PRJ-B-004 · Food ingredients manufacturer

Continuous Fermentation Natural Curing-Agent Process

Owned the full project lifecycle, connecting capital planning, engineering, procurement, construction and operating readiness.

Conceptual engineering visualization: Continuous Fermentation Natural Curing-Agent Process
Conceptual engineering visualization · AI generated

The Operating Context

Operating Context

Owned the full project lifecycle, connecting capital planning, engineering, procurement, construction and operating readiness.

Purpose & Engineering Scope

Purpose and Scope

Business Purpose

Continuous fermentation production system with process equipment, utilities, controls, construction, qualification, and turnover.

Technical Scope

Continuous-fermentation natural-curing production system covering feed preparation and pasteurization, inoculation, controlled feed and harvest, terminal inactivation, separation, evaporation and final product handling, with sanitary equipment, utilities, automation, construction, qualification and turnover.

The Work & Its Outcomes

Work and Outcomes

Engineering Approach

  • Source preparation, blending, pasteurization, inoculation, controlled feed and harvest.
  • Automation, separation, evaporation, final processing and sanitation.
  • Procurement, construction, commissioning, operator training and closeout.

Results, Targets & Design Context

  • Commissioned and qualified the continuous-fermentation production system and its operating procedures.
  • The project is a commercial system, with earlier pilot work retained as a separate development phase.

Project Delivery & Execution

Capital Planning and Full Lifecycle Ownership

Owned the full project lifecycle, from capital planning through engineering, procurement, construction, commissioning and operating readiness.
Full lifecycle ownership
  • Project Ownership

    Full lifecycle project ownership

    Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.

Connected Activities

Design and Multidisciplinary Coordination

Connected Activities

Construction Sequencing and Field Oversight

Connected Activities

AFE Development, Procurement and Bid Evaluation

Connected Activities

Project Controls and Governance

Quality, Commissioning and Operating Readiness

Connected Activities

Recorded delivery responsibilities and activities

Owned capital planning and the full delivery lifecycle. The cards connect the applicable responsibilities with the recorded work.

Delivery Activities

Analytical Methods & Quantitative Decision Support

Financial and Capital Investment Analysis

Statistical Quality and Process Analytics

Optimization and Operations Research

Supply Chain and Inventory Analysis

Uncertainty, Reliability and Queueing

Production-Rate Driver Analysis

Quality Engineering and Structured Improvement

Engineering Option Studies and Operating Models

KPI Ownership and Performance Interpretation

Analytical Capability and Practical Application

Related methods and applications

Technical Systems Ownership

Acetation, Fermentation and Process Support

Connected Activities

Conceptual engineering illustration: procurement logistics

TSK-000584 · Action

Led Specification, Procurement, Construction, Integration, Commissioning, Qualification and Turnover of the Continuous-Fermentation Production System, Automation, Sanitation Strategy and Operating Procedures

Continuous Fermentation Natural Curing-Agent Process

Recorded application
Additional technical detail
Explore 8 detail records
  • Competency and project record

    Continuous fermentation and natural-curing production system from feed preparation through inactivation, separation, final processing, controls, and qualification; Budget: $18,400,000. Qualified continuous fermentation production system; operationally transferred and closed.

  • Competency and project record

    Delivered continuous-fermentation scope included source preparation, blending, pasteurization, inoculation, controlled feed and harvest, automated fermentation, inactivation, separation, evaporation, final processing, sanitation, controls, qualification, and operations training. Records include Staphylococcus carnosus, 37 degrees C fermentation, and harvest controlled above feed rate; Continuous fermentation production system; Harvest rate controlled above feed rate; continuous conversion architecture; operational turnover completed

  • Competency and project record

    Delivered feed preparation, pasteurization, inoculation, feed/harvest control, fermentation, inactivation, clarification, evaporation, sanitation, controls, qualification, training and turnover; $18,400,000 project budget

  • Sanitary and aseptic: Project mapping

    PRJ-B-004 | Continuous Fermentation Natural Curing-Agent Process | classification ASEPTIC_OR_HYGIENIC_PRODUCT_PROCESSING

  • Sanitary and aseptic: Controlled case details

    Delivered feed preparation, pasteurization, inoculation, feed/harvest control, fermentation, inactivation, clarification, evaporation, sanitation, controls, qualification, training, and turnover.

