review and Comment Resolution Record

    PRJ-B-006 · Detailed Design · Records and logs · 2015-02-09 · PRJ-B-006-WBS-DD-04 · PRJ-B-006-BL-DD-B01

    Establish the controlled design review and comment resolution record needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-DD-009

    Issued-for-Construction Design Baseline

    PRJ-B-006 · Detailed Design · Baselines and manifests · 2015-02-22 · PRJ-B-006-WBS-DD-01 · PRJ-B-006-BL-DD-B01

    Establish the controlled issued-for-construction design baseline needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-DD-010

    Design V&V Evidence Index

    PRJ-B-006 · Detailed Design · Registers and indexes · 2015-03-08 · PRJ-B-006-WBS-DD-02 · PRJ-B-006-BL-DD-B01

    Establish the controlled design v&v evidence index needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-PR-001

    Procurement Package and Bid List

    PRJ-B-006 · Procurement · Registers and indexes · 2015-03-21 · PRJ-B-006-WBS-PR-01 · PRJ-B-006-BL-PR-B01

    Establish the controlled procurement package and bid list needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-PR-002

    Technical Requisition and Datasheet Set

    PRJ-B-006 · Procurement · Specifications · 2015-04-03 · PRJ-B-006-WBS-PR-02 · PRJ-B-006-BL-PR-B01

    Establish the controlled technical requisition and datasheet set needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-PR-003

    Commercial Bid Evaluation and Award Recommendation

    PRJ-B-006 · Procurement · Studies and analyses · 2015-04-17 · PRJ-B-006-WBS-PR-03 · PRJ-B-006-BL-PR-B01

    Establish the controlled commercial bid evaluation and award recommendation needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-PR-004

    Technical Bid Evaluation and Clarification Log

    PRJ-B-006 · Procurement · Registers and indexes · 2015-04-30 · PRJ-B-006-WBS-PR-04 · PRJ-B-006-BL-PR-B01

    Establish the controlled technical bid evaluation and clarification log needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-PR-005

    Purchase Order / Contract and Scope of Supply

    PRJ-B-006 · Procurement · Business and decision documents · 2015-05-13 · PRJ-B-006-WBS-PR-01 · PRJ-B-006-BL-PR-B01

    Establish the controlled purchase order / contract and scope of supply needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-PR-006

    Supplier Quality and Inspection Plan

    PRJ-B-006 · Procurement · Plans · 2015-05-27 · PRJ-B-006-WBS-PR-02 · PRJ-B-006-BL-PR-B01

    Establish the controlled supplier quality and inspection plan needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-PR-007

    Vendor Data, Submittal, and RFI Register

    PRJ-B-006 · Procurement · Registers and indexes · 2015-06-09 · PRJ-B-006-WBS-PR-03 · PRJ-B-006-BL-PR-B01

    Establish the controlled vendor data, submittal, and rfi register needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-PR-008

    Expediting and Logistics Plan

    PRJ-B-006 · Procurement · Plans · 2015-06-22 · PRJ-B-006-WBS-PR-04 · PRJ-B-006-BL-PR-B01

    Establish the controlled expediting and logistics plan needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-PR-009

    Factory Acceptance Test Procedure and Report

    PRJ-B-006 · Procurement · Procedures · 2015-07-06 · PRJ-B-006-WBS-PR-01 · PRJ-B-006-BL-PR-B01

    Establish the controlled factory acceptance test procedure and report needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-FC-001

    Construction / Fabrication Execution Plan

    PRJ-B-006 · Fabrication / Construction · Plans · 2015-07-26 · PRJ-B-006-WBS-FC-01 · PRJ-B-006-BL-FC-B01

    Establish the controlled construction / fabrication execution plan needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-FC-002

    Site Logistics, Safety, and Permit Plan

    PRJ-B-006 · Fabrication / Construction · Plans · 2015-08-15 · PRJ-B-006-WBS-FC-02 · PRJ-B-006-BL-FC-B01

    Establish the controlled site logistics, safety, and permit plan needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-FC-003

    Fabrication Drawing and Shop Package

    PRJ-B-006 · Fabrication / Construction · Design definitions · 2015-09-04 · PRJ-B-006-WBS-FC-03 · PRJ-B-006-BL-FC-B01

    Establish the controlled fabrication drawing and shop package needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-FC-004

    Field Work Package and Installation Method

    PRJ-B-006 · Fabrication / Construction · Procedures · 2015-09-24 · PRJ-B-006-WBS-FC-04 · PRJ-B-006-BL-FC-B01

    Establish the controlled field work package and installation method needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-FC-005

    Inspection and Test Plan / Quality Records

    PRJ-B-006 · Fabrication / Construction · Plans · 2015-10-14 · PRJ-B-006-WBS-FC-01 · PRJ-B-006-BL-FC-B01

    Establish the controlled inspection and test plan / quality records needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-FC-006

    Daily Progress and Quantity Report

    PRJ-B-006 · Fabrication / Construction · Records and logs · 2015-11-03 · PRJ-B-006-WBS-FC-02 · PRJ-B-006-BL-FC-B01

    Establish the controlled daily progress and quantity report needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-FC-007

    Nonconformity and Corrective Action Record

    PRJ-B-006 · Fabrication / Construction · Records and logs · 2015-11-23 · PRJ-B-006-WBS-FC-03 · PRJ-B-006-BL-FC-B01

    Establish the controlled nonconformity and corrective action record needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-FC-008

    Redline Drawing and Field Change Register

    PRJ-B-006 · Fabrication / Construction · Registers and indexes · 2015-12-13 · PRJ-B-006-WBS-FC-04 · PRJ-B-006-BL-FC-B01

    Establish the controlled redline drawing and field change register needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-FC-009

    Mechanical Completion Certificate and Punch List

    PRJ-B-006 · Fabrication / Construction · Certificates and approvals · 2016-01-03 · PRJ-B-006-WBS-FC-01 · PRJ-B-006-BL-FC-B01

    Establish the controlled mechanical completion certificate and punch list needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-IN-001

    System Coordination and Interface Plan

    PRJ-B-006 · Installation and Interface Coordination · Plans · 2016-01-15 · PRJ-B-006-WBS-IN-01 · PRJ-B-006-BL-IN-B01

    Establish the controlled system coordination and interface plan needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-IN-002

    Installation Completion and Walkdown Record

    PRJ-B-006 · Installation and Interface Coordination · Records and logs · 2016-01-28 · PRJ-B-006-WBS-IN-02 · PRJ-B-006-BL-IN-B01

    Establish the controlled installation completion and walkdown record needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-IN-003

    Controls / Software Configuration Baseline

    PRJ-B-006 · Installation and Interface Coordination · Baselines and manifests · 2016-02-10 · PRJ-B-006-WBS-IN-03 · PRJ-B-006-BL-IN-B01

    Establish the controlled controls / software configuration baseline needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-IN-004

    Loop Check, Continuity, and Calibration Records

    PRJ-B-006 · Installation and Interface Coordination · Records and logs · 2016-02-23 · PRJ-B-006-WBS-IN-04 · PRJ-B-006-BL-IN-B01

    Establish the controlled loop check, continuity, and calibration records needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-IN-005

    Cleaning, Flushing, and Pre-Operational Test Record

    PRJ-B-006 · Installation and Interface Coordination · Procedures · 2016-03-07 · PRJ-B-006-WBS-IN-01 · PRJ-B-006-BL-IN-B01

    Establish the controlled cleaning, flushing, and pre-operational test record needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-IN-006

    System Completion Dossier

    PRJ-B-006 · Installation and Interface Coordination · Dossiers and manual sets · 2016-03-20 · PRJ-B-006-WBS-IN-02 · PRJ-B-006-BL-IN-B01

    Establish the controlled system completion dossier needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-IN-007

    Ready-for-Commissioning Certificate

    PRJ-B-006 · Installation and Interface Coordination · Certificates and approvals · 2016-04-02 · PRJ-B-006-WBS-IN-03 · PRJ-B-006-BL-IN-B01

    Establish the controlled ready-for-commissioning certificate needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-CS-001

