PRJ-A-013 · Food and beverage manufacturer

Centrifuge Filtration Recovery and Equipment-Relocation Evaluation

Owned the full lifecycle of this project, connecting capital planning, engineering, delivery and operating readiness. Longer filtration cycles after process changes constrained the production day. Restoring throughput required attention to feed conditions, separation equipment, filter-aid demand and scheduling together.

Conceptual engineering visualization: Installed vertical centrifuge separator: Centrifuge filtration recovery and equipment-relocation evaluation
Conceptual engineering visualization · AI generated

The Operating Context

Operating Context

Longer filtration cycles after process changes constrained the production day. Restoring throughput required attention to feed conditions, separation equipment, filter-aid demand and scheduling together.

Investigated the change in daily filtration duration, evaluated centrifuge use and equipment relocation, and aligned the scope with operating constraints. Comparing approximately ten-hour filtration days with the four-hour performance objective made the capacity problem concrete and supported an informed equipment decision.

Purpose & Engineering Scope

Purpose and Scope

Business Purpose

Restore filtration throughput targets by reducing daily filtration from post-change durations of ten hours toward pre-change performance of roughly four hours per day.

Technical Scope

Centrifuge Filtration and Filter-Aid Cost Control

The Work & Its Outcomes

Work and Outcomes

Engineering Approach

  • Investigated filtration duration after process changes.
  • Aligned centrifuge use, filter-aid costs and production scheduling.
  • Coordinated equipment-relocation and operating constraints.

Results, Targets & Design Context

  • Reduced filtration time from about ten to seven hours per day's production in the wine-centrifugation trial; evaluated downstream vinegar centrifugation to restore the former four-hour rate.
  • The earlier filtration baseline was about four hours per day's production. The bentonite-treatment alternative required 49 elapsed process hours per day's production; that duration did not represent manned labor hours.

Project Delivery & Execution

Capital Planning and Full Lifecycle Ownership

Owned the full project lifecycle, from capital planning through engineering, procurement, construction, commissioning and operating readiness.
Full lifecycle ownership
  • Project Ownership

    Full lifecycle project ownership

    Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.

  • Project Stakeholder

    AFE Project Lead

    Named Project Responsibility

    Named project lead for the Centrifuge Filtration System AFE.

Connected Activities

Construction Sequencing and Field Oversight

AFE Development, Procurement and Bid Evaluation

Delivery Improvement and Quantitative Controls

Connected Activities

Conceptual engineering illustration: ceramic filtration

Baseline · Historical process context

Bentonite-Treated Production Share · 75 % ↗

Applies to: Separated filtration processing time from unattended bentonite-treatment elapsed time when evaluating post-formulation-change capacity and filter-aid demand

Post-formulation-change treatment — Bentonite-treated production share — Post-formulation-change treatment

Recorded delivery responsibilities and activities

Analytical Methods & Quantitative Decision Support

Financial and Capital Investment Analysis

Statistical Quality and Process Analytics

Supply Chain and Inventory Analysis

Connected Activities

Uncertainty, Reliability and Queueing

Experimental Design and Model Validation

Production-Rate Driver Analysis

Connected Activities

Conceptual engineering illustration: ceramic filtration

Baseline · Historical process context

Bentonite-Treated Production Share · 75 % ↗

Applies to: Separated filtration processing time from unattended bentonite-treatment elapsed time when evaluating post-formulation-change capacity and filter-aid demand

Post-formulation-change treatment — Bentonite-treated production share — Post-formulation-change treatment

Engineering Option Studies and Operating Models

Connected Activities

Conceptual engineering illustration: ceramic filtration

Baseline · Historical process context

Bentonite-Treated Production Share · 75 % ↗

Applies to: Separated filtration processing time from unattended bentonite-treatment elapsed time when evaluating post-formulation-change capacity and filter-aid demand

Post-formulation-change treatment — Bentonite-treated production share — Post-formulation-change treatment

KPI Ownership and Performance Interpretation

Connected Activities

Conceptual engineering illustration: ceramic filtration

Baseline · Historical process context

Bentonite-Treated Production Share · 75 % ↗

Applies to: Separated filtration processing time from unattended bentonite-treatment elapsed time when evaluating post-formulation-change capacity and filter-aid demand