  • Sanitary and aseptic: Controlled case details

    Project budget: $18,400,000.

  • Sanitary and aseptic: Controlled case details
  • R&D supplement

    RD-007; Food ingredients manufacturer; Continuous Fermentation Natural Curing-Agent Process; COMMERCIAL SCALE-UP / OPERATIONAL TURNOVER; Delivered feed preparation, pasteurization, inoculation, feed/harvest control, fermentation, inactivation, clarification, evaporation, sanitation, controls, qualification, training and turnover; $18,400,000 project budget

Project Activities

Conceptual engineering illustration: bottling integration

TSK-000582 · Action

Scope-to-Delivery Work-Package Coordination

Continuous Fermentation Natural Curing-Agent Process

Conceptual engineering illustration: procurement logistics

TSK-000584 · Action

Led Specification, Procurement, Construction, Integration, Commissioning, Qualification and Turnover of the Continuous-Fermentation Production System, Automation, Sanitation Strategy and Operating Procedures

Continuous Fermentation Natural Curing-Agent Process

Project Measures

Workstream Portfolio Rollup

66,885,000 USD

Vinegar Acetation and Fermentation-Support Modernization

Recorded workstream portfolio reference. This is the workstream-level value and is not a project expenditure or a new total of reassigned projects.

Measure or outcomeValue or resultMeaning and operating scope
Fermentation Temperature37 °CDesign Parameter
Process design condition

Applies to: Continuous Fermentation Natural Curing-Agent Process

Staphylococcus carnosus fermentation — Recorded fermentation temperature in the continuous natural-curing process.

Recorded outcomeCommissioned and qualified the continuous-fermentation production system and its operating procedures.Continuous Fermentation Natural Curing-Agent Process
Recorded outcomeThe project is a commercial system, with earlier pilot work retained as a separate development phase.Continuous Fermentation Natural Curing-Agent Process

Explore the Case Studies

Portfolio Artifact Index

Project lifecycle documents
Explore 76 document purposes and project phases
  • PRJ-B-004-SE-F1-001

    Business Case and Opportunity Statement

    FEL 1 / Concept · Business and decision documents · 2014-09-12 · PRJ-B-004-WBS-F1-01 · PRJ-B-004-BL-F1-B01

    Establish the controlled business case and opportunity statement needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F1-002

    Project Charter and Initial Scope / Battery Limits

    FEL 1 / Concept · Business and decision documents · 2014-09-24 · PRJ-B-004-WBS-F1-02 · PRJ-B-004-BL-F1-B01

    Establish the controlled project charter and initial scope / battery limits needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F1-003

    Stakeholder Needs and Operating Context

    FEL 1 / Concept · Reports · 2014-10-06 · PRJ-B-004-WBS-F1-03 · PRJ-B-004-BL-F1-B01

    Establish the controlled stakeholder needs and operating context needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F1-004

    Concept Alternatives and Screening Study

    FEL 1 / Concept · Studies and analyses · 2014-10-18 · PRJ-B-004-WBS-F1-04 · PRJ-B-004-BL-F1-B01

    Establish the controlled concept alternatives and screening study needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F1-005

    Preliminary Schedule and Class 5 Cost Estimate

    FEL 1 / Concept · Studies and analyses · 2014-10-30 · PRJ-B-004-WBS-F1-01 · PRJ-B-004-BL-F1-B01

    Establish the controlled preliminary schedule and class 5 cost estimate needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F1-006

    Initial Risk, Assumption, and Decision Register

    FEL 1 / Concept · Registers and indexes · 2014-11-11 · PRJ-B-004-WBS-F1-02 · PRJ-B-004-BL-F1-B01