    Commissioning and Startup Plan

    PRJ-B-006 · Commissioning / Startup · Plans · 2016-04-14 · PRJ-B-006-WBS-CS-01 · PRJ-B-006-BL-CS-B01

    Establish the controlled commissioning and startup plan needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-CS-002

    Pre-Startup Safety / Operational Readiness Review

    PRJ-B-006 · Commissioning / Startup · Reports · 2016-04-26 · PRJ-B-006-WBS-CS-02 · PRJ-B-006-BL-CS-B01

    Establish the controlled pre-startup safety / operational readiness review needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-CS-003

    Commissioning Procedure and Results

    PRJ-B-006 · Commissioning / Startup · Procedures · 2016-05-08 · PRJ-B-006-WBS-CS-03 · PRJ-B-006-BL-CS-B01

    Establish the controlled commissioning procedure and results needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-CS-004

    Startup and Ramp-Up Log

    PRJ-B-006 · Commissioning / Startup · Registers and indexes · 2016-05-20 · PRJ-B-006-WBS-CS-04 · PRJ-B-006-BL-CS-B01

    Establish the controlled startup and ramp-up log needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-CS-005

    Performance Guarantee and Capacity Test Report

    PRJ-B-006 · Commissioning / Startup · Studies and analyses · 2016-06-02 · PRJ-B-006-WBS-CS-01 · PRJ-B-006-BL-CS-B01

    Establish the controlled performance guarantee and capacity test report needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-CS-006

    Reliability Demonstration Run Report

    PRJ-B-006 · Commissioning / Startup · Studies and analyses · 2016-06-14 · PRJ-B-006-WBS-CS-02 · PRJ-B-006-BL-CS-B01

    Establish the controlled reliability demonstration run report needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-CS-007

    Operator and Maintainer Training Record

    PRJ-B-006 · Commissioning / Startup · Records and logs · 2016-06-26 · PRJ-B-006-WBS-CS-03 · PRJ-B-006-BL-CS-B01

    Establish the controlled operator and maintainer training record needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-CS-008

    Commissioning Anomaly and Punch Closure Register

    PRJ-B-006 · Commissioning / Startup · Registers and indexes · 2016-07-08 · PRJ-B-006-WBS-CS-04 · PRJ-B-006-BL-CS-B01

    Establish the controlled commissioning anomaly and punch closure register needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-CS-009

    Performance Acceptance Certificate

    PRJ-B-006 · Commissioning / Startup · Certificates and approvals · 2016-07-21 · PRJ-B-006-WBS-CS-01 · PRJ-B-006-BL-CS-B01

    Establish the controlled performance acceptance certificate needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-OT-001

    As-Built / as-Configured Baseline Manifest

    PRJ-B-006 · Operational Turnover / Closeout · Baselines and manifests · 2016-07-29 · PRJ-B-006-WBS-OT-01 · PRJ-B-006-BL-OT-B01

    Establish the controlled as-built / as-configured baseline manifest needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-OT-002

    Operations and Maintenance Manual Set

    PRJ-B-006 · Operational Turnover / Closeout · Dossiers and manual sets · 2016-08-07 · PRJ-B-006-WBS-OT-02 · PRJ-B-006-BL-OT-B01

    Establish the controlled operations and maintenance manual set needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-OT-003

    Asset, Spare Parts, and Warranty Register

    PRJ-B-006 · Operational Turnover / Closeout · Registers and indexes · 2016-08-16 · PRJ-B-006-WBS-OT-03 · PRJ-B-006-BL-OT-B01

    Establish the controlled asset, spare parts, and warranty register needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-OT-004

    Final Technical and Commercial Acceptance Certificate

    PRJ-B-006 · Operational Turnover / Closeout · Certificates and approvals · 2016-08-25 · PRJ-B-006-WBS-OT-04 · PRJ-B-006-BL-OT-B01

    Establish the controlled final technical and commercial acceptance certificate needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-OT-005

    Operational Turnover Dossier and Ownership Transfer

    PRJ-B-006 · Operational Turnover / Closeout · Dossiers and manual sets · 2016-09-03 · PRJ-B-006-WBS-OT-01 · PRJ-B-006-BL-OT-B01

    Establish the controlled operational turnover dossier and ownership transfer needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-OT-006

    Final Cost, Schedule, Contract, and Claims Closeout

    PRJ-B-006 · Operational Turnover / Closeout · Studies and analyses · 2016-09-12 · PRJ-B-006-WBS-OT-02 · PRJ-B-006-BL-OT-B01

    Establish the controlled final cost, schedule, contract, and claims closeout needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-OT-007

    Controlled Records Archive and Retrieval Index

    PRJ-B-006 · Operational Turnover / Closeout · Registers and indexes · 2016-09-21 · PRJ-B-006-WBS-OT-03 · PRJ-B-006-BL-OT-B01

    Establish the controlled controlled records archive and retrieval index needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-006-SE-OT-008

    Lessons Learned and Benefit Realization Baseline

    PRJ-B-006 · Operational Turnover / Closeout · Baselines and manifests · 2016-09-30 · PRJ-B-006-WBS-OT-04 · PRJ-B-006-BL-OT-B01

    Establish the controlled lessons learned and benefit realization baseline needed to execute Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to coordinated sustainable utilities system within PRJ-B-006 - Sustainable Water Treatment, Heat Recovery, and Wastewater Reuse. The project scope is: Nonchemical water treatment, steam heat recovery, ozonation and filtration, reclaimed-water distribution, instruments, HMI/data acquisition, commissioning, performance verification, and utility-team handoff. Operating utility improvements with verified savings, reduced chemical consumption, reclaimed water, monitoring, and preventive-maintenance ownership.

  • PRJ-B-007-SE-F1-001

    Business Case and Opportunity Statement

    PRJ-B-007 · FEL 1 / Concept · Business and decision documents · 2016-01-12 · PRJ-B-007-WBS-F1-01 · PRJ-B-007-BL-F1-B01

    Establish the controlled business case and opportunity statement needed to execute 480 V Electrical Service and Power-Quality Modernization during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-F1-002

    Project Charter and Initial Scope / Battery Limits

    PRJ-B-007 · FEL 1 / Concept · Business and decision documents · 2016-01-25 · PRJ-B-007-WBS-F1-02 · PRJ-B-007-BL-F1-B01

    Establish the controlled project charter and initial scope / battery limits needed to execute 480 V Electrical Service and Power-Quality Modernization during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-F1-003

    Stakeholder Needs and Operating Context

    PRJ-B-007 · FEL 1 / Concept · Reports · 2016-02-07 · PRJ-B-007-WBS-F1-03 · PRJ-B-007-BL-F1-B01

    Establish the controlled stakeholder needs and operating context needed to execute 480 V Electrical Service and Power-Quality Modernization during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-F1-004

    Concept Alternatives and Screening Study

    PRJ-B-007 · FEL 1 / Concept · Studies and analyses · 2016-02-20 · PRJ-B-007-WBS-F1-04 · PRJ-B-007-BL-F1-B01

    Establish the controlled concept alternatives and screening study needed to execute 480 V Electrical Service and Power-Quality Modernization during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-F1-005

    Preliminary Schedule and Class 5 Cost Estimate

    PRJ-B-007 · FEL 1 / Concept · Studies and analyses · 2016-03-04 · PRJ-B-007-WBS-F1-01 · PRJ-B-007-BL-F1-B01

    Establish the controlled preliminary schedule and class 5 cost estimate needed to execute 480 V Electrical Service and Power-Quality Modernization during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-F1-006

    Initial Risk, Assumption, and Decision Register

    PRJ-B-007 · FEL 1 / Concept · Registers and indexes · 2016-03-17 · PRJ-B-007-WBS-F1-02 · PRJ-B-007-BL-F1-B01

    Establish the controlled initial risk, assumption, and decision register needed to execute 480 V Electrical Service and Power-Quality Modernization during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-F2-001

    Option Study and Weighted Decision Analysis

    PRJ-B-007 · FEL 2 / Select · Studies and analyses · 2016-03-30 · PRJ-B-007-WBS-F2-01 · PRJ-B-007-BL-F2-B01

