CASE-042 · Engineering case

Centrifuge Filtration Recovery and Equipment-Relocation Evaluation

Used centrifuge operating and test evidence to restore filtration performance for wine and cider-vinegar production.

Conceptual engineering visualization: Installed vertical centrifuge separator: Centrifuge filtration recovery and equipment-relocation evaluation
Conceptual engineering visualization · AI generated

Why the Work Mattered

Purpose and Operating Need

Restore filtration throughput targets by reducing daily filtration from post-change durations of ten hours toward pre-change performance of roughly four hours per day.

Engineering Approach

Engineering Approach

Engineering scope: Centrifuge filtration for wine and cider vinegar, DE and fiber filter aid cost control, production scheduling for equipment relocation.

Outcome & Engineering Context

Outcome and Context

Reduced filtration time from about ten to seven hours per day's production in the wine-centrifugation trial; evaluated downstream vinegar centrifugation to restore the former four-hour rate.

Workstream Results & Impact

Workstream Portfolio Rollup

18,317,000 USD

Wine Clarification and Vinegar Polishing Modernization

Recorded workstream portfolio reference. This is the workstream-level value and is not a project expenditure or a new total of reassigned projects.

Measures & Operating Detail

MeasureValueType & meaningAttribution & operating context
Oil-Change Procedure Duration10 minObservation
Vendor training record

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier startup, 2024-10-22 — Centrifuge supplier reported demonstrating the ten-minute oil-change process during operator training at the startup.

Flow30 GPMObservation
Vendor trial observation

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier trial, 22–23 October 2024 — Initial Apple Wine startup — Vendor-reported initial apple wine startup: flow.

Outlet Backpressure150 psiObservation
Vendor trial observation

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier trial, 22–23 October 2024 — Initial Apple Wine startup — Vendor-reported initial apple wine startup: outlet backpressure.

Flow30 GPMObservation
Vendor trial observation

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier trial, 22–23 October 2024 — After inline-to-lab scaling — Vendor-reported after inline-to-lab scaling: flow.

Outlet Backpressure100 psiObservation
Vendor trial observation

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier trial, 22–23 October 2024 — After inline-to-lab scaling — Vendor-reported after inline-to-lab scaling: outlet backpressure.

Outlet Turbidity17 NTUObservation
Vendor trial observation

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier trial, 22–23 October 2024 — After inline-to-lab scaling — Vendor-reported after inline-to-lab scaling: outlet turbidity.

Flow40 GPMObservation
Vendor trial observation

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier trial, 22–23 October 2024 — Raised flow — Vendor-reported raised flow: flow.

Outlet Backpressure100 psiObservation
Vendor trial observation

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier trial, 22–23 October 2024 — Raised flow — Vendor-reported raised flow: outlet backpressure.

Outlet Turbidity20 NTUObservation
Vendor trial observation

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier trial, 22–23 October 2024 — Raised flow — Vendor-reported raised flow: outlet turbidity.

Flow40 GPMObservation
Vendor trial observation

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier trial, 22–23 October 2024 — Reduced outlet backpressure — Vendor-reported reduced outlet backpressure: flow.

Outlet Backpressure75 psiObservation
Vendor trial observation

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier trial, 22–23 October 2024 — Reduced outlet backpressure — Vendor-reported reduced outlet backpressure: outlet backpressure.

Outlet Turbidity20 NTUObservation
Vendor trial observation

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier trial, 22–23 October 2024 — Reduced outlet backpressure — Vendor-reported reduced outlet backpressure: outlet turbidity.

Flow50 GPMObservation
Vendor trial observation

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier trial, 22–23 October 2024 — Following-day repeated run — Vendor-reported following-day repeated run: flow.

Outlet Backpressure100 psiObservation
Vendor trial observation

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier trial, 22–23 October 2024 — Following-day repeated run — Vendor-reported following-day repeated run: outlet backpressure.

Outlet Turbidity23 NTUObservation
Vendor trial observation

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier trial, 22–23 October 2024 — Following-day repeated run — Vendor-reported following-day repeated run: outlet turbidity.

Stable Production Durationapproximately 5 hObservation
Vendor trial observation

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier trial, 22–23 October 2024 — Vendor reported approximately five hours without production issues at the stated settings after the air adjustment.

Additional Air-Pressure Adjustment5 psiObservation
Vendor trial observation

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier trial, 22–23 October 2024 — Vendor increased supply air another 5 psi after a low-pressure alarm.

Solids Discharge Interval4 to 5 minObservation
Vendor trial observation

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier trial, 22–23 October 2024 — Vendor-reported discharge interval at 50 GPM; solids packing and post-rinse needs varied with flow.