    Establish the controlled initial risk, assumption, and decision register needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 1 / Concept. The record supports G1 Opportunity Authorization and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F2-001

    Option Study and Weighted Decision Analysis

    FEL 2 / Select · Studies and analyses · 2014-11-23 · PRJ-B-004-WBS-F2-01 · PRJ-B-004-BL-F2-B01

    Establish the controlled option study and weighted decision analysis needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F2-002

    Design Basis Memorandum

    FEL 2 / Select · Design definitions · 2014-12-06 · PRJ-B-004-WBS-F2-02 · PRJ-B-004-BL-F2-B01

    Establish the controlled design basis memorandum needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F2-003

    Site, Layout, and Process Alternative Study

    FEL 2 / Select · Studies and analyses · 2014-12-19 · PRJ-B-004-WBS-F2-03 · PRJ-B-004-BL-F2-B01

    Establish the controlled site, layout, and process alternative study needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F2-004

    Stakeholder and System Requirements Specification

    FEL 2 / Select · Specifications · 2015-01-01 · PRJ-B-004-WBS-F2-04 · PRJ-B-004-BL-F2-B01

    Establish the controlled stakeholder and system requirements specification needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F2-005

    Concept Architecture and Interface Definition

    FEL 2 / Select · Design definitions · 2015-01-14 · PRJ-B-004-WBS-F2-01 · PRJ-B-004-BL-F2-B01

    Establish the controlled concept architecture and interface definition needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F2-006

    HAZID / Constructability / Operability Study

    FEL 2 / Select · Studies and analyses · 2015-01-27 · PRJ-B-004-WBS-F2-02 · PRJ-B-004-BL-F2-B01

    Establish the controlled hazid / constructability / operability study needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F2-007

    Class 4 Estimate and Level 2 Schedule

    FEL 2 / Select · Studies and analyses · 2015-02-09 · PRJ-B-004-WBS-F2-03 · PRJ-B-004-BL-F2-B01

    Establish the controlled class 4 estimate and level 2 schedule needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F2-008

    Selected Concept and G2 Decision Dossier

    FEL 2 / Select · Dossiers and manual sets · 2015-02-22 · PRJ-B-004-WBS-F2-04 · PRJ-B-004-BL-F2-B01

    Establish the controlled selected concept and g2 decision dossier needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 2 / Select. The record supports G2 Concept Selection and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F3-001

    Defined Scope and Design Deliverables Register

    FEL 3 / Define · Registers and indexes · 2015-03-07 · PRJ-B-004-WBS-F3-01 · PRJ-B-004-BL-F3-B01

    Establish the controlled defined scope and design deliverables register needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F3-002

    Baselined System Requirements Specification

    FEL 3 / Define · Specifications · 2015-03-20 · PRJ-B-004-WBS-F3-02 · PRJ-B-004-BL-F3-B01

    Establish the controlled baselined system requirements specification needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F3-003

    System Architecture and Interface Control Document

    FEL 3 / Define · Design definitions · 2015-04-03 · PRJ-B-004-WBS-F3-03 · PRJ-B-004-BL-F3-B01

    Establish the controlled system architecture and interface control document needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F3-004

    Project Execution Plan

    FEL 3 / Define · Plans · 2015-04-16 · PRJ-B-004-WBS-F3-04 · PRJ-B-004-BL-F3-B01

    Establish the controlled project execution plan needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F3-005

    WBS, Work Package, and Responsibility Baseline

    FEL 3 / Define · Baselines and manifests · 2015-04-30 · PRJ-B-004-WBS-F3-01 · PRJ-B-004-BL-F3-B01

    Establish the controlled wbs, work package, and responsibility baseline needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F3-006

    Class 3 Estimate and Cost Baseline

    FEL 3 / Define · Baselines and manifests · 2015-05-13 · PRJ-B-004-WBS-F3-02 · PRJ-B-004-BL-F3-B01

    Establish the controlled class 3 estimate and cost baseline needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F3-007