Post-formulation-change treatment — Bentonite-treated production share — Post-formulation-change treatment

Analytical Capability and Practical Application

Connected Activities

Conceptual engineering illustration: ceramic filtration

Baseline · Historical process context

Bentonite-Treated Production Share · 75 % ↗

Applies to: Separated filtration processing time from unattended bentonite-treatment elapsed time when evaluating post-formulation-change capacity and filter-aid demand

Post-formulation-change treatment — Bentonite-treated production share — Post-formulation-change treatment

Related methods and applications

Technical Systems Ownership

Process Filtration and Clarification

Connected Activities

Conceptual engineering illustration: ceramic filtration

Baseline · Historical process context

Bentonite-Treated Production Share · 75 % ↗

Applies to: Separated filtration processing time from unattended bentonite-treatment elapsed time when evaluating post-formulation-change capacity and filter-aid demand

Post-formulation-change treatment — Bentonite-treated production share — Post-formulation-change treatment

Technical scope and recorded applications

Process Filtration and Clarification

Separation work connected centrifuges, ceramic filtration, ion-exchange testing, sanitary flow paths and CIP. Evaluated capacity, product quality, cleaning, consumables and recovery, then coordinated utilities, controls, supplier interfaces and operator requirements. The system perspective linked separation performance with downstream production and wastewater effects.

Applied Activities

Additional technical detail
Explore 4 detail records
  • Sanitary and aseptic: Project mapping

    PRJ-A-013 | Centrifuge Filtration System | classification ASEPTIC_OR_HYGIENIC_PRODUCT_PROCESSING

  • Benefit validation plan

    Compare filtration cycle times, normalized output and filter-aid spend, while checking shutdown and installation readiness. Keep the former four-hour objective separate from the approximately seven-hour wine-centrifugation trial result.

  • Primary project risk

    Delivery / Execution.

  • Project governance scope

    Capital authorization, supplier and stakeholder coordination, QA/QC, commissioning planning and technical turnover documentation.

Project Activities

Conceptual engineering illustration: ceramic filtration

TSK-001029 · Process comparison

Separated Filtration Processing Time from Unattended Bentonite-Treatment Elapsed Time When Evaluating Post-Formulation-Change Capacity and Filter-Aid Demand

Centrifuge Filtration Recovery and Equipment-Relocation Evaluation

Conceptual engineering illustration: procurement logistics

TSK-001030 · Acceptance criteria

Defined Filtration Quality, Capacity and Filter-Aid Cost Criteria for the Centrifuge Option and Its Post-Purchase-Order Completion Plan

Centrifuge Filtration Recovery and Equipment-Relocation Evaluation

Conceptual engineering illustration: procurement logistics

TSK-001034 · Execution planning

Planned Critical Spares and Supplier Follow-Up for an Unbacked Filtration System and Inventory Coverage During Relocation of a Leased Unit

Centrifuge Filtration Recovery and Equipment-Relocation Evaluation

Project Measures

Workstream Portfolio Rollup

18,317,000 USD

Wine Clarification and Vinegar Polishing Modernization

Recorded workstream portfolio reference. This is the workstream-level value and is not a project expenditure or a new total of reassigned projects.

Measure or outcomeValue or resultMeaning and operating scope
Oil-Change Procedure Duration10 minObservation
Vendor training record

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier startup, 2024-10-22 — Centrifuge supplier reported demonstrating the ten-minute oil-change process during operator training at the startup.

Flow30 GPMObservation
Vendor trial observation

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier trial, 22–23 October 2024 — Initial Apple Wine startup — Vendor-reported initial apple wine startup: flow.

Outlet Backpressure150 psiObservation
Vendor trial observation

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier trial, 22–23 October 2024 — Initial Apple Wine startup — Vendor-reported initial apple wine startup: outlet backpressure.

Outlet Backpressure100 psiObservation
Vendor trial observation

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier trial, 22–23 October 2024 — After inline-to-lab scaling — Vendor-reported after inline-to-lab scaling: outlet backpressure.