    Establish the controlled option study and weighted decision analysis needed to execute 480 V Electrical Service and Power-Quality Modernization during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-F2-002

    Design Basis Memorandum

    PRJ-B-007 · FEL 2 / Select · Design definitions · 2016-04-13 · PRJ-B-007-WBS-F2-02 · PRJ-B-007-BL-F2-B01

    Establish the controlled design basis memorandum needed to execute 480 V Electrical Service and Power-Quality Modernization during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-F2-003

    Site, Layout, and Process Alternative Study

    PRJ-B-007 · FEL 2 / Select · Studies and analyses · 2016-04-27 · PRJ-B-007-WBS-F2-03 · PRJ-B-007-BL-F2-B01

    Establish the controlled site, layout, and process alternative study needed to execute 480 V Electrical Service and Power-Quality Modernization during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-F2-004

    Stakeholder and System Requirements Specification

    PRJ-B-007 · FEL 2 / Select · Specifications · 2016-05-11 · PRJ-B-007-WBS-F2-04 · PRJ-B-007-BL-F2-B01

    Establish the controlled stakeholder and system requirements specification needed to execute 480 V Electrical Service and Power-Quality Modernization during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-F2-005

    Concept Architecture and Interface Definition

    PRJ-B-007 · FEL 2 / Select · Design definitions · 2016-05-24 · PRJ-B-007-WBS-F2-01 · PRJ-B-007-BL-F2-B01

    Establish the controlled concept architecture and interface definition needed to execute 480 V Electrical Service and Power-Quality Modernization during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-F2-006

    HAZID / Constructability / Operability Study

    PRJ-B-007 · FEL 2 / Select · Studies and analyses · 2016-06-07 · PRJ-B-007-WBS-F2-02 · PRJ-B-007-BL-F2-B01

    Establish the controlled hazid / constructability / operability study needed to execute 480 V Electrical Service and Power-Quality Modernization during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-F2-007

    Class 4 Estimate and Level 2 Schedule

    PRJ-B-007 · FEL 2 / Select · Studies and analyses · 2016-06-21 · PRJ-B-007-WBS-F2-03 · PRJ-B-007-BL-F2-B01

    Establish the controlled class 4 estimate and level 2 schedule needed to execute 480 V Electrical Service and Power-Quality Modernization during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-F2-008

    Selected Concept and G2 Decision Dossier

    PRJ-B-007 · FEL 2 / Select · Dossiers and manual sets · 2016-07-05 · PRJ-B-007-WBS-F2-04 · PRJ-B-007-BL-F2-B01

    Establish the controlled selected concept and g2 decision dossier needed to execute 480 V Electrical Service and Power-Quality Modernization during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-F3-001

    Defined Scope and Design Deliverables Register

    PRJ-B-007 · FEL 3 / Define · Registers and indexes · 2016-07-19 · PRJ-B-007-WBS-F3-01 · PRJ-B-007-BL-F3-B01

    Establish the controlled defined scope and design deliverables register needed to execute 480 V Electrical Service and Power-Quality Modernization during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-F3-002

    Baselined System Requirements Specification

    PRJ-B-007 · FEL 3 / Define · Specifications · 2016-08-02 · PRJ-B-007-WBS-F3-02 · PRJ-B-007-BL-F3-B01

    Establish the controlled baselined system requirements specification needed to execute 480 V Electrical Service and Power-Quality Modernization during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-F3-003

    System Architecture and Interface Control Document

    PRJ-B-007 · FEL 3 / Define · Design definitions · 2016-08-16 · PRJ-B-007-WBS-F3-03 · PRJ-B-007-BL-F3-B01

    Establish the controlled system architecture and interface control document needed to execute 480 V Electrical Service and Power-Quality Modernization during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-F3-004

    Project Execution Plan

    PRJ-B-007 · FEL 3 / Define · Plans · 2016-08-30 · PRJ-B-007-WBS-F3-04 · PRJ-B-007-BL-F3-B01

    Establish the controlled project execution plan needed to execute 480 V Electrical Service and Power-Quality Modernization during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-F3-005

    WBS, Work Package, and Responsibility Baseline

    PRJ-B-007 · FEL 3 / Define · Baselines and manifests · 2016-09-14 · PRJ-B-007-WBS-F3-01 · PRJ-B-007-BL-F3-B01

    Establish the controlled wbs, work package, and responsibility baseline needed to execute 480 V Electrical Service and Power-Quality Modernization during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-F3-006

    Class 3 Estimate and Cost Baseline

    PRJ-B-007 · FEL 3 / Define · Baselines and manifests · 2016-09-28 · PRJ-B-007-WBS-F3-02 · PRJ-B-007-BL-F3-B01

    Establish the controlled class 3 estimate and cost baseline needed to execute 480 V Electrical Service and Power-Quality Modernization during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-F3-007

    Coordinated Control Schedule and Resource Plan

    PRJ-B-007 · FEL 3 / Define · Plans · 2016-10-12 · PRJ-B-007-WBS-F3-03 · PRJ-B-007-BL-F3-B01

    Establish the controlled coordinated control schedule and resource plan needed to execute 480 V Electrical Service and Power-Quality Modernization during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-F3-008

    Procurement and Contracting Plan

    PRJ-B-007 · FEL 3 / Define · Plans · 2016-10-26 · PRJ-B-007-WBS-F3-04 · PRJ-B-007-BL-F3-B01

    Establish the controlled procurement and contracting plan needed to execute 480 V Electrical Service and Power-Quality Modernization during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-F3-009

    V&V, Acceptance, Commissioning, and Turnover Strategy

    PRJ-B-007 · FEL 3 / Define · Plans · 2016-11-09 · PRJ-B-007-WBS-F3-01 · PRJ-B-007-BL-F3-B01

    Establish the controlled v&v, acceptance, commissioning, and turnover strategy needed to execute 480 V Electrical Service and Power-Quality Modernization during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-F3-010

    FID / G3 Approval and Baseline Manifest

    PRJ-B-007 · FEL 3 / Define · Certificates and approvals · 2016-11-24 · PRJ-B-007-WBS-F3-02 · PRJ-B-007-BL-F3-B01

    Establish the controlled fid / g3 approval and baseline manifest needed to execute 480 V Electrical Service and Power-Quality Modernization during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-DD-001

    Detailed Design Management Plan

    PRJ-B-007 · Detailed Design · Plans · 2016-12-08 · PRJ-B-007-WBS-DD-01 · PRJ-B-007-BL-DD-B01

    Establish the controlled detailed design management plan needed to execute 480 V Electrical Service and Power-Quality Modernization during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-DD-002

    Process / Functional Design Package

    PRJ-B-007 · Detailed Design · Design definitions · 2016-12-22 · PRJ-B-007-WBS-DD-02 · PRJ-B-007-BL-DD-B01

    Establish the controlled process / functional design package needed to execute 480 V Electrical Service and Power-Quality Modernization during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-DD-003

    Mechanical and Piping Design Package

    PRJ-B-007 · Detailed Design · Design definitions · 2017-01-05 · PRJ-B-007-WBS-DD-03 · PRJ-B-007-BL-DD-B01

    Establish the controlled mechanical and piping design package needed to execute 480 V Electrical Service and Power-Quality Modernization during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-DD-004

    Electrical Power and Controls Design Package

    PRJ-B-007 · Detailed Design · Design definitions · 2017-01-19 · PRJ-B-007-WBS-DD-04 · PRJ-B-007-BL-DD-B01

    Establish the controlled electrical power and controls design package needed to execute 480 V Electrical Service and Power-Quality Modernization during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-DD-005

    Civil, Structural, and Architectural Design Package

    PRJ-B-007 · Detailed Design · Design definitions · 2017-02-03 · PRJ-B-007-WBS-DD-01 · PRJ-B-007-BL-DD-B01

    Establish the controlled civil, structural, and architectural design package needed to execute 480 V Electrical Service and Power-Quality Modernization during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-DD-006