    Coordinated Control Schedule and Resource Plan

    FEL 3 / Define · Plans · 2015-05-26 · PRJ-B-004-WBS-F3-03 · PRJ-B-004-BL-F3-B01

    Establish the controlled coordinated control schedule and resource plan needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F3-008

    Procurement and Contracting Plan

    FEL 3 / Define · Plans · 2015-06-09 · PRJ-B-004-WBS-F3-04 · PRJ-B-004-BL-F3-B01

    Establish the controlled procurement and contracting plan needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F3-009

    V&V, Acceptance, Commissioning, and Turnover Strategy

    FEL 3 / Define · Plans · 2015-06-22 · PRJ-B-004-WBS-F3-01 · PRJ-B-004-BL-F3-B01

    Establish the controlled v&v, acceptance, commissioning, and turnover strategy needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-F3-010

    FID / G3 Approval and Baseline Manifest

    FEL 3 / Define · Certificates and approvals · 2015-07-06 · PRJ-B-004-WBS-F3-02 · PRJ-B-004-BL-F3-B01

    Establish the controlled fid / g3 approval and baseline manifest needed to execute Continuous Fermentation Natural Curing-Agent Process during FEL 3 / Define. The record supports G3 Final Investment Decision and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-DD-001

    Detailed Design Management Plan

    Detailed Design · Plans · 2015-07-19 · PRJ-B-004-WBS-DD-01 · PRJ-B-004-BL-DD-B01

    Establish the controlled detailed design management plan needed to execute Continuous Fermentation Natural Curing-Agent Process during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-DD-002

    Process / Functional Design Package

    Detailed Design · Design definitions · 2015-08-01 · PRJ-B-004-WBS-DD-02 · PRJ-B-004-BL-DD-B01

    Establish the controlled process / functional design package needed to execute Continuous Fermentation Natural Curing-Agent Process during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-DD-003

    Mechanical and Piping Design Package

    Detailed Design · Design definitions · 2015-08-15 · PRJ-B-004-WBS-DD-03 · PRJ-B-004-BL-DD-B01

    Establish the controlled mechanical and piping design package needed to execute Continuous Fermentation Natural Curing-Agent Process during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-DD-004

    Electrical Power and Controls Design Package

    Detailed Design · Design definitions · 2015-08-28 · PRJ-B-004-WBS-DD-04 · PRJ-B-004-BL-DD-B01

    Establish the controlled electrical power and controls design package needed to execute Continuous Fermentation Natural Curing-Agent Process during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-DD-005

    Civil, Structural, and Architectural Design Package

    Detailed Design · Design definitions · 2015-09-11 · PRJ-B-004-WBS-DD-01 · PRJ-B-004-BL-DD-B01

    Establish the controlled civil, structural, and architectural design package needed to execute Continuous Fermentation Natural Curing-Agent Process during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-DD-006

    Instrumentation, Automation, and Data Design Package

    Detailed Design · Design definitions · 2015-09-24 · PRJ-B-004-WBS-DD-02 · PRJ-B-004-BL-DD-B01

    Establish the controlled instrumentation, automation, and data design package needed to execute Continuous Fermentation Natural Curing-Agent Process during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-DD-007

    Safety, Reliability, and Maintainability Analysis

    Detailed Design · Studies and analyses · 2015-10-07 · PRJ-B-004-WBS-DD-03 · PRJ-B-004-BL-DD-B01

    Establish the controlled safety, reliability, and maintainability analysis needed to execute Continuous Fermentation Natural Curing-Agent Process during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-DD-008

    Design Review and Comment Resolution Record

    Detailed Design · Records and logs · 2015-10-21 · PRJ-B-004-WBS-DD-04 · PRJ-B-004-BL-DD-B01

    Establish the controlled design review and comment resolution record needed to execute Continuous Fermentation Natural Curing-Agent Process during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-DD-009

    Issued-for-Construction Design Baseline

    Detailed Design · Baselines and manifests · 2015-11-03 · PRJ-B-004-WBS-DD-01 · PRJ-B-004-BL-DD-B01