Solids Discharge Interval12 to 13 minObservation
Vendor trial observation

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier trial, 22–23 October 2024 — Vendor-reported discharge interval at 40 GPM; solids packing and post-rinse needs varied with flow.

Automatic Recipe Flow50 GPMOperating Control
Configured trial recipe

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier trial, 22–23 October 2024 — Vendor-developed automatic recipe; 10 GPM was a slow overnight option with occasional checks recommended.

Automatic Recipe Flow40 GPMOperating Control
Configured trial recipe

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier trial, 22–23 October 2024 — Vendor-developed automatic recipe; 10 GPM was a slow overnight option with occasional checks recommended.

Automatic Recipe Flow10 GPMOperating Control
Configured trial recipe

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier trial, 22–23 October 2024 — Vendor-developed automatic recipe; 10 GPM was a slow overnight option with occasional checks recommended.

Operator-Reported Flow40 GPMObservation
Operator trial observation

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier operator report, 25 October 2024 — Operator report of the stated run; no reported issues during this 5,500 gallon observation.

Operator-Reported Outlet Turbidity21 NTUObservation
Operator trial observation

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier operator report, 25 October 2024 — Operator report of the stated run; no reported issues during this 5,500 gallon observation.

Operator-Reported Processed Volume5,500 galObservation
Operator trial observation

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

Centrifuge supplier operator report, 25 October 2024 — Operator report of the stated run; no reported issues during this 5,500 gallon observation.

Rental-Trial Planning Period1 monthTarget
Schedule basis

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

rental trial — Duration used for the trial installation planning.

Apple-Wine Inlet Turbidity> 2,000 NTUObservation
Plant-reported operating context

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

comparison-facility apple wine from fermenters — Incoming apple wine was described as above 2000 NTU.

Apple-Wine Outlet Criterion<= 60 NTUTarget
Plant preference

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

comparison-facility apple wine to acetators — Desired outlet of 60 NTU or less.

Cider Inlet Turbidity750 NTUObservation
Plant-reported operating context

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

comparison-facility acetator cider to membrane-filter feed tank — Typical incoming cider reference.

Cider Outlet Criterion<= 50 NTUTarget
Plant preference

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

comparison-facility acetator cider to membrane-filter feed tank — Typical desired outlet at or below 50 NTU depending on speed.

WDV Circulation Inlet Turbidity> 1,800 NTUObservation
Plant-reported operating context

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

comparison-facility white-distilled-vinegar membrane-filter circulation — Incoming recirculation stream was described as above 1800 NTU.

WDV Circulation Outlet Turbidity350 NTUObservation
Plant-reported operating context

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

comparison-facility white-distilled-vinegar membrane-filter circulation — Outlet reported while recirculating to remove solids.

WDV Circulation Flow25 GPMObservation
Plant-reported operating context

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

comparison-facility white-distilled-vinegar membrane-filter circulation — Flow reported for the recirculation example.

WDV Circulation Durationapproximately 8 hObservation
Plant-reported operating context

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

comparison-facility white-distilled-vinegar membrane-filter circulation — Approximate duration of the recirculation run.

Optional Trial Ethernet Run150 ftDesign Parameter
Installation planning

Applies to: Centrifuge filtration recovery and equipment-relocation evaluation

trial connectivity — Cable option conditional on IT and supplier remote-support need.

Bentonite-Treated Production Share75 %Baseline
Historical process context

Applies to: Separated filtration processing time from unattended bentonite-treatment elapsed time when evaluating post-formulation-change capacity and filter-aid demand

Post-formulation-change treatment — Bentonite-treated production share — Post-formulation-change treatment

Untreated Production Share25 %Baseline
Historical process context

Applies to: Separated filtration processing time from unattended bentonite-treatment elapsed time when evaluating post-formulation-change capacity and filter-aid demand

Post-formulation-change treatment — Untreated production share — Post-formulation-change treatment

Treatment and Processing Elapsed Time49 hoursBaseline
Historical process context

Applies to: Separated filtration processing time from unattended bentonite-treatment elapsed time when evaluating post-formulation-change capacity and filter-aid demand

Includes unattended treatment; not labor hours — Treatment and processing elapsed time — Includes unattended treatment; not labor hours

Post-Order Completion Window12 weeksTarget
Schedule target

Applies to: Defined filtration quality, capacity and filter-aid cost criteria for the centrifuge option and its post-purchase-order completion plan

AFE acceptance plan — Post-order completion window — AFE acceptance plan

Relocation Outage Allowance1 weeksEstimate
Schedule allowance

Applies to: Planned critical spares and supplier follow-up for an unbacked filtration system and inventory coverage during relocation of a leased unit

Leased filter permanent-position relocation — Relocation outage allowance — Leased filter permanent-position relocation

Engineering scope and design basis

Project scope and individual work packages are presented separately; project totals are not additive to their component values.