    Instrumentation, Automation, and Data Design Package

    PRJ-B-007 · Detailed Design · Design definitions · 2017-02-17 · PRJ-B-007-WBS-DD-02 · PRJ-B-007-BL-DD-B01

    Establish the controlled instrumentation, automation, and data design package needed to execute 480 V Electrical Service and Power-Quality Modernization during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-DD-007

    Safety, Reliability, and Maintainability Analysis

    PRJ-B-007 · Detailed Design · Studies and analyses · 2017-03-03 · PRJ-B-007-WBS-DD-03 · PRJ-B-007-BL-DD-B01

    Establish the controlled safety, reliability, and maintainability analysis needed to execute 480 V Electrical Service and Power-Quality Modernization during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-DD-008

    Design Review and Comment Resolution Record

    PRJ-B-007 · Detailed Design · Records and logs · 2017-03-17 · PRJ-B-007-WBS-DD-04 · PRJ-B-007-BL-DD-B01

    Establish the controlled design review and comment resolution record needed to execute 480 V Electrical Service and Power-Quality Modernization during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-DD-009

    Issued-for-Construction Design Baseline

    PRJ-B-007 · Detailed Design · Baselines and manifests · 2017-03-31 · PRJ-B-007-WBS-DD-01 · PRJ-B-007-BL-DD-B01

    Establish the controlled issued-for-construction design baseline needed to execute 480 V Electrical Service and Power-Quality Modernization during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-DD-010

    Design V&V Evidence Index

    PRJ-B-007 · Detailed Design · Registers and indexes · 2017-04-15 · PRJ-B-007-WBS-DD-02 · PRJ-B-007-BL-DD-B01

    Establish the controlled design v&v evidence index needed to execute 480 V Electrical Service and Power-Quality Modernization during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-PR-001

    Procurement Package and Bid List

    PRJ-B-007 · Procurement · Registers and indexes · 2017-04-29 · PRJ-B-007-WBS-PR-01 · PRJ-B-007-BL-PR-B01

    Establish the controlled procurement package and bid list needed to execute 480 V Electrical Service and Power-Quality Modernization during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-PR-002

    Technical Requisition and Datasheet Set

    PRJ-B-007 · Procurement · Specifications · 2017-05-14 · PRJ-B-007-WBS-PR-02 · PRJ-B-007-BL-PR-B01

    Establish the controlled technical requisition and datasheet set needed to execute 480 V Electrical Service and Power-Quality Modernization during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-PR-003

    Commercial Bid Evaluation and Award Recommendation

    PRJ-B-007 · Procurement · Studies and analyses · 2017-05-29 · PRJ-B-007-WBS-PR-03 · PRJ-B-007-BL-PR-B01

    Establish the controlled commercial bid evaluation and award recommendation needed to execute 480 V Electrical Service and Power-Quality Modernization during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-PR-004

    Technical Bid Evaluation and Clarification Log

    PRJ-B-007 · Procurement · Registers and indexes · 2017-06-12 · PRJ-B-007-WBS-PR-04 · PRJ-B-007-BL-PR-B01

    Establish the controlled technical bid evaluation and clarification log needed to execute 480 V Electrical Service and Power-Quality Modernization during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-PR-005

    Purchase Order / Contract and Scope of Supply

    PRJ-B-007 · Procurement · Business and decision documents · 2017-06-27 · PRJ-B-007-WBS-PR-01 · PRJ-B-007-BL-PR-B01

    Establish the controlled purchase order / contract and scope of supply needed to execute 480 V Electrical Service and Power-Quality Modernization during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-PR-006

    Supplier Quality and Inspection Plan

    PRJ-B-007 · Procurement · Plans · 2017-07-12 · PRJ-B-007-WBS-PR-02 · PRJ-B-007-BL-PR-B01

    Establish the controlled supplier quality and inspection plan needed to execute 480 V Electrical Service and Power-Quality Modernization during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-PR-007

    Vendor Data, Submittal, and RFI Register

    PRJ-B-007 · Procurement · Registers and indexes · 2017-07-26 · PRJ-B-007-WBS-PR-03 · PRJ-B-007-BL-PR-B01

    Establish the controlled vendor data, submittal, and rfi register needed to execute 480 V Electrical Service and Power-Quality Modernization during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-PR-008

    Expediting and Logistics Plan

    PRJ-B-007 · Procurement · Plans · 2017-08-10 · PRJ-B-007-WBS-PR-04 · PRJ-B-007-BL-PR-B01

    Establish the controlled expediting and logistics plan needed to execute 480 V Electrical Service and Power-Quality Modernization during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-PR-009

    Factory Acceptance Test Procedure and Report

    PRJ-B-007 · Procurement · Procedures · 2017-08-25 · PRJ-B-007-WBS-PR-01 · PRJ-B-007-BL-PR-B01

    Establish the controlled factory acceptance test procedure and report needed to execute 480 V Electrical Service and Power-Quality Modernization during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-FC-001

    Construction / Fabrication Execution Plan

    PRJ-B-007 · Fabrication / Construction · Plans · 2017-09-15 · PRJ-B-007-WBS-FC-01 · PRJ-B-007-BL-FC-B01

    Establish the controlled construction / fabrication execution plan needed to execute 480 V Electrical Service and Power-Quality Modernization during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-FC-002

    Site Logistics, Safety, and Permit Plan

    PRJ-B-007 · Fabrication / Construction · Plans · 2017-10-07 · PRJ-B-007-WBS-FC-02 · PRJ-B-007-BL-FC-B01

    Establish the controlled site logistics, safety, and permit plan needed to execute 480 V Electrical Service and Power-Quality Modernization during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-FC-003

    Fabrication Drawing and Shop Package

    PRJ-B-007 · Fabrication / Construction · Design definitions · 2017-10-29 · PRJ-B-007-WBS-FC-03 · PRJ-B-007-BL-FC-B01

    Establish the controlled fabrication drawing and shop package needed to execute 480 V Electrical Service and Power-Quality Modernization during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-FC-004

    Field Work Package and Installation Method

    PRJ-B-007 · Fabrication / Construction · Procedures · 2017-11-20 · PRJ-B-007-WBS-FC-04 · PRJ-B-007-BL-FC-B01

    Establish the controlled field work package and installation method needed to execute 480 V Electrical Service and Power-Quality Modernization during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-FC-005

    Inspection and Test Plan / Quality Records

    PRJ-B-007 · Fabrication / Construction · Plans · 2017-12-12 · PRJ-B-007-WBS-FC-01 · PRJ-B-007-BL-FC-B01

    Establish the controlled inspection and test plan / quality records needed to execute 480 V Electrical Service and Power-Quality Modernization during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-FC-006

    Daily Progress and Quantity Report

    PRJ-B-007 · Fabrication / Construction · Records and logs · 2018-01-03 · PRJ-B-007-WBS-FC-02 · PRJ-B-007-BL-FC-B01

    Establish the controlled daily progress and quantity report needed to execute 480 V Electrical Service and Power-Quality Modernization during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-FC-007

    Nonconformity and Corrective Action Record

    PRJ-B-007 · Fabrication / Construction · Records and logs · 2018-01-25 · PRJ-B-007-WBS-FC-03 · PRJ-B-007-BL-FC-B01

    Establish the controlled nonconformity and corrective action record needed to execute 480 V Electrical Service and Power-Quality Modernization during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-FC-008

    Redline Drawing and Field Change Register

    PRJ-B-007 · Fabrication / Construction · Registers and indexes · 2018-02-16 · PRJ-B-007-WBS-FC-04 · PRJ-B-007-BL-FC-B01

    Establish the controlled redline drawing and field change register needed to execute 480 V Electrical Service and Power-Quality Modernization during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-FC-009

    Mechanical Completion Certificate and Punch List

    PRJ-B-007 · Fabrication / Construction · Certificates and approvals · 2018-03-10 · PRJ-B-007-WBS-FC-01 · PRJ-B-007-BL-FC-B01

    Establish the controlled mechanical completion certificate and punch list needed to execute 480 V Electrical Service and Power-Quality Modernization during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-IN-001