    Establish the controlled issued-for-construction design baseline needed to execute Continuous Fermentation Natural Curing-Agent Process during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-DD-010

    Design V&V Evidence Index

    Detailed Design · Registers and indexes · 2015-11-17 · PRJ-B-004-WBS-DD-02 · PRJ-B-004-BL-DD-B01

    Establish the controlled design v&v evidence index needed to execute Continuous Fermentation Natural Curing-Agent Process during Detailed Design. The record supports G4 Design Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-PR-001

    Procurement Package and Bid List

    Procurement · Registers and indexes · 2015-11-30 · PRJ-B-004-WBS-PR-01 · PRJ-B-004-BL-PR-B01

    Establish the controlled procurement package and bid list needed to execute Continuous Fermentation Natural Curing-Agent Process during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-PR-002

    Technical Requisition and Datasheet Set

    Procurement · Specifications · 2015-12-14 · PRJ-B-004-WBS-PR-02 · PRJ-B-004-BL-PR-B01

    Establish the controlled technical requisition and datasheet set needed to execute Continuous Fermentation Natural Curing-Agent Process during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-PR-003

    Commercial Bid Evaluation and Award Recommendation

    Procurement · Studies and analyses · 2015-12-28 · PRJ-B-004-WBS-PR-03 · PRJ-B-004-BL-PR-B01

    Establish the controlled commercial bid evaluation and award recommendation needed to execute Continuous Fermentation Natural Curing-Agent Process during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-PR-004

    Technical Bid Evaluation and Clarification Log

    Procurement · Registers and indexes · 2016-01-11 · PRJ-B-004-WBS-PR-04 · PRJ-B-004-BL-PR-B01

    Establish the controlled technical bid evaluation and clarification log needed to execute Continuous Fermentation Natural Curing-Agent Process during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-PR-005

    Purchase Order / Contract and Scope of Supply

    Procurement · Business and decision documents · 2016-01-24 · PRJ-B-004-WBS-PR-01 · PRJ-B-004-BL-PR-B01

    Establish the controlled purchase order / contract and scope of supply needed to execute Continuous Fermentation Natural Curing-Agent Process during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-PR-006

    Supplier Quality and Inspection Plan

    Procurement · Plans · 2016-02-07 · PRJ-B-004-WBS-PR-02 · PRJ-B-004-BL-PR-B01

    Establish the controlled supplier quality and inspection plan needed to execute Continuous Fermentation Natural Curing-Agent Process during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-PR-007

    Vendor Data, Submittal, and RFI Register

    Procurement · Registers and indexes · 2016-02-21 · PRJ-B-004-WBS-PR-03 · PRJ-B-004-BL-PR-B01

    Establish the controlled vendor data, submittal, and rfi register needed to execute Continuous Fermentation Natural Curing-Agent Process during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-PR-008

    Expediting and Logistics Plan

    Procurement · Plans · 2016-03-06 · PRJ-B-004-WBS-PR-04 · PRJ-B-004-BL-PR-B01

    Establish the controlled expediting and logistics plan needed to execute Continuous Fermentation Natural Curing-Agent Process during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-PR-009

    Factory Acceptance Test Procedure and Report

    Procurement · Procedures · 2016-03-20 · PRJ-B-004-WBS-PR-01 · PRJ-B-004-BL-PR-B01

    Establish the controlled factory acceptance test procedure and report needed to execute Continuous Fermentation Natural Curing-Agent Process during Procurement. The record supports G5 Procurement Release and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-FC-001

    Construction / Fabrication Execution Plan

    Fabrication / Construction · Plans · 2016-04-09 · PRJ-B-004-WBS-FC-01 · PRJ-B-004-BL-FC-B01

    Establish the controlled construction / fabrication execution plan needed to execute Continuous Fermentation Natural Curing-Agent Process during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-FC-002

    Site Logistics, Safety, and Permit Plan

    Fabrication / Construction · Plans · 2016-04-30 · PRJ-B-004-WBS-FC-02 · PRJ-B-004-BL-FC-B01