1 detail rows; 347 K project-family value.

Actions, Methods & Controls

ACTIVITIES IN CONTEXT

Conceptual engineering illustration: ceramic filtration

TSK-001029 · Process comparison

Separated Filtration Processing Time from Unattended Bentonite-Treatment Elapsed Time When Evaluating Post-Formulation-Change Capacity and Filter-Aid Demand

Centrifuge Filtration Recovery and Equipment-Relocation Evaluation

Conceptual engineering illustration: procurement logistics

TSK-001030 · Acceptance criteria

Defined Filtration Quality, Capacity and Filter-Aid Cost Criteria for the Centrifuge Option and Its Post-Purchase-Order Completion Plan

Centrifuge Filtration Recovery and Equipment-Relocation Evaluation

Conceptual engineering illustration: procurement logistics

TSK-001034 · Execution planning

Planned Critical Spares and Supplier Follow-Up for an Unbacked Filtration System and Inventory Coverage During Relocation of a Leased Unit

Centrifuge Filtration Recovery and Equipment-Relocation Evaluation

Additional Technical Detail

Roles & contributions
  • Centrifuge Supplier

    Vendor Startup, Training and Trial Configuration

    Vendor Contribution

    Performed rental-trial startup, operator training, meter rescaling, operating adjustments and automatic-recipe configuration.

  • Project Ownership

    Full lifecycle project ownership

    Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.

  • Plant Personnel

    Project Team Contribution

    Team Contribution

    personnel connected site utilities, participated in training and reported the 5,500-gallon production run and solids-handling observations.

Workstream context
Additional technical detail
Explore 5 detail records
  • Vendor trial and operator training

    The centrifuge supplier vendor reported onsite startup at the facility on 22–23 October 2024 after site utilities were connected. Vendor personnel trained Project stakeholder and Rene on assembly, bowl-control-valve service and a ten-minute oil-change procedure. They ran water and CIP, adjusted low supply-air pressure, compared the inline turbidity meter with site laboratory measurements, and changed its scaling to align more closely with the lab. Apple Wine trials progressed from 30 GPM at 150 psi initial backpressure to 30 GPM/100 psi/~17 NTU, then 40 GPM/100 psi/~20 NTU and 40 GPM/75 psi/~20 NTU. The following day the vendor reported 50 GPM/100 psi/23 NTU, 4–5 minute solids-discharge cycles and approximately five hours without production issues after an additional 5 psi air adjustment. They developed automatic White Foam/Cider and 50/40/10 GPM recipes; 40 GPM discharge intervals were 12–13 minutes. Post-rinse requirements depended on discharge pumpability, and occasional operator or remote checks were still recommended. Coordinated and reviewed the vendor/site evidence.

  • Operator trial observation

    A operator reported a 5,500-gallon run at 40 GPM and 21 NTU without observed issues. At 50 GPM the discharged solids were wetter. The operator found the centrifuge supplier discharge arrangement more forgiving than the centrifuge supplier solids tank and described using a plastic hopper liner to aid emptying; this is a specific observed comparison, not a universal maintenance result.

  • Rental-trial installation plan

    Included 7500 USD at the facility plant installation incidentals in the AFE planning for a one-month rental trial, separate from the supplier equipment-purchase decision.

  • product operating context

    A comparison facility described apple wine from fermenters at more than 2000 NTU with a desired outlet of 60 NTU or less; cider from acetators entered near 750 NTU and was usually targeted at 50 NTU or less before the membrane supplier feed tank. Separate cider-tank circulation removed solids rather than meeting a fixed outlet-clarity target. White-distilled-vinegar circulation was reported at more than 1800 NTU feed, about 350 NTU outlet and 25 GPM for roughly 8 hours. These are distinct product duties.

  • Spare-parts quotation

    Reviewed a 5173.50 USD spare-parts package including mechanical seals and a recommendation to hold a minor-service kit locally. The package supported downtime planning rather than documenting an executed purchase.

All portfolio connections
All portfolio connections (29)
Project ownership and delivery context

Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.

Investigated the change in daily filtration duration, evaluated centrifuge use and equipment relocation, and aligned the scope with operating constraints. Comparing approximately ten-hour filtration days with the four-hour performance objective made the capacity problem concrete and supported an informed equipment decision.

Related methods and applications
Related analysis and application artifacts
Connected collections

WHAT COMES NEXT

Complex Challenge?
Let’s Work Through It.

Engineering leadership, capital projects, and independent consulting.

Start a conversation ↗