    System Coordination and Interface Plan

    PRJ-B-007 · Installation and Interface Coordination · Plans · 2018-03-24 · PRJ-B-007-WBS-IN-01 · PRJ-B-007-BL-IN-B01

    Establish the controlled system coordination and interface plan needed to execute 480 V Electrical Service and Power-Quality Modernization during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-IN-002

    Installation Completion and Walkdown Record

    PRJ-B-007 · Installation and Interface Coordination · Records and logs · 2018-04-07 · PRJ-B-007-WBS-IN-02 · PRJ-B-007-BL-IN-B01

    Establish the controlled installation completion and walkdown record needed to execute 480 V Electrical Service and Power-Quality Modernization during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-IN-003

    Controls / Software Configuration Baseline

    PRJ-B-007 · Installation and Interface Coordination · Baselines and manifests · 2018-04-21 · PRJ-B-007-WBS-IN-03 · PRJ-B-007-BL-IN-B01

    Establish the controlled controls / software configuration baseline needed to execute 480 V Electrical Service and Power-Quality Modernization during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-IN-004

    Loop Check, Continuity, and Calibration Records

    PRJ-B-007 · Installation and Interface Coordination · Records and logs · 2018-05-05 · PRJ-B-007-WBS-IN-04 · PRJ-B-007-BL-IN-B01

    Establish the controlled loop check, continuity, and calibration records needed to execute 480 V Electrical Service and Power-Quality Modernization during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-IN-005

    Cleaning, Flushing, and Pre-Operational Test Record

    PRJ-B-007 · Installation and Interface Coordination · Procedures · 2018-05-19 · PRJ-B-007-WBS-IN-01 · PRJ-B-007-BL-IN-B01

    Establish the controlled cleaning, flushing, and pre-operational test record needed to execute 480 V Electrical Service and Power-Quality Modernization during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-IN-006

    System Completion Dossier

    PRJ-B-007 · Installation and Interface Coordination · Dossiers and manual sets · 2018-06-02 · PRJ-B-007-WBS-IN-02 · PRJ-B-007-BL-IN-B01

    Establish the controlled system completion dossier needed to execute 480 V Electrical Service and Power-Quality Modernization during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-IN-007

    Ready-for-Commissioning Certificate

    PRJ-B-007 · Installation and Interface Coordination · Certificates and approvals · 2018-06-17 · PRJ-B-007-WBS-IN-03 · PRJ-B-007-BL-IN-B01

    Establish the controlled ready-for-commissioning certificate needed to execute 480 V Electrical Service and Power-Quality Modernization during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-CS-001

    Commissioning and Startup Plan

    PRJ-B-007 · Commissioning / Startup · Plans · 2018-06-30 · PRJ-B-007-WBS-CS-01 · PRJ-B-007-BL-CS-B01

    Establish the controlled commissioning and startup plan needed to execute 480 V Electrical Service and Power-Quality Modernization during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-CS-002

    Pre-Startup Safety / Operational Readiness Review

    PRJ-B-007 · Commissioning / Startup · Reports · 2018-07-13 · PRJ-B-007-WBS-CS-02 · PRJ-B-007-BL-CS-B01

    Establish the controlled pre-startup safety / operational readiness review needed to execute 480 V Electrical Service and Power-Quality Modernization during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-CS-003

    Commissioning Procedure and Results

    PRJ-B-007 · Commissioning / Startup · Procedures · 2018-07-27 · PRJ-B-007-WBS-CS-03 · PRJ-B-007-BL-CS-B01

    Establish the controlled commissioning procedure and results needed to execute 480 V Electrical Service and Power-Quality Modernization during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-CS-004

    Startup and Ramp-Up Log

    PRJ-B-007 · Commissioning / Startup · Registers and indexes · 2018-08-09 · PRJ-B-007-WBS-CS-04 · PRJ-B-007-BL-CS-B01

    Establish the controlled startup and ramp-up log needed to execute 480 V Electrical Service and Power-Quality Modernization during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-CS-005

    Performance Guarantee and Capacity Test Report

    PRJ-B-007 · Commissioning / Startup · Studies and analyses · 2018-08-23 · PRJ-B-007-WBS-CS-01 · PRJ-B-007-BL-CS-B01

    Establish the controlled performance guarantee and capacity test report needed to execute 480 V Electrical Service and Power-Quality Modernization during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-CS-006

    Reliability Demonstration Run Report

    PRJ-B-007 · Commissioning / Startup · Studies and analyses · 2018-09-05 · PRJ-B-007-WBS-CS-02 · PRJ-B-007-BL-CS-B01

    Establish the controlled reliability demonstration run report needed to execute 480 V Electrical Service and Power-Quality Modernization during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-CS-007

    Operator and Maintainer Training Record

    PRJ-B-007 · Commissioning / Startup · Records and logs · 2018-09-19 · PRJ-B-007-WBS-CS-03 · PRJ-B-007-BL-CS-B01

    Establish the controlled operator and maintainer training record needed to execute 480 V Electrical Service and Power-Quality Modernization during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-CS-008

    Commissioning Anomaly and Punch Closure Register

    PRJ-B-007 · Commissioning / Startup · Registers and indexes · 2018-10-02 · PRJ-B-007-WBS-CS-04 · PRJ-B-007-BL-CS-B01

    Establish the controlled commissioning anomaly and punch closure register needed to execute 480 V Electrical Service and Power-Quality Modernization during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-CS-009

    Performance Acceptance Certificate

    PRJ-B-007 · Commissioning / Startup · Certificates and approvals · 2018-10-16 · PRJ-B-007-WBS-CS-01 · PRJ-B-007-BL-CS-B01

    Establish the controlled performance acceptance certificate needed to execute 480 V Electrical Service and Power-Quality Modernization during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-OT-001

    As-Built / as-Configured Baseline Manifest

    PRJ-B-007 · Operational Turnover / Closeout · Baselines and manifests · 2018-10-25 · PRJ-B-007-WBS-OT-01 · PRJ-B-007-BL-OT-B01

    Establish the controlled as-built / as-configured baseline manifest needed to execute 480 V Electrical Service and Power-Quality Modernization during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-OT-002

    Operations and Maintenance Manual Set

    PRJ-B-007 · Operational Turnover / Closeout · Dossiers and manual sets · 2018-11-04 · PRJ-B-007-WBS-OT-02 · PRJ-B-007-BL-OT-B01

    Establish the controlled operations and maintenance manual set needed to execute 480 V Electrical Service and Power-Quality Modernization during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-OT-003

    Asset, Spare Parts, and Warranty Register

    PRJ-B-007 · Operational Turnover / Closeout · Registers and indexes · 2018-11-13 · PRJ-B-007-WBS-OT-03 · PRJ-B-007-BL-OT-B01

    Establish the controlled asset, spare parts, and warranty register needed to execute 480 V Electrical Service and Power-Quality Modernization during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-OT-004

    Final Technical and Commercial Acceptance Certificate

    PRJ-B-007 · Operational Turnover / Closeout · Certificates and approvals · 2018-11-23 · PRJ-B-007-WBS-OT-04 · PRJ-B-007-BL-OT-B01

    Establish the controlled final technical and commercial acceptance certificate needed to execute 480 V Electrical Service and Power-Quality Modernization during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-OT-005

    Operational Turnover Dossier and Ownership Transfer

    PRJ-B-007 · Operational Turnover / Closeout · Dossiers and manual sets · 2018-12-02 · PRJ-B-007-WBS-OT-01 · PRJ-B-007-BL-OT-B01

    Establish the controlled operational turnover dossier and ownership transfer needed to execute 480 V Electrical Service and Power-Quality Modernization during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-OT-006

    Final Cost, Schedule, Contract, and Claims Closeout

    PRJ-B-007 · Operational Turnover / Closeout · Studies and analyses · 2018-12-12 · PRJ-B-007-WBS-OT-02 · PRJ-B-007-BL-OT-B01

    Establish the controlled final cost, schedule, contract, and claims closeout needed to execute 480 V Electrical Service and Power-Quality Modernization during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-OT-007

    Controlled Records Archive and Retrieval Index

    PRJ-B-007 · Operational Turnover / Closeout · Registers and indexes · 2018-12-21 · PRJ-B-007-WBS-OT-03 · PRJ-B-007-BL-OT-B01

    Establish the controlled controlled records archive and retrieval index needed to execute 480 V Electrical Service and Power-Quality Modernization during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-007-SE-OT-008

    Lessons Learned and Benefit Realization Baseline

    PRJ-B-007 · Operational Turnover / Closeout · Baselines and manifests · 2018-12-31 · PRJ-B-007-WBS-OT-04 · PRJ-B-007-BL-OT-B01

    Establish the controlled lessons learned and benefit realization baseline needed to execute 480 V Electrical Service and Power-Quality Modernization during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Electrical service and distribution modernization within PRJ-B-007 - 480 V Electrical Service and Power-Quality Modernization. The project scope is: Utility coordination, load study, transformer and switchgear strategy, feeders, conduit, panelboards, protective coordination, outage planning, installation, energization, monitoring, commissioning, and turnover. Energized 2,000 A, 480 V service with verified protection, power quality, spare capacity, operating procedures, and five-year load plan.