    Establish the controlled site logistics, safety, and permit plan needed to execute Continuous Fermentation Natural Curing-Agent Process during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-FC-003

    Fabrication Drawing and Shop Package

    Fabrication / Construction · Design definitions · 2016-05-21 · PRJ-B-004-WBS-FC-03 · PRJ-B-004-BL-FC-B01

    Establish the controlled fabrication drawing and shop package needed to execute Continuous Fermentation Natural Curing-Agent Process during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-FC-004

    Field Work Package and Installation Method

    Fabrication / Construction · Procedures · 2016-06-10 · PRJ-B-004-WBS-FC-04 · PRJ-B-004-BL-FC-B01

    Establish the controlled field work package and installation method needed to execute Continuous Fermentation Natural Curing-Agent Process during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-FC-005

    Inspection and Test Plan / Quality Records

    Fabrication / Construction · Plans · 2016-07-01 · PRJ-B-004-WBS-FC-01 · PRJ-B-004-BL-FC-B01

    Establish the controlled inspection and test plan / quality records needed to execute Continuous Fermentation Natural Curing-Agent Process during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-FC-006

    Daily Progress and Quantity Report

    Fabrication / Construction · Records and logs · 2016-07-22 · PRJ-B-004-WBS-FC-02 · PRJ-B-004-BL-FC-B01

    Establish the controlled daily progress and quantity report needed to execute Continuous Fermentation Natural Curing-Agent Process during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-FC-007

    Nonconformity and Corrective Action Record

    Fabrication / Construction · Records and logs · 2016-08-11 · PRJ-B-004-WBS-FC-03 · PRJ-B-004-BL-FC-B01

    Establish the controlled nonconformity and corrective action record needed to execute Continuous Fermentation Natural Curing-Agent Process during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-FC-008

    Redline Drawing and Field Change Register

    Fabrication / Construction · Registers and indexes · 2016-09-01 · PRJ-B-004-WBS-FC-04 · PRJ-B-004-BL-FC-B01

    Establish the controlled redline drawing and field change register needed to execute Continuous Fermentation Natural Curing-Agent Process during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-FC-009

    Mechanical Completion Certificate and Punch List

    Fabrication / Construction · Certificates and approvals · 2016-09-22 · PRJ-B-004-WBS-FC-01 · PRJ-B-004-BL-FC-B01

    Establish the controlled mechanical completion certificate and punch list needed to execute Continuous Fermentation Natural Curing-Agent Process during Fabrication / Construction. The record supports G6 Mechanical Completion and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-IN-001

    System Coordination and Interface Plan

    Installation and Interface Coordination · Plans · 2016-10-05 · PRJ-B-004-WBS-IN-01 · PRJ-B-004-BL-IN-B01

    Establish the controlled system coordination and interface plan needed to execute Continuous Fermentation Natural Curing-Agent Process during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-IN-002

    Installation Completion and Walkdown Record

    Installation and Interface Coordination · Records and logs · 2016-10-18 · PRJ-B-004-WBS-IN-02 · PRJ-B-004-BL-IN-B01

    Establish the controlled installation completion and walkdown record needed to execute Continuous Fermentation Natural Curing-Agent Process during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-IN-003

    Controls / Software Configuration Baseline

    Installation and Interface Coordination · Baselines and manifests · 2016-10-31 · PRJ-B-004-WBS-IN-03 · PRJ-B-004-BL-IN-B01

    Establish the controlled controls / software configuration baseline needed to execute Continuous Fermentation Natural Curing-Agent Process during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-IN-004

    Loop Check, Continuity, and Calibration Records

    Installation and Interface Coordination · Records and logs · 2016-11-14 · PRJ-B-004-WBS-IN-04 · PRJ-B-004-BL-IN-B01

    Establish the controlled loop check, continuity, and calibration records needed to execute Continuous Fermentation Natural Curing-Agent Process during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-IN-005