Outlet Turbidity17 NTUObservation
Vendor trial observation

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier trial, 22–23 October 2024 — After inline-to-lab scaling — Vendor-reported after inline-to-lab scaling: outlet turbidity.

Flow40 GPMObservation
Vendor trial observation

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier trial, 22–23 October 2024 — Raised flow — Vendor-reported raised flow: flow.

Outlet Turbidity20 NTUObservation
Vendor trial observation

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier trial, 22–23 October 2024 — Raised flow — Vendor-reported raised flow: outlet turbidity.

Outlet Backpressure75 psiObservation
Vendor trial observation

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier trial, 22–23 October 2024 — Reduced outlet backpressure — Vendor-reported reduced outlet backpressure: outlet backpressure.

Flow50 GPMObservation
Vendor trial observation

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier trial, 22–23 October 2024 — Following-day repeated run — Vendor-reported following-day repeated run: flow.

Outlet Turbidity23 NTUObservation
Vendor trial observation

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier trial, 22–23 October 2024 — Following-day repeated run — Vendor-reported following-day repeated run: outlet turbidity.

Stable Production Durationapproximately 5 hObservation
Vendor trial observation

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier trial, 22–23 October 2024 — Vendor reported approximately five hours without production issues at the stated settings after the air adjustment.

Additional Air-Pressure Adjustment5 psiObservation
Vendor trial observation

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier trial, 22–23 October 2024 — Vendor increased supply air another 5 psi after a low-pressure alarm.

Solids Discharge Interval4 to 5 minObservation
Vendor trial observation

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier trial, 22–23 October 2024 — Vendor-reported discharge interval at 50 GPM; solids packing and post-rinse needs varied with flow.

Solids Discharge Interval12 to 13 minObservation
Vendor trial observation

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier trial, 22–23 October 2024 — Vendor-reported discharge interval at 40 GPM; solids packing and post-rinse needs varied with flow.

Automatic Recipe Flow50 GPMOperating Control
Configured trial recipe

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier trial, 22–23 October 2024 — Vendor-developed automatic recipe; 10 GPM was a slow overnight option with occasional checks recommended.

Automatic Recipe Flow40 GPMOperating Control
Configured trial recipe

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier trial, 22–23 October 2024 — Vendor-developed automatic recipe; 10 GPM was a slow overnight option with occasional checks recommended.

Automatic Recipe Flow10 GPMOperating Control
Configured trial recipe

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier trial, 22–23 October 2024 — Vendor-developed automatic recipe; 10 GPM was a slow overnight option with occasional checks recommended.

Operator-Reported Flow40 GPMObservation
Operator trial observation

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier operator report, 25 October 2024 — Operator report of the stated run; no reported issues during this 5,500 gallon observation.

Operator-Reported Outlet Turbidity21 NTUObservation
Operator trial observation

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier operator report, 25 October 2024 — Operator report of the stated run; no reported issues during this 5,500 gallon observation.

Operator-Reported Processed Volume5,500 galObservation
Operator trial observation

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier operator report, 25 October 2024 — Operator report of the stated run; no reported issues during this 5,500 gallon observation.

Filtration operating savingsEstimated $260,000/yearCentrifuging wine and vinegar streams in the Missouri Manufacturing Facility scope.
Recorded outcomeReduced filtration time from about ten to seven hours per day's production in the wine-centrifugation trial; evaluated downstream vinegar centrifugation to restore the former four-hour rate.Centrifuge Filtration Recovery and Equipment-Relocation Evaluation
Recorded outcomeThe earlier filtration baseline was about four hours per day's production. The bentonite-treatment alternative required 49 elapsed process hours per day's production; that duration did not represent manned labor hours.Centrifuge Filtration Recovery and Equipment-Relocation Evaluation

Explore the Case Studies

Portfolio Artifact Index

Related analysis and application artifacts
All portfolio connections
All portfolio connections (38)
Connected collections

Workstream & Initiative

WHAT COMES NEXT

Complex Challenge?
Let’s Work Through It.

Engineering leadership, capital projects, and independent consulting.