  • PRJ-B-008-SE-F1-001

    Business Case and Opportunity Statement

    PRJ-B-008 · FEL 1 / Concept · Business and decision documents · 2019-01-05 · PRJ-B-008-WBS-F1-01 · PRJ-B-008-BL-F1-B01

    Establish the controlled business case and opportunity statement needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-F1-002

    Project Charter and Initial Scope / Battery Limits

    PRJ-B-008 · FEL 1 / Concept · Business and decision documents · 2019-01-10 · PRJ-B-008-WBS-F1-02 · PRJ-B-008-BL-F1-B01

    Establish the controlled project charter and initial scope / battery limits needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-F1-003

    Stakeholder Needs and Operating Context

    PRJ-B-008 · FEL 1 / Concept · Reports · 2019-01-15 · PRJ-B-008-WBS-F1-03 · PRJ-B-008-BL-F1-B01

    Establish the controlled stakeholder needs and operating context needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-F1-004

    Concept Alternatives and Screening Study

    PRJ-B-008 · FEL 1 / Concept · Studies and analyses · 2019-01-20 · PRJ-B-008-WBS-F1-04 · PRJ-B-008-BL-F1-B01

    Establish the controlled concept alternatives and screening study needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-F1-005

    Preliminary Schedule and Class 5 Cost Estimate

    PRJ-B-008 · FEL 1 / Concept · Studies and analyses · 2019-01-25 · PRJ-B-008-WBS-F1-01 · PRJ-B-008-BL-F1-B01

    Establish the controlled preliminary schedule and class 5 cost estimate needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-F1-006

    Initial Risk, Assumption, and Decision Register

    PRJ-B-008 · FEL 1 / Concept · Registers and indexes · 2019-01-30 · PRJ-B-008-WBS-F1-02 · PRJ-B-008-BL-F1-B01

    Establish the controlled initial risk, assumption, and decision register needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-F2-001

    Option Study and Weighted Decision Analysis

    PRJ-B-008 · FEL 2 / Select · Studies and analyses · 2019-02-04 · PRJ-B-008-WBS-F2-01 · PRJ-B-008-BL-F2-B01

    Establish the controlled option study and weighted decision analysis needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-F2-002

    Design Basis Memorandum

    PRJ-B-008 · FEL 2 / Select · Design definitions · 2019-02-09 · PRJ-B-008-WBS-F2-02 · PRJ-B-008-BL-F2-B01

    Establish the controlled design basis memorandum needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-F2-003

    Site, Layout, and Process Alternative Study

    PRJ-B-008 · FEL 2 / Select · Studies and analyses · 2019-02-15 · PRJ-B-008-WBS-F2-03 · PRJ-B-008-BL-F2-B01

    Establish the controlled site, layout, and process alternative study needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-F2-004

    Stakeholder and System Requirements Specification

    PRJ-B-008 · FEL 2 / Select · Specifications · 2019-02-20 · PRJ-B-008-WBS-F2-04 · PRJ-B-008-BL-F2-B01

    Establish the controlled stakeholder and system requirements specification needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-F2-005

    Concept Architecture and Interface Definition

    PRJ-B-008 · FEL 2 / Select · Design definitions · 2019-02-25 · PRJ-B-008-WBS-F2-01 · PRJ-B-008-BL-F2-B01

    Establish the controlled concept architecture and interface definition needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-F2-006

    HAZID / Constructability / Operability Study

    PRJ-B-008 · FEL 2 / Select · Studies and analyses · 2019-03-03 · PRJ-B-008-WBS-F2-02 · PRJ-B-008-BL-F2-B01

    Establish the controlled hazid / constructability / operability study needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-F2-007

    Class 4 Estimate and Level 2 Schedule

    PRJ-B-008 · FEL 2 / Select · Studies and analyses · 2019-03-08 · PRJ-B-008-WBS-F2-03 · PRJ-B-008-BL-F2-B01

    Establish the controlled class 4 estimate and level 2 schedule needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-F2-008

    Selected Concept and G2 Decision Dossier

    PRJ-B-008 · FEL 2 / Select · Dossiers and manual sets · 2019-03-14 · PRJ-B-008-WBS-F2-04 · PRJ-B-008-BL-F2-B01

    Establish the controlled selected concept and g2 decision dossier needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-F3-001

    Defined Scope and Design Deliverables Register

    PRJ-B-008 · FEL 3 / Define · Registers and indexes · 2019-03-19 · PRJ-B-008-WBS-F3-01 · PRJ-B-008-BL-F3-B01

    Establish the controlled defined scope and design deliverables register needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-F3-002

    Baselined System Requirements Specification

    PRJ-B-008 · FEL 3 / Define · Specifications · 2019-03-25 · PRJ-B-008-WBS-F3-02 · PRJ-B-008-BL-F3-B01

    Establish the controlled baselined system requirements specification needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-F3-003

    System Architecture and Interface Control Document

    PRJ-B-008 · FEL 3 / Define · Design definitions · 2019-03-30 · PRJ-B-008-WBS-F3-03 · PRJ-B-008-BL-F3-B01

    Establish the controlled system architecture and interface control document needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-F3-004

    Project Execution Plan

    PRJ-B-008 · FEL 3 / Define · Plans · 2019-04-05 · PRJ-B-008-WBS-F3-04 · PRJ-B-008-BL-F3-B01

    Establish the controlled project execution plan needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-F3-005

    WBS, Work Package, and Responsibility Baseline

    PRJ-B-008 · FEL 3 / Define · Baselines and manifests · 2019-04-10 · PRJ-B-008-WBS-F3-01 · PRJ-B-008-BL-F3-B01

    Establish the controlled wbs, work package, and responsibility baseline needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-F3-006

    Class 3 Estimate and Cost Baseline

    PRJ-B-008 · FEL 3 / Define · Baselines and manifests · 2019-04-16 · PRJ-B-008-WBS-F3-02 · PRJ-B-008-BL-F3-B01

    Establish the controlled class 3 estimate and cost baseline needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-F3-007

    Coordinated Control Schedule and Resource Plan

    PRJ-B-008 · FEL 3 / Define · Plans · 2019-04-21 · PRJ-B-008-WBS-F3-03 · PRJ-B-008-BL-F3-B01

    Establish the controlled coordinated control schedule and resource plan needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-F3-008

    Procurement and Contracting Plan

    PRJ-B-008 · FEL 3 / Define · Plans · 2019-04-27 · PRJ-B-008-WBS-F3-04 · PRJ-B-008-BL-F3-B01

    Establish the controlled procurement and contracting plan needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-F3-009

    V&V, Acceptance, Commissioning, and Turnover Strategy

    PRJ-B-008 · FEL 3 / Define · Plans · 2019-05-02 · PRJ-B-008-WBS-F3-01 · PRJ-B-008-BL-F3-B01

    Establish the controlled v&v, acceptance, commissioning, and turnover strategy needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-F3-010