    Cleaning, Flushing, and Pre-Operational Test Record

    Installation and Interface Coordination · Procedures · 2016-11-27 · PRJ-B-004-WBS-IN-01 · PRJ-B-004-BL-IN-B01

    Establish the controlled cleaning, flushing, and pre-operational test record needed to execute Continuous Fermentation Natural Curing-Agent Process during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-IN-006

    System Completion Dossier

    Installation and Interface Coordination · Dossiers and manual sets · 2016-12-10 · PRJ-B-004-WBS-IN-02 · PRJ-B-004-BL-IN-B01

    Establish the controlled system completion dossier needed to execute Continuous Fermentation Natural Curing-Agent Process during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-IN-007

    Ready-for-Commissioning Certificate

    Installation and Interface Coordination · Certificates and approvals · 2016-12-24 · PRJ-B-004-WBS-IN-03 · PRJ-B-004-BL-IN-B01

    Establish the controlled ready-for-commissioning certificate needed to execute Continuous Fermentation Natural Curing-Agent Process during Installation / coordination. The record supports G7 Ready for Commissioning and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-CS-001

    Commissioning and Startup Plan

    Commissioning / Startup · Plans · 2017-01-05 · PRJ-B-004-WBS-CS-01 · PRJ-B-004-BL-CS-B01

    Establish the controlled commissioning and startup plan needed to execute Continuous Fermentation Natural Curing-Agent Process during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-CS-002

    Pre-Startup Safety / Operational Readiness Review

    Commissioning / Startup · Reports · 2017-01-18 · PRJ-B-004-WBS-CS-02 · PRJ-B-004-BL-CS-B01

    Establish the controlled pre-startup safety / operational readiness review needed to execute Continuous Fermentation Natural Curing-Agent Process during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-CS-003

    Commissioning Procedure and Results

    Commissioning / Startup · Procedures · 2017-01-31 · PRJ-B-004-WBS-CS-03 · PRJ-B-004-BL-CS-B01

    Establish the controlled commissioning procedure and results needed to execute Continuous Fermentation Natural Curing-Agent Process during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-CS-004

    Startup and Ramp-Up Log

    Commissioning / Startup · Registers and indexes · 2017-02-12 · PRJ-B-004-WBS-CS-04 · PRJ-B-004-BL-CS-B01

    Establish the controlled startup and ramp-up log needed to execute Continuous Fermentation Natural Curing-Agent Process during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-CS-005

    Performance Guarantee and Capacity Test Report

    Commissioning / Startup · Studies and analyses · 2017-02-25 · PRJ-B-004-WBS-CS-01 · PRJ-B-004-BL-CS-B01

    Establish the controlled performance guarantee and capacity test report needed to execute Continuous Fermentation Natural Curing-Agent Process during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-CS-006

    Reliability Demonstration Run Report

    Commissioning / Startup · Studies and analyses · 2017-03-10 · PRJ-B-004-WBS-CS-02 · PRJ-B-004-BL-CS-B01

    Establish the controlled reliability demonstration run report needed to execute Continuous Fermentation Natural Curing-Agent Process during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-CS-007

    Operator and Maintainer Training Record

    Commissioning / Startup · Records and logs · 2017-03-22 · PRJ-B-004-WBS-CS-03 · PRJ-B-004-BL-CS-B01

    Establish the controlled operator and maintainer training record needed to execute Continuous Fermentation Natural Curing-Agent Process during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-CS-008

    Commissioning Anomaly and Punch Closure Register

    Commissioning / Startup · Registers and indexes · 2017-04-04 · PRJ-B-004-WBS-CS-04 · PRJ-B-004-BL-CS-B01

    Establish the controlled commissioning anomaly and punch closure register needed to execute Continuous Fermentation Natural Curing-Agent Process during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-CS-009

    Performance Acceptance Certificate

    Commissioning / Startup · Certificates and approvals · 2017-04-17 · PRJ-B-004-WBS-CS-01 · PRJ-B-004-BL-CS-B01