    FID / G3 Approval and Baseline Manifest

    PRJ-B-008 · FEL 3 / Define · Certificates and approvals · 2019-05-08 · PRJ-B-008-WBS-F3-02 · PRJ-B-008-BL-F3-B01

    Establish the controlled fid / g3 approval and baseline manifest needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-DD-001

    Detailed Design Management Plan

    PRJ-B-008 · Detailed Design · Plans · 2019-05-13 · PRJ-B-008-WBS-DD-01 · PRJ-B-008-BL-DD-B01

    Establish the controlled detailed design management plan needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-DD-002

    Process / Functional Design Package

    PRJ-B-008 · Detailed Design · Design definitions · 2019-05-19 · PRJ-B-008-WBS-DD-02 · PRJ-B-008-BL-DD-B01

    Establish the controlled process / functional design package needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-DD-003

    Mechanical and Piping Design Package

    PRJ-B-008 · Detailed Design · Design definitions · 2019-05-24 · PRJ-B-008-WBS-DD-03 · PRJ-B-008-BL-DD-B01

    Establish the controlled mechanical and piping design package needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-DD-004

    Electrical Power and Controls Design Package

    PRJ-B-008 · Detailed Design · Design definitions · 2019-05-30 · PRJ-B-008-WBS-DD-04 · PRJ-B-008-BL-DD-B01

    Establish the controlled electrical power and controls design package needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-DD-005

    Civil, Structural, and Architectural Design Package

    PRJ-B-008 · Detailed Design · Design definitions · 2019-06-04 · PRJ-B-008-WBS-DD-01 · PRJ-B-008-BL-DD-B01

    Establish the controlled civil, structural, and architectural design package needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-DD-006

    Instrumentation, Automation, and Data Design Package

    PRJ-B-008 · Detailed Design · Design definitions · 2019-06-10 · PRJ-B-008-WBS-DD-02 · PRJ-B-008-BL-DD-B01

    Establish the controlled instrumentation, automation, and data design package needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-DD-007

    Safety, Reliability, and Maintainability Analysis

    PRJ-B-008 · Detailed Design · Studies and analyses · 2019-06-15 · PRJ-B-008-WBS-DD-03 · PRJ-B-008-BL-DD-B01

    Establish the controlled safety, reliability, and maintainability analysis needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-DD-008

    Design Review and Comment Resolution Record

    PRJ-B-008 · Detailed Design · Records and logs · 2019-06-21 · PRJ-B-008-WBS-DD-04 · PRJ-B-008-BL-DD-B01

    Establish the controlled design review and comment resolution record needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-DD-009

    Issued-for-Construction Design Baseline

    PRJ-B-008 · Detailed Design · Baselines and manifests · 2019-06-26 · PRJ-B-008-WBS-DD-01 · PRJ-B-008-BL-DD-B01

    Establish the controlled issued-for-construction design baseline needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-DD-010

    Design V&V Evidence Index

    PRJ-B-008 · Detailed Design · Registers and indexes · 2019-07-02 · PRJ-B-008-WBS-DD-02 · PRJ-B-008-BL-DD-B01

    Establish the controlled design v&v evidence index needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-PR-001

    Procurement Package and Bid List

    PRJ-B-008 · Procurement · Registers and indexes · 2019-07-07 · PRJ-B-008-WBS-PR-01 · PRJ-B-008-BL-PR-B01

    Establish the controlled procurement package and bid list needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-PR-002

    Technical Requisition and Datasheet Set

    PRJ-B-008 · Procurement · Specifications · 2019-07-13 · PRJ-B-008-WBS-PR-02 · PRJ-B-008-BL-PR-B01

    Establish the controlled technical requisition and datasheet set needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-PR-003

    Commercial Bid Evaluation and Award Recommendation

    PRJ-B-008 · Procurement · Studies and analyses · 2019-07-19 · PRJ-B-008-WBS-PR-03 · PRJ-B-008-BL-PR-B01

    Establish the controlled commercial bid evaluation and award recommendation needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-PR-004

    Technical Bid Evaluation and Clarification Log

    PRJ-B-008 · Procurement · Registers and indexes · 2019-07-24 · PRJ-B-008-WBS-PR-04 · PRJ-B-008-BL-PR-B01

    Establish the controlled technical bid evaluation and clarification log needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-PR-005

    Purchase Order / Contract and Scope of Supply

    PRJ-B-008 · Procurement · Business and decision documents · 2019-07-30 · PRJ-B-008-WBS-PR-01 · PRJ-B-008-BL-PR-B01

    Establish the controlled purchase order / contract and scope of supply needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-PR-006

    Supplier Quality and Inspection Plan

    PRJ-B-008 · Procurement · Plans · 2019-08-05 · PRJ-B-008-WBS-PR-02 · PRJ-B-008-BL-PR-B01

    Establish the controlled supplier quality and inspection plan needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-PR-007

    Vendor Data, Submittal, and RFI Register

    PRJ-B-008 · Procurement · Registers and indexes · 2019-08-10 · PRJ-B-008-WBS-PR-03 · PRJ-B-008-BL-PR-B01

    Establish the controlled vendor data, submittal, and rfi register needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-PR-008

    Expediting and Logistics Plan

    PRJ-B-008 · Procurement · Plans · 2019-08-16 · PRJ-B-008-WBS-PR-04 · PRJ-B-008-BL-PR-B01

    Establish the controlled expediting and logistics plan needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-PR-009

    Factory Acceptance Test Procedure and Report

    PRJ-B-008 · Procurement · Procedures · 2019-08-22 · PRJ-B-008-WBS-PR-01 · PRJ-B-008-BL-PR-B01

    Establish the controlled factory acceptance test procedure and report needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-FC-001

    Construction / Fabrication Execution Plan

    PRJ-B-008 · Fabrication / Construction · Plans · 2019-08-30 · PRJ-B-008-WBS-FC-01 · PRJ-B-008-BL-FC-B01

    Establish the controlled construction / fabrication execution plan needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-FC-002

    Site Logistics, Safety, and Permit Plan

    PRJ-B-008 · Fabrication / Construction · Plans · 2019-09-08 · PRJ-B-008-WBS-FC-02 · PRJ-B-008-BL-FC-B01

    Establish the controlled site logistics, safety, and permit plan needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-FC-003

    Fabrication Drawing and Shop Package

    PRJ-B-008 · Fabrication / Construction · Design definitions · 2019-09-16 · PRJ-B-008-WBS-FC-03 · PRJ-B-008-BL-FC-B01

    Establish the controlled fabrication drawing and shop package needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-FC-004

    Field Work Package and Installation Method

    PRJ-B-008 · Fabrication / Construction · Procedures · 2019-09-25 · PRJ-B-008-WBS-FC-04 · PRJ-B-008-BL-FC-B01

    Establish the controlled field work package and installation method needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-FC-005

    Inspection and Test Plan / Quality Records

    PRJ-B-008 · Fabrication / Construction · Plans · 2019-10-03 · PRJ-B-008-WBS-FC-01 · PRJ-B-008-BL-FC-B01

    Establish the controlled inspection and test plan / quality records needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-FC-006

    Daily Progress and Quantity Report

    PRJ-B-008 · Fabrication / Construction · Records and logs · 2019-10-12 · PRJ-B-008-WBS-FC-02 · PRJ-B-008-BL-FC-B01

    Establish the controlled daily progress and quantity report needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-FC-007

    Nonconformity and Corrective Action Record

    PRJ-B-008 · Fabrication / Construction · Records and logs · 2019-10-20 · PRJ-B-008-WBS-FC-03 · PRJ-B-008-BL-FC-B01

    Establish the controlled nonconformity and corrective action record needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-FC-008

    Redline Drawing and Field Change Register

    PRJ-B-008 · Fabrication / Construction · Registers and indexes · 2019-10-29 · PRJ-B-008-WBS-FC-04 · PRJ-B-008-BL-FC-B01

    Establish the controlled redline drawing and field change register needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-FC-009

    Mechanical Completion Certificate and Punch List

    PRJ-B-008 · Fabrication / Construction · Certificates and approvals · 2019-11-07 · PRJ-B-008-WBS-FC-01 · PRJ-B-008-BL-FC-B01

    Establish the controlled mechanical completion certificate and punch list needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-IN-001

    System Coordination and Interface Plan

    PRJ-B-008 · Installation and Interface Coordination · Plans · 2019-11-12 · PRJ-B-008-WBS-IN-01 · PRJ-B-008-BL-IN-B01

    Establish the controlled system coordination and interface plan needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-IN-002

    Installation Completion and Walkdown Record

    PRJ-B-008 · Installation and Interface Coordination · Records and logs · 2019-11-17 · PRJ-B-008-WBS-IN-02 · PRJ-B-008-BL-IN-B01

    Establish the controlled installation completion and walkdown record needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-IN-003

    Controls / Software Configuration Baseline

    PRJ-B-008 · Installation and Interface Coordination · Baselines and manifests · 2019-11-23 · PRJ-B-008-WBS-IN-03 · PRJ-B-008-BL-IN-B01

    Establish the controlled controls / software configuration baseline needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-IN-004

    Loop Check, Continuity, and Calibration Records

    PRJ-B-008 · Installation and Interface Coordination · Records and logs · 2019-11-28 · PRJ-B-008-WBS-IN-04 · PRJ-B-008-BL-IN-B01

    Establish the controlled loop check, continuity, and calibration records needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-IN-005

    Cleaning, Flushing, and Pre-Operational Test Record

    PRJ-B-008 · Installation and Interface Coordination · Procedures · 2019-12-04 · PRJ-B-008-WBS-IN-01 · PRJ-B-008-BL-IN-B01

    Establish the controlled cleaning, flushing, and pre-operational test record needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-IN-006

    System Completion Dossier

    PRJ-B-008 · Installation and Interface Coordination · Dossiers and manual sets · 2019-12-09 · PRJ-B-008-WBS-IN-02 · PRJ-B-008-BL-IN-B01

    Establish the controlled system completion dossier needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-IN-007

    Ready-for-Commissioning Certificate

    PRJ-B-008 · Installation and Interface Coordination · Certificates and approvals · 2019-12-15 · PRJ-B-008-WBS-IN-03 · PRJ-B-008-BL-IN-B01

    Establish the controlled ready-for-commissioning certificate needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-CS-001

    Commissioning and Startup Plan

    PRJ-B-008 · Commissioning / Startup · Plans · 2019-12-20 · PRJ-B-008-WBS-CS-01 · PRJ-B-008-BL-CS-B01

    Establish the controlled commissioning and startup plan needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-CS-002

    Pre-Startup Safety / Operational Readiness Review

    PRJ-B-008 · Commissioning / Startup · Reports · 2019-12-25 · PRJ-B-008-WBS-CS-02 · PRJ-B-008-BL-CS-B01

    Establish the controlled pre-startup safety / operational readiness review needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-CS-003

    Commissioning Procedure and Results

    PRJ-B-008 · Commissioning / Startup · Procedures · 2019-12-30 · PRJ-B-008-WBS-CS-03 · PRJ-B-008-BL-CS-B01

    Establish the controlled commissioning procedure and results needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-CS-004

    Startup and Ramp-Up Log

    PRJ-B-008 · Commissioning / Startup · Registers and indexes · 2020-01-04 · PRJ-B-008-WBS-CS-04 · PRJ-B-008-BL-CS-B01

    Establish the controlled startup and ramp-up log needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-CS-005

    Performance Guarantee and Capacity Test Report

    PRJ-B-008 · Commissioning / Startup · Studies and analyses · 2020-01-10 · PRJ-B-008-WBS-CS-01 · PRJ-B-008-BL-CS-B01

    Establish the controlled performance guarantee and capacity test report needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-CS-006

    Reliability Demonstration Run Report

    PRJ-B-008 · Commissioning / Startup · Studies and analyses · 2020-01-15 · PRJ-B-008-WBS-CS-02 · PRJ-B-008-BL-CS-B01

    Establish the controlled reliability demonstration run report needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-CS-007

    Operator and Maintainer Training Record

    PRJ-B-008 · Commissioning / Startup · Records and logs · 2020-01-20 · PRJ-B-008-WBS-CS-03 · PRJ-B-008-BL-CS-B01

    Establish the controlled operator and maintainer training record needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-CS-008

    Commissioning Anomaly and Punch Closure Register

    PRJ-B-008 · Commissioning / Startup · Registers and indexes · 2020-01-25 · PRJ-B-008-WBS-CS-04 · PRJ-B-008-BL-CS-B01

    Establish the controlled commissioning anomaly and punch closure register needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-CS-009

    Performance Acceptance Certificate

    PRJ-B-008 · Commissioning / Startup · Certificates and approvals · 2020-01-31 · PRJ-B-008-WBS-CS-01 · PRJ-B-008-BL-CS-B01

    Establish the controlled performance acceptance certificate needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-OT-001

    As-Built / as-Configured Baseline Manifest

    PRJ-B-008 · Operational Turnover / Closeout · Baselines and manifests · 2020-02-03 · PRJ-B-008-WBS-OT-01 · PRJ-B-008-BL-OT-B01

    Establish the controlled as-built / as-configured baseline manifest needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-OT-002

    Operations and Maintenance Manual Set

    PRJ-B-008 · Operational Turnover / Closeout · Dossiers and manual sets · 2020-02-07 · PRJ-B-008-WBS-OT-02 · PRJ-B-008-BL-OT-B01

    Establish the controlled operations and maintenance manual set needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-OT-003

    Asset, Spare Parts, and Warranty Register

    PRJ-B-008 · Operational Turnover / Closeout · Registers and indexes · 2020-02-10 · PRJ-B-008-WBS-OT-03 · PRJ-B-008-BL-OT-B01

    Establish the controlled asset, spare parts, and warranty register needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-OT-004

    Final Technical and Commercial Acceptance Certificate

    PRJ-B-008 · Operational Turnover / Closeout · Certificates and approvals · 2020-02-14 · PRJ-B-008-WBS-OT-04 · PRJ-B-008-BL-OT-B01

    Establish the controlled final technical and commercial acceptance certificate needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-OT-005

    Operational Turnover Dossier and Ownership Transfer

    PRJ-B-008 · Operational Turnover / Closeout · Dossiers and manual sets · 2020-02-18 · PRJ-B-008-WBS-OT-01 · PRJ-B-008-BL-OT-B01

    Establish the controlled operational turnover dossier and ownership transfer needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-OT-006

    Final Cost, Schedule, Contract, and Claims Closeout

    PRJ-B-008 · Operational Turnover / Closeout · Studies and analyses · 2020-02-21 · PRJ-B-008-WBS-OT-02 · PRJ-B-008-BL-OT-B01

    Establish the controlled final cost, schedule, contract, and claims closeout needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-OT-007

    Controlled Records Archive and Retrieval Index

    PRJ-B-008 · Operational Turnover / Closeout · Registers and indexes · 2020-02-25 · PRJ-B-008-WBS-OT-03 · PRJ-B-008-BL-OT-B01

    Establish the controlled controlled records archive and retrieval index needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

  • PRJ-B-008-SE-OT-008

    Lessons Learned and Benefit Realization Baseline

    PRJ-B-008 · Operational Turnover / Closeout · Baselines and manifests · 2020-02-29 · PRJ-B-008-WBS-OT-04 · PRJ-B-008-BL-OT-B01

    Establish the controlled lessons learned and benefit realization baseline needed to execute Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Ammonia/glycol refrigeration system within PRJ-B-008 - Ammonia/Glycol Refrigeration Safety, Compliance, and MI Retrofit. The project scope is: P&ID recovery, charge calculation, IIAR 9 evaluation, machinery-room safety, relief validation, mechanical integrity, glycol review, controls, PM alignment, MOC/PSSR, testing, training, and turnover. Documented and accepted refrigeration system with corrected safeguards, verified relief protection, closed MI findings, reduced charge, and operating ownership.

All Portfolio Connections

All portfolio connections (10)

WHAT COMES NEXT

Complex Challenge?
Let’s Work Through It.

Engineering leadership, capital projects, and independent consulting.

Start a conversation ↗