    Establish the controlled performance acceptance certificate needed to execute Continuous Fermentation Natural Curing-Agent Process during Commissioning / Startup. The record supports G8 Performance Acceptance and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-OT-001

    As-Built / as-Configured Baseline Manifest

    Operational Turnover / Closeout · Baselines and manifests · 2017-04-26 · PRJ-B-004-WBS-OT-01 · PRJ-B-004-BL-OT-B01

    Establish the controlled as-built / as-configured baseline manifest needed to execute Continuous Fermentation Natural Curing-Agent Process during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-OT-002

    Operations and Maintenance Manual Set

    Operational Turnover / Closeout · Dossiers and manual sets · 2017-05-05 · PRJ-B-004-WBS-OT-02 · PRJ-B-004-BL-OT-B01

    Establish the controlled operations and maintenance manual set needed to execute Continuous Fermentation Natural Curing-Agent Process during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-OT-003

    Asset, Spare Parts, and Warranty Register

    Operational Turnover / Closeout · Registers and indexes · 2017-05-14 · PRJ-B-004-WBS-OT-03 · PRJ-B-004-BL-OT-B01

    Establish the controlled asset, spare parts, and warranty register needed to execute Continuous Fermentation Natural Curing-Agent Process during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-OT-004

    Final Technical and Commercial Acceptance Certificate

    Operational Turnover / Closeout · Certificates and approvals · 2017-05-24 · PRJ-B-004-WBS-OT-04 · PRJ-B-004-BL-OT-B01

    Establish the controlled final technical and commercial acceptance certificate needed to execute Continuous Fermentation Natural Curing-Agent Process during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-OT-005

    Operational Turnover Dossier and Ownership Transfer

    Operational Turnover / Closeout · Dossiers and manual sets · 2017-06-02 · PRJ-B-004-WBS-OT-01 · PRJ-B-004-BL-OT-B01

    Establish the controlled operational turnover dossier and ownership transfer needed to execute Continuous Fermentation Natural Curing-Agent Process during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-OT-006

    Final Cost, Schedule, Contract, and Claims Closeout

    Operational Turnover / Closeout · Studies and analyses · 2017-06-11 · PRJ-B-004-WBS-OT-02 · PRJ-B-004-BL-OT-B01

    Establish the controlled final cost, schedule, contract, and claims closeout needed to execute Continuous Fermentation Natural Curing-Agent Process during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-OT-007

    Controlled Records Archive and Retrieval Index

    Operational Turnover / Closeout · Registers and indexes · 2017-06-20 · PRJ-B-004-WBS-OT-03 · PRJ-B-004-BL-OT-B01

    Establish the controlled controlled records archive and retrieval index needed to execute Continuous Fermentation Natural Curing-Agent Process during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

  • PRJ-B-004-SE-OT-008

    Lessons Learned and Benefit Realization Baseline

    Operational Turnover / Closeout · Baselines and manifests · 2017-06-30 · PRJ-B-004-WBS-OT-04 · PRJ-B-004-BL-OT-B01

    Establish the controlled lessons learned and benefit realization baseline needed to execute Continuous Fermentation Natural Curing-Agent Process during Operational Turnover / Closeout. The record supports G9 Operational Turnover and Closeout and preserves the approved decision, execution, verification, acceptance, and configuration evidence used by successor work. This document applies to Continuous fermentation production system within PRJ-B-004 - Continuous Fermentation Natural Curing-Agent Process. The project scope is: Feed preparation, blending, pasteurization, inoculation, continuous fermentation, harvest control, inactivation, separation, evaporation, final processing, sanitation, automation, and qualification. Qualified continuous fermentation system with validated conversion performance, automated control, sanitation strategy, and trained operations team.

Related analysis and application artifacts
Show 3 more connections
All portfolio connections
All portfolio connections (79)
Connected collections

Workstream & Initiative

WHAT COMES NEXT

Complex Challenge?
Let’s Work Through It.

Engineering leadership, capital projects, and independent consulting.

Start a conversation ↗